DC Water David Gadis, CEO and General Manager

The District of Columbia Water and Sewer Authority provides drinking water and wastewater services to residents, visitors and employees of the District and parts of the surrounding area.

Heads up, neighbors. A controlled blast is rescheduled for 7:30 p.m. tonight (Monday, Aug. 3) as part of DC Water’s Poto...
08/03/2026

Heads up, neighbors. A controlled blast is rescheduled for 7:30 p.m. tonight (Monday, Aug. 3) as part of DC Water’s Potomac River Tunnel Project near the Georgetown University entrance on Canal Road NW.

For everyone’s safety, police and flaggers will temporarily stop traffic on Canal Road NW between the university entrance and Foxhall Road NW, as well as West Road NW near the construction site, beginning about five minutes before the blast. Traffic will resume once the area has been cleared.

You may hear a brief loud noise or feel light shaking.

Thank you for your patience as we continue this important infrastructure project to help protect the Potomac River.

Over the weekend, our team joined The Federal City Alumnae Chapter DST’s 19th Annual Community Day in Deanwood.We helped...
08/03/2026

Over the weekend, our team joined The Federal City Alumnae Chapter DST’s 19th Annual Community Day in Deanwood.

We helped keep the community hydrated with fresh DC tap water 💧 while sharing information about our Lead-Free DC program and answering questions about the resources available to customers.

📸 Bonus moment: Councilmember Wendell Felder stopped for a photo with Wendy!

Thank you to everyone who stopped by our table. We always appreciate opportunities to connect with the communities we serve. 💙

🌱 Bloom Soil is turning 10 this month! 🎉 For the past decade, Bloom has been turning biosolids into a resource that bene...
08/03/2026

🌱 Bloom Soil is turning 10 this month! 🎉

For the past decade, Bloom has been turning biosolids into a resource that benefits our region in more ways than one.

From improving soil health and supporting agriculture to generating renewable energy, reducing our carbon footprint, and creating value for our customers, Bloom continues to show what’s possible when we rethink waste.

Take a look back at 10 years of impact and see what’s ahead by reading our new report: A Decade of Bloom. 📖👇

https://www.flipsnack.com/BFE55E88B7A/decadeofbloom?utm_source=ig&utm_medium=social&utm_content=link_in_bio

A major milestone in protecting critical infrastructure. 👏DC Water has completed the first of four emergency repair proj...
07/30/2026

A major milestone in protecting critical infrastructure. 👏

DC Water has completed the first of four emergency repair projects on the Potomac Interceptor sewer line, strengthening a 600-foot section of pipe at Dulles International Airport.

After inspections identified corrosion, worn concrete, and exposed steel supports, crews repaired a 175-foot section with a strong, concrete-like lining before installing a cured-in-place pipe (CIPP) liner, creating a new pipe within the existing one. Together, these repairs restored the pipe to like-new condition.

This work helps protect public health, the environment, and the long-term reliability of a critical sewer line while advancing the ongoing rehabilitation of the Potomac Interceptor.

🔗 https://www.dcwater.com/about-dc-water/media/news/critical-repairs-complete-potomac-interceptor-sewer-line-dulles

07/30/2026

We’re still celebrating our 2026 Team Blue interns! 💙

In honor of , meet some of the talented interns making an impact across DC Water this summer.

From engineering and water quality to communications, finance, IT, and beyond, thank you to our entire intern cohort for your hard work, dedication, and contributions to Team Blue.

Happy National Intern Day to our 2026 Team Blue interns! 💧Today, we’re celebrating the talented interns who have spent t...
07/30/2026

Happy National Intern Day to our 2026 Team Blue interns! 💧

Today, we’re celebrating the talented interns who have spent the summer learning, growing, and making a real impact across DC Water. Thank you for your hard work, fresh perspectives, and dedication to Team Blue.

We appreciate everything you’ve contributed this summer. And a special thanks to our communications intern, Erica, for creating today’s graphic as part of her summer internship experience. 👏

07/29/2026

Today, crews installed a cured-in-place pipe (CIPP) repair liner into the Potomac Interceptor sewer pipe, marking another milestone on DC Water’s Potomac Interceptor Rehabilitation Project near Dulles International Airport.

The white material being lowered from the truck is the CIPP repair liner. Crews lower the liner into a manhole before inserting it into the sewer pipe. Once cured, it forms a durable new layer inside the existing pipe.

This trenchless repair method strengthens the pipe from the inside, helping prevent future failures while minimizing impacts to the surrounding area. By investing in proactive infrastructure improvements today, we’re helping ensure reliable wastewater service for the region for decades to come.

07/29/2026

Ever wonder what happens to the things that shouldn’t be flushed? 👀

Meet Jun Fang, DC Water’s Manager of Process Engineering, as he gives us a closer look at the fine screens at Blue Plains and the role they play in the wastewater treatment process.

Think of the filtration as the first line of defense. Similar to how floss helps keep unwanted material from building up between your teeth, these screens help capture items that don’t belong as wastewater enters the treatment process.

Plastic bottles, rags, feminine hygiene products and other trash can clog pipes, damage equipment and create costly maintenance issues.

As we wrap up , help protect our infrastructure by keeping plastic and other trash out of our drains and waterways. 💧♻️

DC Water has completed the first major step in emergency repairs to a 175-foot section of the Potomac Interceptor near P...
07/27/2026

DC Water has completed the first major step in emergency repairs to a 175-foot section of the Potomac Interceptor near Pennyfield Lock.

After inspections found serious wear and damage, crews installed a new concrete-like geopolymer lining inside the pipe to strengthen it. This work is part of ongoing repairs to 1,700 linear feet of sewer pipe near Pennyfield Lock.

Repairing the pipe from the inside strengthens critical infrastructure, reduces disruption to nearby communities, and helps protect the Potomac River.

Crews are now preparing for the next phase of repairs, which will include installing a new pipe inside the existing one to further strengthen this critical section of the sewer line.

Learn more: https://www.dcwater.com/about-dc-water/media/news/dc-water-completes-first-major-step-potomac-interceptor-sewer-line

☀️ Sunscreen? ✔️💧 Reusable water bottle? ✔️🏡 Service line status? That’s worth checking too.This UV Safety Month, sunscr...
07/27/2026

☀️ Sunscreen? ✔️
💧 Reusable water bottle? ✔️
🏡 Service line status? That’s worth checking too.

This UV Safety Month, sunscreen is only part of the routine. Take a minute to check your home’s service line status and see if you qualify for a FREE Lead Service Line Replacement.

Check your status: dcwater.com/lead

Address

Washington D.C., DC

Alerts

Be the first to know and let us send you an email when DC Water posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share