27/08/2026
🚧 Current and upcoming roadworks.
Keep up to date on road projects to help plan your travel, with this handy guide. These are a mix of Council, Victorian Government, Powercor, and developer projects. For the most up to date information including detours, location maps and project details: melton.vic.gov.au/roadworks
🚧 Road closures:
🔴Banks Drive, Diggers Rest: Temporarily closed between Vineyard Road and Ellis Drive extended until Friday 18 September for developer works as part of construction of a new supermarket.
🔴Kirkpatrick Boulevard, Truganina: Temporarily closed between Hopkins Road and McKinley Drive for developer works further extended until Tuesday 15 September due to weather impacts. Detour via Clara Avenue and Grand Boulevard or alternate detour route via Mt Atkinson Road.
🔴 Banchory Avenue, Hillside: Temporarily closed at Melton Highway until Friday 11 September for developer works to install traffic lights at the intersection.
🔴 Boundary Road, Truganina: Temporarily closed between Hopkins Road and Tarneit Road from 24 August until 14 September 2026 for developer works. Detour via Hopkins Road, Dohertys Road and Tarneit Road.
🔴 Doriemus Drive, Truganina: Temporarily closed from 7am until 5pm each day, between Pauljoseph Way and Perpetual Way/Saintly Drive Saturday 29 August and Sunday 30 August, for developer works. Detour will be via Peterpaul Way and Carmen Street.
🚆 Exford Road, Melton: Exford Road will be closed at the level crossing until 7am Monday 31 August to finish building the new elevated station and rail bridge, with buses replacing trains for this time. Detours will be in place via Richard Road to the north and Wilson Road to the south. Visit: https://bigbuild.vic.gov.au/library/level-crossing-removal-project/geelong-ballarat/melton/works/exford-road-closure-and-247-works-in-august
🚆Ferris Road, Cobblebank between Abey Road and Coach Street: Nightly southbound closure from 1 September 2026 to 4 September 2026, between 8pm and 5am for level crossing works. Detour via Abey Road, Exford Road and Bridge Road.
🚆 Coburns Road, Melton South: Closed between Staughton Street and James Melrose Drive from 1am, Sunday 6 September to 7am, Thursday 24 September. Northern detour via Coburns, Richard and Station roads and southern detour via Exford, Wilson and Rees roads Visit: https://bigbuild.vic.gov.au/library/level-crossing-removal-project/geelong-ballarat/melton/works/coburns-road-road-closure-in-august
🚧 Lane closures:
Please allow for extra travel time or use alternative routes:
🟠 Hopkins Road, Deanside: Lane closure between Brimba Road to Neale Road with traffic flowing via shuttle flow until Friday 4 September delayed due to recent weather, for developers to undertake drainage works.
🟠 Boundary Road, Truganina: one lane temporarily closed between Hurst Drive and Woods Road for developer works until Tuesday 18 September. Traffic will travel through Boundary Road via shuttle flow under the control of traffic signals.
Have your say:
🟣 Road consultation:
Bridge Road, Strathtulloh: We are seeking your feedback on the proposed traffic management arrangements for the temporary two-week closure of Bridge Road to install a new raised signalised pedestrian crossing on Bridge Road and raised crossing on Wembley Avenue during the September school holidays.
https://conversations.melton.vic.gov.au/bridge-road-pedestrian-operated-signalised-crossing
🛣️ We understand these disruptions are frustrating. As a growing city, our roads can't improve without this sort of work.
Regardless of the source of the disruptions, we'll continue to let you know what we know is coming up, so you can plan accordingly. As always, please note that these dates are subject to weather conditions and construction progress, and may change due to unforeseen delays.