James Power Services

James Power Services From labour only jobs to full turn-key projects,James Power Services offers a wide range of services.

In just two months of 2026, James Power Services have replaced three 11,000 volt ring main units and secured a new prope...
10/02/2026

In just two months of 2026, James Power Services have replaced three 11,000 volt ring main units and secured a new property. We’ll be moving in this week.

James Power Services

We couldn’t resist jumping on the AI trend. It’s a pleasure to meet you all !James Power Services
10/02/2026

We couldn’t resist jumping on the AI trend. It’s a pleasure to meet you all !

James Power Services

Project Update: James Power Services Kicks Off 2026It’s been a high-energy start to the year. From the ground up to the ...
05/02/2026

Project Update: James Power Services Kicks Off 2026

It’s been a high-energy start to the year. From the ground up to the overhead lines, our team has been delivering critical power infrastructure across the board. Here’s a look at what we’ve been up to:
Key Highlights
• High-Voltage Solutions: Successfully installed a new Ring Main and a High-Voltage Metering Unit for a major industrial client.
• DNO Substation Replacement: Managed the full end-to-end replacement of an 11,000V Distribution Network Operator (DNO) substation.
• Capacity Upgrades: Swapped an aging indoor 200 kVA unit for a more robust 500 kVA transformer, complete with a new Ring Main Unit (RMU) and fuse cabinet.

The James Power Services Difference: We don't just "do the job"—we manage the entire lifecycle. From pouring the bases to commissioning the substations and maintaining overhead lines, we provide a true "turnkey" service for the power industry.

Why it matters
Upgrading from 200 kVA to 500 kVA isn't just about bigger hardware; it’s about future-proofing our clients' operations and ensuring grid reliability.

Special thanks to V.A. Henderson & Son Ltd they really assisted in this project and enabled us to get it over the line.

25/12/2025

James Power Services would like to wish you all a very happy Christmas and happy New Year. We look forward to working with you all in the New Year.

Another busy day rebuilding power lines.
17/09/2025

Another busy day rebuilding power lines.

11/09/2025

At James Power Services safety is the priority, I was just reminiscing about the old times and remembering a poem I once heard at a safety briefing many years ago from Mr Middleton that has stuck with me.

“I Chose to Look the Other Way”
By Don Merrell

I could have saved a life that day, But I chose to look the other way. It wasn’t that I didn’t care, I had the time, and I was there.

But I didn’t want to seem a fool, Or argue over a . I knew he’d done the job before, If I spoke up, he might get sore.

The chances didn’t seem that bad, I’d done the same, He knew I had. So I shook my head and walked on by, He knew the risks as well as I.

He took the chance, I closed an eye, And with that act, I let him die. I could have saved a life that day, But I chose to look the other way.

Now every time I see his wife, I’ll know, I should have saved his life. That guilt is something I must bear, But it isn’t something you need share.

If you see a risk that others take, That puts their health or life at stake. The question asked, or thing you say, Could help them live another day.

If you see a risk and walk away, Then hope you never have to say, I could have saved a life that day, But I chose, to look the other way.

James Power Services has been engaged in the installation of a new 11kV substation, which has enabled the supply of powe...
05/09/2025

James Power Services has been engaged in the installation of a new 11kV substation, which has enabled the supply of power to a state-of-the-art airfield control tower.

The scope of the works undertaken encompassed the following:

- Installation of high and low voltage cables
- All off-site civil works
- Commissioning of equipment
- HV jointing and cable terminations
- LV jointing and cable terminations
- HV network shutdowns and LV backfeeding

Our team was responsible for managing and planning the entire project.

James Power Services successfully concluded a demanding two-week project for Freedom Group.  This involved the installat...
11/04/2025

James Power Services successfully concluded a demanding two-week project for Freedom Group. This involved the installation of 300 meters of low- and high-voltage cabling, construction of a new precast base, earthing and commissioning, and installation of a new substation. The substation comprises two high-voltage switches and a dedicated low-voltage supply, fed by a new high-voltage pole termination, incorporating a high-voltage branch joint and a new feed to the existing low-voltage overhead line. Following this, the team removed and decommissioned the obsolete overhead transformer and redundant low-voltage overhead lines. We received assistance from Ralph Davies on this project, utilizing a Tirfor to remove the old transformer due to challenging access conditions. Ralph Davies

Been another busy week this week,  rebuilding Overhead Lines
28/03/2025

Been another busy week this week, rebuilding Overhead Lines

Happy 72nd birthday to our dad today! 🎉🎂 It's a great day to celebrate with him on site. We have no doubt we wouldn't be...
06/03/2025

Happy 72nd birthday to our dad today! 🎉🎂 It's a great day to celebrate with him on site. We have no doubt we wouldn't be where we are without his help. 🙏

Address

Margate
Margate

Alerts

Be the first to know and let us send you an email when James Power Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organisation

Send a message to James Power Services:

Share