Lakes District Maintenance - Service Area #24

Lakes District Maintenance - Service Area #24 LDM Inc. maintains Service Area 24 covering Burns Lake, Houston, Grassy Plains, and Granisle, BC

09/29/2026

September 29 2026

Highway 16 W: Both Directions
Construction work. Starting Mon Sep 28 until Tue Dec 1. From 7:01 AM to 5:00 PM, Monday to Saturday. Expect 10 minutes delay. Expect delays. Lane closures in both directions. Single lane alternating traffic. Watch for traffic control. Speed Limit restriction: 50km. Use caution when passing crew and equipment on highway.

Send a message to learn more

09/29/2026

September 29, 2026

Highway 16 - 6 Mile Brake Check to Burns Lake
FOG PATCHES - Highway 16, between 6 Mile Hill Brakecheck (9 miles east of Topley) and Center Street (Burns Lake)

Highway 16 - Burns Lake to Priestly Hill
FOG PATCHES - Highway 16, between Center Street (Burns Lake) and SA24/23 Maintenance Boundary (Priestly Hill)

Highway 35 - Francois Lake to Burns Lake
FOG PATCHES - Highway 35, between Francois Lake Ferry (Northbank) and the end of Highway 35 (Burns Lake)

Send a message to learn more

09/28/2026

September 28, 2026

Highway 16, Highway 16 W: Both Directions
Construction work. Starting Mon Sep 28 until Tue Dec 1. From 7:01 AM to 5:00 PM, Monday to Saturday. Expect 10 minutes delay. Expect delays. Lane closures in both directions. Single lane alternating traffic. Watch for traffic control. Speed Limit restriction: 50km. Use caution when passing crew and equipment on highway.

Send a message to learn more

09/24/2026

September 24, 2026

Highway 16: 10 to 7 km west of Houston
Shoulder maintenance between Barrett Hat Rd and Barrett Station Rd for 3.7 km. 8:30 AM to 2:30 PM. Single lane alternating traffic. Watch for traffic personnel.

09/24/2026

Septmeber 24, 2026

Highway 16 - 6 Mile Brake Check to Burns Lake
Fog patches between 6 Mile Hill Brakecheck (9 miles east of Topley) and Center Street (Burns Lake).
Please drive with your lights on.

Highway 16 - Burns Lake to Priestly Hill
Fog patches between Center Street (Burns Lake) and SA24/23 Maintenance Boundary (Priestly Hill)
Please drive with your lights on.

Highway 35 - Francois Lake to Burns Lake
Fog patches between Francois Lake Ferry (Northbank) and the end of Highway 35 (Burns Lake)
Please drive with your lights on.

Send a message to learn more

🍂⚠️ Possible Freezing OvernightTemperatures across the Lakes District are expected to drop below freezing overnight and ...
09/23/2026

🍂⚠️ Possible Freezing Overnight

Temperatures across the Lakes District are expected to drop below freezing overnight and into Wednesday morning.

Drivers should watch for localized frost or icy sections, particularly on bridges, shaded areas and low-lying sections.

Please slow down, allow extra following distance and drive to conditions.

Our crews will be monitoring conditions throughout the area.

09/22/2026

September 22, 2026

Hwy 35: Pioneer Way to Gerow Island
Bridge maintenance on Burns Lake Trestle. From 8:00 AM to 3:30 PM. Single lane alternating traffic. Watch for traffic control.

Winter is coming... are you ready for winter tires? ❄️🚗October 1 is getting close, and with northern B.C. weather, winte...
09/21/2026

Winter is coming... are you ready for winter tires? ❄️🚗

October 1 is getting close, and with northern B.C. weather, winter conditions can arrive long before the calendar decides to admit what's happening.

Before the snow starts flying:

Check that your winter tires are installed and in good condition.
Legal winter tires must have at least 3.5 mm of tread and display M+S or the three-peaked mountain/snowflake symbol.
Winter tire requirements are in effect on most B.C. highways from October 1 to April 30, with some lower-elevation routes ending March 31.
Check DriveBC.ca before travelling for current road conditions, events and highway information.

Slow down. Leave extra space. Be winter ready.

09/17/2026

September 17, 2026

Highway 35:
Bridge maintenance between Gerow Island Rd and Pioneer Way for 0.7 km. From 8:00 AM to 3:30 PM Single lane alternating traffic. Traffic signal out. Watch fro traffic lights. Expect minor delays.

Send a message to learn more

09/15/2026

September 15, 2026

Highway 35:
Bridge maintenance between Gerow Island Rd and Pioneer Way for 0.7 km. Until Thu Sep 17 at 3:30 PM PDT. From 8:00 AM to 3:30 PM on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Watch for Traffic lights. Expect minor delays.

Send a message to learn more

Address

881/Highway 16W
Burns Lake, BC
V0J1E0

Alerts

Be the first to know and let us send you an email when Lakes District Maintenance - Service Area #24 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share