Pocatello Street Operations Department

Pocatello Street Operations Department The City of Pocatello Street Operations Department provides public services related to the safe and efficient movement of traffic on the city's streets.

The City of Pocatello Street Operations Department has created a new way to communicate with the public. This page is for official communication purposes only. Self-promotion and or promotion of business interests on this page is non-sanctioned. Individuals or organizations who attempt to use this page for promotional purposes will have their communication removed and be "banned" in Facebook terminology from using this space. It is an expectation that users of this space use non-offensive language and be civil in their communication. Expectation violations will be removed and banned. The City of Pocatello Social Media Terms of Use can be found at bit.ly/1l64djU

10/17/2019

ROAD CLOSURES & TRAFFIC REPORTS
Beginning the week of October 21, 2019

• STREET OPERATIONS DEPARTMENT:
• SWEEPING
o Monday: West Side
o Tuesday: East Side
o Wednesday: Northend
o Thursday: El Rancho/Fairway/Monte Vista

• PAVING
Street Operations crews will be milling and paving Lincoln Avenue on Monday, October 21, 2019 and Tuesday, October 22, 2019. Lincoln Avenue will be closed from Wyeth Street to Clark Street between 7:00 am to 5:00 pm each day during the project.

• PATCHING
Street Operations will continue patching potholes and curb lines in preparation for upcoming pavement treatments, which may require intermittent lane closures and possible temporary road closures as work is performed.

• PAVEMENT MARKINGS
Street Operations Department will continue painting crosswalks and other pavement markings in various parts of the city. There will be intermittent lane closures while crews are painting. Drivers are advised to use caution to avoid wet paint and may experience delays at the work
sites.

• IDAHO TRANSPORTATION DEPARTMENT:
• I-15 ROAD CONSTRUCTION PROJECTS
Reconstruction of Rose Road Interchange on I-15. This project will improve mobility and safety on Interstate 15. Construction will be completed in late 2019.

• Northgate Overpass above I-15 is currently under construction and projected to be completed by November 1, 2019.

• ENGINEERING: No reports

• CONTRACTORS:
• NORTHGATE
A-Plus Contractor will be closing Fairgrounds Road for replacement of sewer lines. Closure will be at Chubbuck Road and Olympus Drive. Motorists are advised to use alternate routes. A-Plus Contractor expects to have Fairgrounds Road closed for 3 weeks. If you have questions on this project you can call Merril Quayle Public Works Engineer at 208-234-6228

• WATER POLLUTION CONTROL:
• JETTING SEWER LINES
Crews will be jetting sewer lines throughout the city. Motorists may experience delays or lane closures while crews are performing the work.

• PUBLIC WORKS DEPARTMENT:
• BENTON STREET BRIDGE
Southbound shoulder on 1st Ave., under the Benton Street Bridge, will be closed periodically for the next few months, as needed, to allow the Contractor to perform work. Benton Street Bridge will be reduced to one lane of traffic each direction over the bridge.

• WATER DEPARTMENT:
• PROJECT ON NORTH LINCOLN AVENUE
Beginning Monday, September 16, 2019, crews from the City of Pocatello Water Department will begin installing a new water line on North Lincoln Avenue. The project is anticipated to take approximately eight weeks to complete.
Crews will work between the hours of 7:00 a.m. to approximately 5:00 p.m. Monday through Thursday. During the project, access to the construction area will be restricted and sections of the street will be completely closed while workers are digging. Every effort will be made to provide local access to the area when possible. Parking will also be restricted in the construction zone and residents are asked to park all vehicles away from the area during the day. At the close of each day, access will be restored to all properties. Residents with questions about the project are asked to contact the City of Pocatello Water Department at 208-234-6174.

• EVENTS:
• PORTNEUF VALLEY FARMERS MARKET May 4th – October 26th 5-8 PM
Union Pacific Avenue and Fremont Street (from Main St. to U.P. Ave) will be closed during this event at the times posted. Old Town Pocatello is hosting the “Portneuf Valley Farmers Market” every Saturday beginning May 4 through October 26, 2019. The event is located at the Old Town Pavilion, 420 N. Main St. The Market is open every Saturday from 9am to 1pm May through October, and every Wednesday May 22 to September 4 from 5-8pm.

10/13/2019

ROAD CLOSURES & TRAFFIC REPORTS
Beginning the week of October 14, 2019

• STREET OPERATIONS DEPARTMENT:
• SWEEPING
o Monday: West Side
o Tuesday: East Side
o Wednesday: Northend
o Thursday: El Rancho/Fairway/Monte Vista

• PATCHING
Street Operations will continue patching potholes and curb lines in preparation for upcoming pavement treatments, which may require intermittent lane closures and possible temporary road closures as work is performed.

• PAVEMENT MARKINGS
Street Operations Department will continue painting crosswalks and other pavement markings in various parts of the city. There will be intermittent lane closures while crews are painting. Drivers are advised to use caution to avoid wet paint and may experience delays at the work
sites.

• IDAHO TRANSPORTATION DEPARTMENT:
• I-15 ROAD CONSTRUCTION PROJECTS
Reconstruction of Rose Road Interchange on I-15. This project will improve mobility and safety on Interstate 15. Construction will be completed in late 2019.

• Northgate Overpass above I-15 is currently under construction and projected to be completed by November 1, 2019.

• ENGINEERING: No reports

• CONTRACTORS:
• NORTHGATE
A-Plus Contractor will be closing Fairgrounds Road for replacement of sewer lines. Closure will be at Chubbuck Road and Olympus Drive. Motorists are advised to use alternate routes. A-Plus Contractor expects to have Fairgrounds Road closed for 3 weeks. If you have questions on this project you can call Merril Quayle Public Works Engineer at 208-234-6228
• WATER POLLUTION CONTROL: No reports

• PUBLIC WORKS DEPARTMENT:
• BENTON STREET BRIDGE
Southbound shoulder on 1st Ave., under the Benton Street Bridge, will be closed periodically for the next few months, as needed, to allow the Contractor to perform work. Benton Street Bridge will be reduced to one lane of traffic each direction over the bridge.

• WATER DEPARTMENT:
• PROJECT ON NORTH LINCOLN AVENUE
Beginning Monday, September 16, 2019, crews from the City of Pocatello Water Department will begin installing a new water line on North Lincoln Avenue. The project is anticipated to take approximately eight weeks to complete.
Crews will work between the hours of 7:00 a.m. to approximately 5:00 p.m. Monday through Thursday. During the project, access to the construction area will be restricted and sections of the street will be completely closed while workers are digging. Every effort will be made to provide local access to the area when possible. Parking will also be restricted in the construction zone and residents are asked to park all vehicles away from the area during the day. At the close of each day, access will be restored to all properties. Residents with questions about the project are asked to contact the City of Pocatello Water Department at 208-234-6174.

• EVENTS:
• PORTNEUF VALLEY FARMERS MARKET May 4th – October 26th 5-8 PM
Union Pacific Avenue and Fremont Street (from Main St. to U.P. Ave) will be closed during this event at the times posted. Old Town Pocatello is hosting the “Portneuf Valley Farmers Market” every Saturday beginning May 4 through October 26, 2019. The event is located at the Old Town Pavilion, 420 N. Main St. The Market is open every Saturday from 9am to 1pm May through October, and every Wednesday May 22 to September 4 from 5-8pm.

10/10/2019

ROAD CLOSURES & TRAFFIC REPORTS
Beginning the week of October 14, 2019

• STREET OPERATIONS DEPARTMENT:
• SWEEPING
o Monday: West Side
o Tuesday: East Side
o Wednesday: Northend
o Thursday: El Rancho/Fairway/Monte Vista

• PATCHING
Street Operations will continue patching potholes and curb lines in preparation for upcoming pavement treatments, which may require intermittent lane closures and possible temporary road closures as work is performed.

• PAVEMENT MARKINGS
Street Operations Department will continue painting crosswalks and other pavement markings in various parts of the city. There will be intermittent lane closures while crews are painting. Drivers are advised to use caution to avoid wet paint and may experience delays at the work
sites.

• IDAHO TRANSPORTATION DEPARTMENT:
• I-15 ROAD CONSTRUCTION PROJECTS
Reconstruction of Rose Road Interchange on I-15. This project will improve mobility and safety on Interstate 15. Construction will be completed in late 2019.

• Northgate Overpass above I-15 is currently under construction and projected to be completed by November 1, 2019.

• ENGINEERING: No reports

• CONTRACTORS:
• NORTHGATE
A-Plus Contractor will be closing Fairgrounds Road for replacement of sewer lines. Closure will be at Chubbuck Road and Olympus Drive. Motorists are advised to use alternate routes. A-Plus Contractor expects to have Fairgrounds Road closed for 3 weeks. If you have questions on this project you can call Merril Quayle Public Works Engineer at 208-234-6228
• WATER POLLUTION CONTROL: No reports

• PUBLIC WORKS DEPARTMENT:
• BENTON STREET BRIDGE
Southbound shoulder on 1st Ave., under the Benton Street Bridge, will be closed periodically for the next few months, as needed, to allow the Contractor to perform work. Benton Street Bridge will be reduced to one lane of traffic each direction over the bridge.

• WATER DEPARTMENT:
• PROJECT ON NORTH LINCOLN AVENUE
Beginning Monday, September 16, 2019, crews from the City of Pocatello Water Department will begin installing a new water line on North Lincoln Avenue. The project is anticipated to take approximately eight weeks to complete.
Crews will work between the hours of 7:00 a.m. to approximately 5:00 p.m. Monday through Thursday. During the project, access to the construction area will be restricted and sections of the street will be completely closed while workers are digging. Every effort will be made to provide local access to the area when possible. Parking will also be restricted in the construction zone and residents are asked to park all vehicles away from the area during the day. At the close of each day, access will be restored to all properties. Residents with questions about the project are asked to contact the City of Pocatello Water Department at 208-234-6174.

• EVENTS:
• PORTNEUF VALLEY FARMERS MARKET May 4th – October 26th 5-8 PM
Union Pacific Avenue and Fremont Street (from Main St. to U.P. Ave) will be closed during this event at the times posted. Old Town Pocatello is hosting the “Portneuf Valley Farmers Market” every Saturday beginning May 4 through October 26, 2019. The event is located at the Old Town Pavilion, 420 N. Main St. The Market is open every Saturday from 9am to 1pm May through October, and every Wednesday May 22 to September 4 from 5-8pm.

10/06/2019

ROAD CLOSURES & TRAFFIC REPORTS
Beginning the week of October 7, 2019

• STREET OPERATIONS DEPARTMENT:
• SWEEPING
o Monday: West Side
o Tuesday: East Side
o Wednesday: Northend
o Thursday: El Rancho/Fairway/Monte Vista

• PATCHING
Street Operations will continue patching potholes and curb lines in preparation for upcoming pavement treatments, which may require intermittent lane closures and possible temporary road closures as work is performed.

• PAVEMENT MARKINGS
Street Operations Department will continue painting crosswalks and other pavement markings in various parts of the city. There will be intermittent lane closures while crews are painting. Drivers are advised to use caution to avoid wet paint and may experience delays at the work
sites.

• IDAHO TRANSPORTATION DEPARTMENT:
• I-15 ROAD CONSTRUCTION PROJECTS
Reconstruction of Rose Road Interchange on I-15. This project will improve mobility and safety on Interstate 15. Construction will be completed in late 2019.

• Northgate Overpass above I-15 is currently under construction and projected to be completed by November 1, 2019.

• ENGINEERING: No reports

• CONTRACTORS:
• A-PLUS CONTRACTORS PAVING
Monday, October 7, 2019 A-Plus Contractors is scheduled to pave W Sublette St between N Lincoln Ave and N Grant Ave. Residents who have questions about the project can contact Austin Suing, Project Engineer, at 208-234-6513.

• NORTHGATE
A-Plus Contractor will be closing Fairgrounds Road for replacement of sewer lines. Closure will be at Chubbuck Road and Olympus Drive. Motorists are advised to use alternate routes. A-Plus Contractor expects to have Fairgrounds Road closed for 3 weeks. If you have questions on this project you can call Merril Quayle Public Works Engineer at 208-234-6228
• WATER POLLUTION CONTROL: No reports

• PUBLIC WORKS DEPARTMENT:
• BENTON STREET BRIDGE
Southbound shoulder on 1st Ave., under the Benton Street Bridge, will be closed periodically for the next few months, as needed, to allow the Contractor to perform work. Benton Street Bridge will be reduced to one lane of traffic each direction over the bridge.

• WATER DEPARTMENT:
• PROJECT ON NORTH LINCOLN AVENUE
Beginning Monday, September 16, 2019, crews from the City of Pocatello Water Department will begin installing a new water line on North Lincoln Avenue. The project is anticipated to take approximately eight weeks to complete.
Crews will work between the hours of 7:00 a.m. to approximately 5:00 p.m. Monday through Thursday. During the project, access to the construction area will be restricted and sections of the street will be completely closed while workers are digging. Every effort will be made to provide local access to the area when possible. Parking will also be restricted in the construction zone and residents are asked to park all vehicles away from the area during the day. At the close of each day, access will be restored to all properties. Residents with questions about the project are asked to contact the City of Pocatello Water Department at 208-234-6174.

• EVENTS:
• PORTNEUF VALLEY FARMERS MARKET May 4th – October 26th 5-8 PM
Union Pacific Avenue and Fremont Street (from Main St. to U.P. Ave) will be closed during this event at the times posted. Old Town Pocatello is hosting the “Portneuf Valley Farmers Market” every Saturday beginning May 4 through October 26, 2019. The event is located at the Old Town Pavilion, 420 N. Main St. The Market is open every Saturday from 9am to 1pm May through October, and every Wednesday May 22 to September 4 from 5-8pm.

• SIXES PAINTING PEDISTRIAN WALKWAY IN CENTER STREET UNDERPASS
Beginning Thursday, October 3 through Monday, October 7, 2019 Sixes will be painting the south pedestrian walkway in the Center Street underpass. Sidewalk will be closed to foot traffic during this event. For additional information please contact Josh at 208-406-3654.

10/03/2019

ROAD CLOSURES & TRAFFIC REPORTS
Beginning the week of October 7, 2019

• STREET OPERATIONS DEPARTMENT:
• SWEEPING
o Monday: West Side
o Tuesday: East Side
o Wednesday: Northend
o Thursday: El Rancho/Fairway/Monte Vista

• PATCHING
Street Operations will continue patching potholes and curb lines in preparation for upcoming pavement treatments, which may require intermittent lane closures and possible temporary road closures as work is performed.

• PAVEMENT MARKINGS
Street Operations Department will continue painting crosswalks and other pavement markings in various parts of the city. There will be intermittent lane closures while crews are painting. Drivers are advised to use caution to avoid wet paint and may experience delays at the work
sites.

• IDAHO TRANSPORTATION DEPARTMENT:
• I-15 ROAD CONSTRUCTION PROJECTS
Reconstruction of Rose Road Interchange on I-15. This project will improve mobility and safety on Interstate 15. Construction will be completed in late 2019.

• Northgate Overpass above I-15 is currently under construction and projected to be completed by November 1, 2019.

• ENGINEERING: No reports

• CONTRACTORS:
• A-PLUS CONTRACTORS PAVING
Monday, October 7, 2019 A-Plus Contractors is scheduled to pave W Sublette St between N Lincoln Ave and N Grant Ave. Residents who have questions about the project can contact Austin Suing, Project Engineer, at 208-234-6513.

• NORTHGATE
A-Plus Contractor will be closing Fairgrounds Road for replacement of sewer lines. Closure will be at Chubbuck Road and Olympus Drive. Motorists are advised to use alternate routes. A-Plus Contractor expects to have Fairgrounds Road closed for 3 weeks. If you have questions on this project you can call Merril Quayle Public Works Engineer at 208-234-6228
• WATER POLLUTION CONTROL: No reports

• PUBLIC WORKS DEPARTMENT:
• BENTON STREET BRIDGE
Southbound shoulder on 1st Ave., under the Benton Street Bridge, will be closed periodically for the next few months, as needed, to allow the Contractor to perform work. Benton Street Bridge will be reduced to one lane of traffic each direction over the bridge.

• WATER DEPARTMENT:
• PROJECT ON NORTH LINCOLN AVENUE
Beginning Monday, September 16, 2019, crews from the City of Pocatello Water Department will begin installing a new water line on North Lincoln Avenue. The project is anticipated to take approximately eight weeks to complete.
Crews will work between the hours of 7:00 a.m. to approximately 5:00 p.m. Monday through Thursday. During the project, access to the construction area will be restricted and sections of the street will be completely closed while workers are digging. Every effort will be made to provide local access to the area when possible. Parking will also be restricted in the construction zone and residents are asked to park all vehicles away from the area during the day. At the close of each day, access will be restored to all properties. Residents with questions about the project are asked to contact the City of Pocatello Water Department at 208-234-6174.

• EVENTS:
• PORTNEUF VALLEY FARMERS MARKET May 4th – October 26th 5-8 PM
Union Pacific Avenue and Fremont Street (from Main St. to U.P. Ave) will be closed during this event at the times posted. Old Town Pocatello is hosting the “Portneuf Valley Farmers Market” every Saturday beginning May 4 through October 26, 2019. The event is located at the Old Town Pavilion, 420 N. Main St. The Market is open every Saturday from 9am to 1pm May through October, and every Wednesday May 22 to September 4 from 5-8pm.

• SIXES PAINTING PEDISTRIAN WALKWAY IN CENTER STREET UNDERPASS
Beginning Thursday, October 3 through Monday, October 7, 2019 Sixes will be painting the south pedestrian walkway in the Center Street underpass. Sidewalk will be closed to foot traffic during this event. For additional information please contact Josh at 208-406-3654.

Address

2405 Garrett Way
Pocatello, ID
83201

General information

The Street Operations Department is responsible for the repair and maintenance of all City streets, alleys, flood-ways, and rights-of-way. These responsibilities include sweeping, patching, plowing/sanding, roadway markings, signs, signals, storm water management, levee maintenance, and various other activities. The department is currently responsible for 265 center-line miles of roadway.

Opening Hours

Monday 07:00 - 15:30
Tuesday 07:00 - 17:00
Wednesday 06:30 - 15:30
Thursday 07:00 - 15:30
Friday 07:00 - 15:30

Telephone

(208) 234-6250

Alerts

Be the first to know and let us send you an email when Pocatello Street Operations Department posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Pocatello Street Operations Department:

Videos