07/09/2026
🚧 Douglas Avenue Pilot 🚧
Don't forget! There is construction for a pilot project along Douglas from Washington to Grove. The pilot aims to slow down cars, improve safety for pedestrians and students, and reduce crashes.
Changes for the pilot include converting to a three-lane roadway configuration with on-street bicycle lanes, curb extensions, parking modifications, and enhanced crosswalks.
➡️ City staff will collect pedestrian, bicycle, and vehicular counts; monitor intersections to determine whether traffic signal timing modifications are needed; and collect speed and travel-time data.
To help with school traffic, no work will be done during the week between I-135 and Grove while school is in session.