Lakes District Maintenance - Service Area #24

Lakes District Maintenance - Service Area #24 LDM Inc. maintains Service Area 24 covering Burns Lake, Houston, Grassy Plains, and Granisle, BC

06/01/2026

June 1, 2026

Highway 16: Houston
Bridge maintenance between Butler Ave and Williams Cres for 1.3 km. Until Wed Jun 3. From 8:00 AM to 3:00 PM. Watch for traffic control. Single lane alternating traffic. Bridge washing, watch for flaggers.

Highway 16: Both Directions
Road maintenance work between Meanwhile Rd and 6 Mile Hill Brakecheck for 3.6 km. Watch for traffic control. 24 hrs a day.
(9 to 6 km east of Topley)

Send a message to learn more

HIGHWAY 16 WATSON CREEK PROJECT UPDATEHighway 16 at Watson Creek is now open to two-way traffic.Crews have completed the...
05/31/2026

HIGHWAY 16 WATSON CREEK PROJECT UPDATE

Highway 16 at Watson Creek is now open to two-way traffic.

Crews have completed the emergency culvert replacement and the temporary traffic control measures have been removed. A reduced speed zone will remain in place while crews work on the next phase of the project.

Motorists are reminded to obey posted speed limits, watch for workers and equipment, and use caution when travelling through the area.

Thank you to the travelling public for your patience and cooperation as work continues at the site.

05/28/2026

May 28, 2026

Highway 16: Both Directions, Houston
Bridge maintenance between Gushwa Rd and Morice River Rd for 2.2 km. From 8:00 AM to 3:00 PM. Single lane alternating traffic. Watch for traffic control.

Side Roads: Burns Lake
Sweeping side roads - Beatty Road, West Decker and Defoe Road. Watch for slow moving equipment Watch for pilot vehicle.

Highway 16: Both Directions
Culvert replacement between Meanwhile Rd and 6 Mile Hill Brakecheck for 3.6 km. Single lane alternating traffic. Detour in effect. Watch for traffic control. 24 hours per day.
(9 to 6 km east of Topley)

05/27/2026

May 27, 2026

Highway 16: Both Directions : Houston
Bridge maintenance between Gushwa Rd and Morice River Rd for 2.2 km. From 8:00 AM to 3:00 PM on Wednesday and Thursday. Single lane alternating traffic. Watch for traffic control.

Highway 16: Both Directions
Road maintenance work between Meanwhile Rd and 6 Mile Hill Brakecheck for 3.6 km. Road maintenance work. Single lane alternating traffic 24 hours. Detour in effect. Watch for traffic control. (9 to 6 km east of Topley)

Send a message to learn more

Emergency culvert repair work continues on Hwy 16 approximately 4 km west of the Six Mile Hill Brake Check.Crews have ma...
05/26/2026

Emergency culvert repair work continues on Hwy 16 approximately 4 km west of the Six Mile Hill Brake Check.

Crews have made strong progress on the temporary bypass and culvert installation, with single lane alternating traffic still in effect through the area.

Please expect delays, slow down, and watch for traffic control personnel and heavy equipment on site. Thank you for your patience while this emergency repair is completed safely.

05/26/2026

May 26, 2026

Highway 16: Both Directions ; Houston
Bridge maintenance between Tweedie Ave and Benson Ave for 0.4 km. From 10:00 AM to 3:00 PM. Single lane alternating traffic will be in effect. Watch for traffic control personnel.

Highway 16:Both Directions
Culvert maintenance work between Meanwhile Rd and 6 Mile Hill Brakecheck for 3.6 km. Single lane alternating traffic. Detour in effect. Watch for traffic control. 24 hours per day
(9 to 6 km east of Topley)

05/21/2026

May 21, 2026

Highway 16: Eastbound
Road sweeping between Perow Loop Rd and Hamlet Frtg for 9.7 km. From 8:30 AM to 2:00 PM. Expect minor delays. Watch for slow moving equipment. (Topley)

Send a message to learn more

05/21/2026

May 21, 2026

Highway 16: Eastbound
Road sweeping between Hossack Rd and Babine Lake Rd for 26.4 km. From 8:00 AM to 4:30 PM. Expect minor delays. Watch for slow moving vehicle. (Burns Lake to 12 km west of Palling)

Send a message to learn more

05/20/2026

May 20, 2026

Highway 16: Eastbound
Road sweeping between Morgan Rd and Perow Station Rd for 14.6 km. From 8:30 AM to 2:00 PM. Watch for signs and slow moving equipment. (9 km west of Topley to 3 km east of Houston)

Highway 16: Westbound
Road sweeping between 6 Mile Hill Brakecheck and Palling Rd E for 27.9 km. From 8:30 AM to 3:00 PM. Watch for slow moving equipment. (1 km east of Palling to 9 km east of Topley)

COMMUNITY FUNDRAISING OPPORTUNITYLooking to raise money for your group, team, club, or organization?Lakes District Maint...
05/20/2026

COMMUNITY FUNDRAISING OPPORTUNITY

Looking to raise money for your group, team, club, or organization?

Lakes District Maintenance is seeking individuals and community groups in the Burns Lake and Houston areas to assist with roadside litter pickup and community beautification efforts throughout SA24.

A great opportunity to:
• Raise funds
• Support your community
• Help keep SA24 clean

If interested, please contact Gail for details.

778-766-4959
[email protected]

Address

881/Highway 16W
Burns Lake, BC
V0J1E0

Alerts

Be the first to know and let us send you an email when Lakes District Maintenance - Service Area #24 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share