07/20/2026
East Pine Street Project- The Borough Public Works would like to give an update on the East Pine Street project and would ask that you pass this information on to other residents.
On Thursday July 23, 2026, E. Pine Street will be closed for the day so that UGI and the Borough can work on the street without any vehicle traffic. UGI needs to put a six-inch gas line under the new drainpipe that was installed for the Race Waterway. The Borough will be working on forming sidewalks and curbing along E. Pine Street. No Parking signs will be placed in the areas that curbing will be installed and or replaced.
When UGI completes the install of the gas pipe, the Borough will be removing some of the stones over the areas we previously worked on and placing the blacktop base down. Pennsy was awarded the bid for the milling and paving of E. Pine Street. Sometime in August (date not set) Pennsy will mill down the roadway from the railroad tracks to the Mountain Creek Bridge. After milling the entire roadway will be blacktopped and resurfaced. This will also require the roadway to be closed to traffic during this period. Thank you and drive safe!