06/27/2023
The Oakridge Mall redevelopment in Vancouver needed a WA TAPE-certified filtration device capable of capturing the 90th percentile average annual rainfall-runoff event and removing 80% of total suspended solids (TSS). To meet these requirements, the Jellyfish® Filter was chosen as the ideal solution as it satisfied both the LEED 6.2 credit and the City’s new upcoming Rainwater Management Bylaw. Read more at the link below
During the preliminary proposal stages of the Oakridge Mall redevelopment in 2016, H.Y. Engineering sought stormwater quality treatment solutions capable of capturing the 90th percentile average annual rainfall runoff event and removing 80% of total suspended solids (TSS). To meet these requirements