Sunbury Line Upgrade

Sunbury Line Upgrade The Sunbury Line Upgrade will allow more modern trains to run on the line.

25/02/2024

Several parts of the state are facing an elevated fire risk this week. Leave Early when the Fire Danger Rating is Extreme or Catastrophic.

Download the VicEmergency app and check the Fire Danger Rating daily.

More information: https://www.emergency.vic.gov.au/

12/07/2023

We’ve crossed off all major works for the Sunbury Line Upgrade from our to-do list! 🤓

✅ Remove Sunbury’s dangerous and congested Gap Road level crossing

✅ Build the new Gap Road rail bridge, featuring First Nations artwork

✅ Connect the Sunbury Line to the Metro Tunnel – creating a new railway line all the way to Cranbourne/Pakenham via 5 new inner-city stations

✅ Build 5 new electrical substations and upgrade 10 more – to power the new High Capacity Metro Trains (HCMTs) that will run on the line from 2025

✅ Install high-capacity signalling to enable more frequent services on the Sunbury Line

✅ Expand train stabling facilities at Sunbury, Calder Park and Watergardens to house more trains.

🚏 Next stop: Metro Tunnel is testing HCMTs on the Sunbury Line for the first time in July, with buses replacing trains some evenings.

Check before you travel https://go.vic.gov.au/43Jz8sD

We’ve officially finished our work on the Sunbury Line Upgrade - 6 months ahead of schedule!While buses replaced trains ...
11/07/2023

We’ve officially finished our work on the Sunbury Line Upgrade - 6 months ahead of schedule!

While buses replaced trains for 2 weeks during late June and early July, crews worked around the clock to connect the Sunbury Line to the tracks at the Metro Tunnel’s western entrance in Kensington.

Work began on the Sunbury Line Upgrade in 2019. From power and signalling works to platform extensions at 8 stations, new substations, improvements to train stabling and the Gap Road level crossing removal.

These upgrades mean we can now start testing bigger, more modern trains on the line in preparation for the opening of the Metro Tunnel in 2025 - with services running from Sunbury all the way to Cranbourne/Pakenham 🚇🎉

Follow Metro Tunnel to stay up to date with the final stages of the project!

We’re getting ready to link up with the Metro Tunnel ⚒️While Victoria’s Big Build works take place, buses will replace t...
20/06/2023

We’re getting ready to link up with the Metro Tunnel ⚒️

While Victoria’s Big Build works take place, buses will replace trains on sections of the Sunbury, Werribee and Williamstown lines from 8pm 20 June until last service 9 July.

During this time, our crews will work around the clock to install and test high-capacity signalling and power equipment, and lay more than 300m of track to join the Sunbury Line with the Metro Tunnel.

There will be further bus replacement services on the Sunbury Line some nights throughout July while we run test trains to prepare for Metro Tunnel passenger services in 2025.

Check before you travel: https://go.vic.gov.au/43Jz8sD

The Gap Road rail bridge in Sunbury, built as part of the Gap Road level crossing removal project, has been shortlisted ...
14/03/2023

The Gap Road rail bridge in Sunbury, built as part of the Gap Road level crossing removal project, has been shortlisted for the Consult Australia Awards in the Superior Sustainability category 🏆

By improving on the bridge’s original reference design, we reduced emissions equivalent to taking more than 200 cars off the road for a year!

Some of the key features of the final design included:

🌉 Reducing the 4-span design into a 2-span bridge, using fewer materials and less excavation

♻ Where possible, we used recycled glass in place of emissions-intensive materials such as concrete and steel

☀ Increasing safety through clearer sightlines and opening up space to more natural light

🎨 A First Nations artwork, to recognise First Nations culture and heritage.

Read more about sustainable design and the Gap Road rail bridge: https://go.vic.gov.au/3yE0OS1

Trains are back up and running on the Sunbury Line after last weekend’s works 🛠We successfully switched on the Tottenham...
03/03/2023

Trains are back up and running on the Sunbury Line after last weekend’s works 🛠

We successfully switched on the Tottenham substation, the final one to be activated on the line!

The substations will help power bigger, more modern trains to run on the Sunbury Line once the Metro Tunnel opens in 2025 🚆

Thank you for your patience while we delivered these works 🙏

The Footscray West Substation is ready for operation! ⚡We’re upgrading power on the Sunbury Line to improve the capacity...
24/02/2023

The Footscray West Substation is ready for operation! ⚡

We’re upgrading power on the Sunbury Line to improve the capacity, reliability and frequency of services for passengers.

There’s only one more new substation to be activated on the line to complete these important upgrades 👀

We're not only delivering power, signalling and station upgrades to the Sunbury Line, we're also greening surrounding ar...
15/02/2023

We're not only delivering power, signalling and station upgrades to the Sunbury Line, we're also greening surrounding areas 👩🏽‍🌾

Here's a breakdown of plantings for the Sunbury Line Upgrade so far, with more to come 💚

Gap Road:

🍃 539 grass species
🍃 148 ground cover
🍃 178 shrubs
🍃 10 mature trees.

Sunbury Line:

🍃 600 trees planted in Sunbury
🍃 Around 900 seedlings planted near the new Keilor Plains substation.

Buses replace trains on the Sunbury Line between North Melbourne and Sunshine stations from 8.30pm, Wednesday 8 February...
08/02/2023

Buses replace trains on the Sunbury Line between North Melbourne and Sunshine stations from 8.30pm, Wednesday 8 February to last train on Sunday 12 February 🚍

We'll be working around the clock to prepare the Sunbury Line for bigger, more modern trains and more frequent services once the Metro Tunnel opens in 2025 🛠

For more information, or to plan your journey, visit: https://go.vic.gov.au/3kEu7zU

We're preparing the Sunbury Line for bigger more modern trains and more frequent services 🚆 For works to go ahead safely...
02/02/2023

We're preparing the Sunbury Line for bigger more modern trains and more frequent services 🚆

For works to go ahead safely, buses replace trains on the Sunbury Line between North Melbourne and Sunshine stations from 8.30pm, Wednesday 8 February to last train on Sunday 12 February 🚍

Some of our tasks include:

- Installing signalling upgrades and services
- Overhead line wiring and upgrading overhead structure installations
- Commissioning the West Footscray Substation
- Works to support the commissioning of the Tottenham substation.

For more information, or to plan your journey, visit: https://go.vic.gov.au/3kEu7zU

🚧 Gap Road level crossing removal = improved traffic flow + positive impact on the environment! 🌍 We diverted more than ...
24/01/2023

🚧 Gap Road level crossing removal = improved traffic flow + positive impact on the environment! 🌍

We diverted more than 7650 tonnes of waste from landfill by using recycled materials to build the rail bridge and underpass, including:

♻ 4600 tonnes of crushed concrete
♻ 2500 tonnes of recycled crushed rock
♻ 212 tonnes of manufacturing by-products
♻ 150m of 100% recycled plastic pipe
♻ 660 tonnes of reclaimed asphalt pavement.

All these materials were sourced responsibly from within Victoria, supporting local jobs ✅

We all know good things take time 🕑Since we started work on the Gap Road level crossing removal, our team has clocked up...
12/01/2023

We all know good things take time 🕑

Since we started work on the Gap Road level crossing removal, our team has clocked up more than 300,000 work hours! 🤯

We’ve finished off our landscaping, and are continuing minor reinstatement works.

A big thank you to all involved and to the Sunbury community for your patience 👏

Address

Level 17, 222 Exhibition Street
Melbourne, VIC
3000

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Sunbury Line Upgrade posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share