Brigade Fire Protection Inc

Brigade Fire Protection Inc Fire Sprinklers Save Lives

Fixing other peoples leaks.
07/28/2025

Fixing other peoples leaks.

New residential sprinkler system being installed in a prefab home.
12/12/2024

New residential sprinkler system being installed in a prefab home.

From this 1922 mess to a much simpler riser with backflow prevention to meet today’s standard. Removed all the trim pipi...
10/02/2024

From this 1922 mess to a much simpler riser with backflow prevention to meet today’s standard. Removed all the trim piping related to the non functioning water motor gong and turned the alarm valve into a straight pipe riser complete with new paddle flow switch and electric bell located on the exterior of the building. This building does not have a fire alarm system so the butterfly valves are chained and locked open with a breakable lock per code. The flow switch and bell were added to provide the building owner with some piece of mind that in a water flow situation they would have some form of notification. Along with a new 6” sprinkler entrance to replace the corroded existing cast iron entrance.

Another sprinkler contractor who maintains this building did not want to tackle a project like this. They reached out to...
10/02/2024

Another sprinkler contractor who maintains this building did not want to tackle a project like this. They reached out to me after hearing this was something that I would definitely tackle. The sprinkler system was installed in 1922 and the portion of underground piping entering the building was also dated back in that era. The leaded joint inside the building foundation has been leaking for a long enough period of time that the piece of steel pipe was rotted to the point that there was a fear of a major failure causing the building to flood. New 6” Ductile Iron Cement Lined piping was installed along with a new 6” Backflow preventer as there was not one originally installed. The granite rock foundation was definitely a fighter but we got through it. Tomorrow we will finish up the new install and add an additional electric paddle flow switch and electrical bell on the exterior of the building as the original water motor going was not only shut off and left off but also was located in the basement of the building instead of on the exterior.

Night work up in Gilford NH.
09/06/2024

Night work up in Gilford NH.

Just here trying to make sense of this mess lol. HVAC air handling units being replaced requires the existing sprinkler ...
08/13/2024

Just here trying to make sense of this mess lol. HVAC air handling units being replaced requires the existing sprinkler piping and sprinkler heads to be reworked for the change in size as well as locations. Just another day on the job.

Brown School Apartments project in Berlin NH has been completed. Renovation and conversion from a former Elementary Scho...
07/30/2024

Brown School Apartments project in Berlin NH has been completed. Renovation and conversion from a former Elementary School to an Apartment Complex. Originally a Steel NFPA 13 system now converted to a full NFPA 13R system with a combination of Steel and CPVC piping complete with a new sprinkler riser including backflow preventer, fire department connection, drains and switches. Today was the final with the local authority having jurisdiction (Berlin Fire Department) including testing of all the system functions. We also provided the building with new fire extinguisher to complete the life safety portion of the project. “Fire Sprinklers Save Lives”l

Time to replace the 37 year old air compressor with a slightly newer model. Warner NH
07/23/2024

Time to replace the 37 year old air compressor with a slightly newer model. Warner NH

Out with the old, outdated and non code compliant and in with the new. Definitely cleaned up nice. Brown School Apartmen...
05/20/2024

Out with the old, outdated and non code compliant and in with the new. Definitely cleaned up nice. Brown School Apartments, Berlin NH

When a 3/8” Low Point Drain Valve from 1939 is no longer operational but you still need to replace the rusted out piping...
04/16/2024

When a 3/8” Low Point Drain Valve from 1939 is no longer operational but you still need to replace the rusted out piping you improvise!

A plumber noticed this piping under a floor while renovating a unit in this building. We have repaired and replaced so m...
04/09/2024

A plumber noticed this piping under a floor while renovating a unit in this building. We have repaired and replaced so many of these throughout this property. The numbers are in the hundreds. (Not one of our original installations)

Brown School Apartments, Berlin NH. Here are some of the units approaching finishes on the old gym side of the building ...
03/19/2024

Brown School Apartments, Berlin NH. Here are some of the units approaching finishes on the old gym side of the building and the completed rough-in on the older 2.5 story portion of the building. Next up we need to install the new riser and equipment along with the rough-in of the core areas of the building then onto the finishes.

Address

337 Franklin Road
Salisbury, NH
03268

Telephone

+16038487372

Website

Alerts

Be the first to know and let us send you an email when Brigade Fire Protection Inc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share