Argon Utility Infrastructure

Argon Utility Infrastructure As utility specialists, we are dedicated to providing you with a reliable, professional service to meet all your needs.

📙Case Study | ShrewsburyLearn more ⬇️ 🔗 argonutilityinfrastructure.co.uk/case-study-shrewsbury-april-2026📧 info@argonuti...
22/04/2026

📙Case Study | Shrewsbury

Learn more ⬇️
🔗 argonutilityinfrastructure.co.uk/case-study-shrewsbury-april-2026
📧 [email protected]
☎ 01767 317 689

Delivering a professional, safe, timely and compliant service to our customers is always our key focus. We take great pr...
15/04/2026

Delivering a professional, safe, timely and compliant service to our customers is always our key focus. We take great pride in ensuring we achieve and maintain a wide range of industry accreditations and standards.

Learn more ⬇️
🔗 argonutilityinfrastructure.co.uk
📧 [email protected]
☎ 01767 317 689

📙Case Study | Hans PlaceLearn more ⬇️ 🔗 argonutilityinfrastructure.co.uk/case-study-hans-place📧 info@argonutilityinfrast...
08/04/2026

📙Case Study | Hans Place

Learn more ⬇️

🔗 argonutilityinfrastructure.co.uk/case-study-hans-place
📧 [email protected]
☎ 01767 317 689

We install water infrastructure for commercial, industrial, domestic and retail premises.Our design team capture our cli...
01/04/2026

We install water infrastructure for commercial, industrial, domestic and retail premises.

Our design team capture our clients’ load requirements and liaise with the Water Authority to ensure the correct pipes are determined and design approved for the clients needs, ensuring network infrastructure costs for both clean and sewage water are calculated.

With the support of our dedicated partners we install the infrastructure and carry out mains connections onto the networks parent main.

Learn more ⬇️
🔗 argonutilityinfrastructure.co.uk
📧 [email protected]
☎ 01767 317 689

We have extensive expertise in the supply and installation of diaphragm meters up to 100 cubic meters, as well as Rotary...
25/03/2026

We have extensive expertise in the supply and installation of diaphragm meters up to 100 cubic meters, as well as Rotary and Turbine Meter Module installations.

Our team of Gas Safe-registered and Specialist Metering Engineers can accommodate all metering requirements, ensuring professional installation and commissioning. Additionally, we manage the complete installation and commissioning of Rotary and Turbine Meter Modules.

All meters supplied by Argon Utility Infrastructure will be adopted by a registered Meter Asset Manager (MAM), who will oversee their maintenance throughout their lifetime.

Learn more ⬇️
🔗 argonutilityinfrastructure.co.uk
📧 [email protected]
☎ 01767 317 689

We design and build electrical infrastructure solutions across the UK, bringing high and low voltage power to commercial...
18/03/2026

We design and build electrical infrastructure solutions across the UK, bringing high and low voltage power to commercial, industrial, domestic and retail premises.

As a trusted ICP, our design team capture our clients’ load requirements. We then liaise with the DNO to secure the specified load from the closest point of connection. All works are then compliantly delivered to NERS standards.

Any sites requiring heavy duty cut-outs or sub-stations are incorporated into our designs, and delivered as part of the overall project.

🔗 argonutilityinfrastructure.co.uk
📧 [email protected]
☎ 01767 317 689

Using SynthoCAM™ system technology, we provide our clients with professional surveying services. This state-of-the-art t...
11/03/2026

Using SynthoCAM™ system technology, we provide our clients with professional surveying services. This state-of-the-art technology is designed to survey live metallic gas pipes ranging from ½” to 48” in diameter, operating under pressures of up to 2barg. This tool is essential for diagnosing issues and maintaining the integrity of metallic gas mains and services without interrupting supply.

🔗 argonutilityinfrastructure.co.uk
📧 [email protected]
☎ 01767 317 689

📙Case Study | Cranwood HouseFor this project in North London, Argon installed a 300mm 3c waveform cable from the point o...
25/02/2026

📙Case Study | Cranwood House

For this project in North London, Argon installed a 300mm 3c waveform cable from the point of connection to a 600amp heavy duty cut-out situated in an external GRP for a temporary building supply (TBS) to give site temporary power whilst there were building works underway, UKPN carried out the energisation.

The TBS was then converted to a permanent supply after we installed the full site mains and services, and the TBS was pot ended and removed. UKPD were the adopting independent distribution network owner.

Learn more ⬇️
🔗 argonutilityinfrastructure.co.uk/case-study-cranwood-house
📧 [email protected]
☎ 01767 317 689

📙Case Study | ShrewsburyFor this project in Shrewsbury, Argon was appointed to deliver new gas infrastructure for a comm...
18/02/2026

📙Case Study | Shrewsbury

For this project in Shrewsbury, Argon was appointed to deliver new gas infrastructure for a commercial property, including installation of a new MP gas main, service connection, meter, and outlet pipework.

Learn more ⬇️
🔗 argonutilityinfrastructure.co.uk/case-study-shrewsbury
📧 [email protected]
☎ 01767 317 689

Address

61 Brunel House
Bedford
MK419TJ

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 4pm