Channeline Channeline are the expert provider of bespoke, fully-structural GRP lining solutions.

28/02/2021

This whopping 12' high X 14' wide X 2.95" wall thickness Pipe Arch is designed to transition to an 12' High X 16' wide RCP Box Structure.

A pretty looking Dog-Leg Box Culvert Liner for the iLine Group.
20/02/2021

A pretty looking Dog-Leg Box Culvert Liner for the iLine Group.

Photos of 3 different Profiles for a Project in Cleveland, Ohio. Liner was manufactured in 4ft (1.2m) section for ease o...
17/02/2021

Photos of 3 different Profiles for a Project in Cleveland, Ohio. Liner was manufactured in 4ft (1.2m) section for ease of installation and handling.

Tested to Perfection !
22/11/2020

Tested to Perfection !

28/10/2020

This is a 5'9" x 2'9" Deep Tunnel Liner heading to USA.

Yet another interesting project completed !These are fully Structural GRP sanitary chamber liners that can be dropped in...
29/09/2020

Yet another interesting project completed !

These are fully Structural GRP sanitary chamber liners that can be dropped into the existing structure easily. These custom design liners offer great chemical and abrasion resistance.

Call us for your next oddball project, we are certain to have a solution!

Need Manholes for your Slip-lining Project, yes we do manufacture those too. Easy fit, saddle style socket and spigot jo...
03/09/2020

Need Manholes for your Slip-lining Project, yes we do manufacture those too. Easy fit, saddle style socket and spigot jointing system for circular or non-circular trenchless liners. Fully structural, corrosion resistant, direct bury or reline solution.

Crazy times out there but we are busier than ever at Channeline.We are looking at a 1524mm (60") diameter transitioning ...
18/08/2020

Crazy times out there but we are busier than ever at Channeline.
We are looking at a 1524mm (60") diameter transitioning to a 1200mm (48") Circular Sliplining pipe heading to Canada.

05/08/2020

Subscribe to our YouTube channel for more videos!

Fully Structural Rehabilitation Solution !
27/07/2020

Fully Structural Rehabilitation Solution !

Address

Dubai Investment Park Second

Opening Hours

Monday 07:00 - 16:00
Tuesday 07:00 - 16:00
Wednesday 07:00 - 16:00
Thursday 07:00 - 16:00

Alerts

Be the first to know and let us send you an email when Channeline posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Channeline:

Share