ReThink9

ReThink9 www.rethink9.com - A traffic calming and pedestrian safety project in Hillsboro, Virginia. This page will correct inaccurate information and reply to factual-based questions. Posts with profanity will be removed and irrelevant material deleted.

02/10/2020

REMINDER: tree trimming and clearing will begin this week on Route 9 at the eastern end of Town.

02/09/2020

Beginning Monday, 2/10, please anticipate roadwork on Stony Point Road within Hillsboro Town limits and Route 9 at the western end of Town in order to perform drinking water line crossings during VDOT approved non-peak work hours (9 a.m. to 3:30 p.m.), weather permitting.

Flagging operations may limit traffic to a single lane of travel on both roadways.

Accident in center of HillsboroExpect delays
02/07/2020

Accident in center of Hillsboro
Expect delays

02/06/2020

This month, tree trimming and clearing will begin on Route 9 in Hillsboro between Hillsboro Road (Rt. 690S) and Mountain Road (Rt. 690N) to prepare for utility work and pole relocation related to the ReThink9 Traffic Calming project and the future GapWay Trail. Read more in the latest RT9 blog post: https://rethink9.com/route-9-tree-clearing-and-survey-work/

02/05/2020

On Wednesday, please anticipate a single lane closure with flagging operations on Route 9 during VDOT-approved work hours (9:00 a.m. to 3:30 p.m.) as work progresses for the safe drinking water project in Town.

02/04/2020

Today, we noticed VDOT working in one lane along Stony Point Road as we were driving through town. It appears they are repairing the shoulder. Please slow down and drive safely as you navigate around their construction work. #drivesafely #VDOTrepairs

02/03/2020

There may be intermittent or short duration lane closures on Monday on Route 9 during approved work hours (9:00 a.m. to 3:30 p.m.) to continue delivering safe drinking water to Town residents.

Remember to check the ReThink9 website for traffic updates for the week ahead:  https://rethink9.com/traffic-alerts/
02/03/2020
Traffic Alerts - ReThink9

Remember to check the ReThink9 website for traffic updates for the week ahead: https://rethink9.com/traffic-alerts/

Traffic Alerts FEB 3-7: Route 9/Charles Town Pike Road Work Safe Drinking Water Project Construction continues in Town. Flagging operations with intermittent lane closures as necessary on Route 9 is expected during VDOT approved non-peak work hours (9 a.m. to 3:30 p.m.), weather permitting, at the w...

01/27/2020
ReThink9

Work continues this week with a single lane closure requiring flagging operations nearly every day. Please expect slight delays.

Lane closure on Rt. 9 with flagging operations will be in effect during VDOT approved non-peak work hours (9:00 a.m. - 3:30 p.m.) for most of the week, weather permitting.

Please anticipate and plan for delays.

01/21/2020

Lane closure on Rt. 9 with flagging operations will be in effect during VDOT approved non-peak work hours (9:00 a.m. - 3:30 p.m.) for most of the week, weather permitting.

Please anticipate and plan for delays.

01/20/2020

ICYMI: No road work on Rt. 9 today, Jan. 20 (Martin Luther King, Jr. Day).

01/20/2020

No road work on Rt. 9 on Monday, Jan. 20 (Martin Luther King, Jr. Day).

The Town recently announced it developed with project engineers and construction team a macro schedule. Construction beg...
01/16/2020
PRESS RELEASE: The Town of Hillsboro Releases ReThink9 Construction Schedule - ReThink9

The Town recently announced it developed with project engineers and construction team a macro schedule. Construction begins March 2020 and finishes in late Spring 2021. Read the official announcement/press release here on the project website: https://rethink9.com/press-release-rethink9-construction-schedule/

Schedule built to address major concerns of broad community; transformative Route 9 project in historic Hillsboro begins in March with completion expected in May 2021.

As a reminder, all current construction work on Rt. 9 within the Town of Hillsboro is related to the ongoing Safe Drinki...
01/16/2020
Town of Hillsboro Safe Drinking Water Project - ReThink9

As a reminder, all current construction work on Rt. 9 within the Town of Hillsboro is related to the ongoing Safe Drinking Water project to bring drinkable water to Town residents. Read about it here: https://rethink9.com/town-of-hillsboro-safe-drinking-water-project/

Town of Hillsboro Safe Drinking Water Project Jul 10, 2019 First settled in 1752, Hillsboro is among the oldest, smallest and best-preserved incorporated towns in the Commonwealth, with the entire Town on the National Register of Historic Places. In the early 1800s, residents began receiving drinkin...

01/15/2020

Flagging operations and lane closures continue on Rt. 9 during VDOT approved non-peak work hours (9:00 a.m. - 3:30 p.m.) this week with large vehicles anticipated to enter and exit the lane closure area.

01/07/2020
Town of Hillsboro, Virginia - The Gap

If you can't stay off the roads tonight, please drive carefully and stay alert, slow down and make sure your headlights are on. Be safe!

All Town meetings tonight, Tuesday evening, are cancelled or postponed due to the inclement weather.

Please remember to check the Traffic Alerts page for the latest news on flagging operations and construction updates: ht...
01/07/2020
Traffic Alerts - ReThink9

Please remember to check the Traffic Alerts page for the latest news on flagging operations and construction updates: https://rethink9.com/traffic-alerts/

Traffic Alerts WEEK OF JANUARY 6: Route 9 Roadway Construction Safe Drinking Water Project Flagging operations will be back on Rt. 9 beginning Monday, Jan. 6 with limited lane closure as necessary during VDOT approved non-peak work hours (9 a.m. to 3:30 p.m.) Reminder: Intermittent flagging operatio...

01/06/2020

Reminder: Flagging operations on Rt. 9 will start again today during VDOT approved non-peak work hours (9:00 a.m. - 3:30 p.m.).

01/06/2020

Flagging operations on Rt. 9 will start again on Monday, January 6, 2020 during VDOT approved non-peak work hours (9:00 a.m. - 3:30 p.m.) for the safe drinking water project.

Happy New Year!
01/01/2020

Happy New Year!

12/22/2019

The Town's holiday gift to everyone is no roadwork on Rt. 9 for the final two weeks of 2019. Happy Holidays!

12/19/2019

There is no work on Rt. 9 today however roadwork patching will continue tomorrow (Fri., Dec. 20 from 9 a.m. to 3:30 p.m.). #RT9Alerts

12/18/2019

The safe drinking water construction crew will be off Rt. 9 for the last two weeks of the year over the Christmas and New Year's holidays and return to work beginning Monday, January 6, 2020. Enjoy your holiday!

12/18/2019

REMINDER: There will be flagging operations on Rt. 9 today, tomorrow and Friday from 9 a.m. to 3:30 p.m. as the Town continues the safe drinking water project.

12/17/2019

Flagging operations for our safe drinking water project will be on Rt. 9 only on Wednesday, Thursday and Friday this week.

The concrete forming our water treatment plant is heated at 70 degrees for several days to ensure proper curing. #FunFac...
12/13/2019

The concrete forming our water treatment plant is heated at 70 degrees for several days to ensure proper curing. #FunFactFriday

12/12/2019

Did you receive our ReThink9 Dispatch this week? Sign up at www.rethink9.com to get project updates through our e-newsletter.

12/06/2019

Our safe drinking water project uses approximately 30,000 pounds of rebar! #FunFactFriday

"Thank all of you for the thoughtful input and the civil and productive dialogue. We are all in this together and we wil...
11/28/2019
How Public Input Shaped the ReThink9 Traffic Management Framework - ReThink9

"Thank all of you for the thoughtful input and the civil and productive dialogue. We are all in this together and we will all share in this burden and inconvenience. Please know that the Town of Hillsboro is committed to delivering this project safely, with the highest of quality and as quickly as possible. Route 9’s dramatic improvements within the Town boundaries will benefit residents and all who depend upon it, by ensuring safety and reducing congestion." - Mayor Roger L. Vance

Mayor Vance provides a recap of the major elements of the ReThink9 Project and how public input went into the final maintenance of traffic framework.

Today is the last day of construction on Rt. 9 while our crew takes a Thanksgiving holiday break. Our work schedule is 9...
11/26/2019
Traffic Alerts - ReThink9

Today is the last day of construction on Rt. 9 while our crew takes a Thanksgiving holiday break. Our work schedule is 9:00 a.m. to 3:30 p.m.

Traffic Alerts Reminder: Intermittent flagging operations will occur on Charles Town Pike (Route 9) in the heart of Hillsboro, Va. Please stay alert and follow the direction of the flaggers. SATURDAY, NOV. 23: Route 9 / Spring Lane Saturday only: Work will occur at the water treatment plant. Please....

11/25/2019

The drinking water line construction will be on Rt. 9 Mon and Tues only this week, 9 a.m. to 3:30 p.m. Enjoy the Thanksgiving break!

11/23/2019

REMINDER: TODAY ONLY, work will occur at the water treatment plant. Please be alert for occasional construction vehicles accessing Spring Lane in center of Town.

11/23/2019

Saturday only in Hillsboro: Work will occur at the water treatment plant. Please be alert for occasional construction vehicles accessing Spring Lane in center of Town.

This bucket holds 1 cubic yard of concrete. It's in use as we  form the walls of our drinking water treatment site. #Fun...
11/22/2019

This bucket holds 1 cubic yard of concrete. It's in use as we form the walls of our drinking water treatment site. #FunFactFriday

11/19/2019

Thank you to everyone who attended last week's Public Information Session. Your input is valuable to the project team and we look forward to seeing more faces at the next project update on December 10.

11/18/2019

ICYMI: VDOT's road work on the section of Rt. 719 (Stony Point Rd.) between Woodgrove Rd. and Rt. 9 will be repaved on Monday, Nov. 18 or Tuesday, Nov. 19.

11/16/2019

According to VDOT, due to the expected low temperatures today, the work on Rt. 719 is postponed to Monday or Tuesday next week.

11/15/2019

REMINDER: Weather permitting, VDOT's paving of Rt. 751 (Cider Mill Rd.) will be completed today.

11/15/2019

REMINDER OF WEEKEND WORK: Weather permitting, VDOT's road work on the section of Rt. 719 (Stony Point Rd.) between Woodgrove Rd. and Rt. 9 will be repaved on Friday, Nov 15 and Saturday, Nov 16.

UPDATE: According to VDOT, due to the expected low temperatures on Saturday, Nov. 15, the work on Rt. 719 is postponed to Monday or Tuesday next week.

Last week, the Town of Hillsboro opened bids from three qualified prime contractors for its ReThink9 Traffic Calming and...
11/14/2019
PRESS RELEASE: Town of Hillsboro Opens Bids on Schedule for Traffic Calming and Pedestrian Safety Project - ReThink9

Last week, the Town of Hillsboro opened bids from three qualified prime contractors for its ReThink9 Traffic Calming and Pedestrian Safety Project. We are pleased to say that reworking the MOT with the data-driven process of our engineers, VDOT Northern Virginia and Staunton districts, has resulted in a nearly $6 million savings from the previous lowest bid!

Volkert Engineering, which is the project’s design and construction management firm, has begun a detailed analysis of each bid and will present those results to the Town's project team. Upon validation of the bids, the Town anticipates signing a contract by the end of November, ideally just before Thanksgiving.

Read more about the bid opening here: https://rethink9.com/press-release-town-of-hillsboro-opens-bids-on-schedule-for-traffic-calming-and-pedestrian-safety-project/

The Town of Hillsboro opened bids from three qualified prime contractors for its ReThink9 Traffic Calming and Pedestrian Safety Project on Thursday, Nov. 7, 2019.

11/14/2019

There is a water leak on Gaver Mill Road. Please avoid the area while we identify and fix the issue.

11/14/2019

An update from VDOT regarding local paving operations: Weather permitting, the VDOT contractor will COMPLETE ALL MILLING AND PAVING THIS WEEKEND. The paving of Rt. 751 will be completed tomorrow, Nov. 15. The section of Rt. 719 between Woodgrove Rd. and Rt. 9 will be repaved on Friday, Nov. 15 and Saturday, Nov 16.

Address

Hillsboro, VA

Alerts

Be the first to know and let us send you an email when ReThink9 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ReThink9:

Nearby government services


Other Public & Government Services in Hillsboro

Show All