07/13/2026
Taché Community Centre Update
Claude Simard Metal Systems have installed portions of the exterior cladding, and trims. Normandeau roofing have completed around 90% of their roofing scope. Cast In Place Concrete have poured the Library and Activity Center slabs. Cast In Place are currently working with Prairie HVAC to prep and form the Arena apron slab and start prepping the arena rink slab. Avalon Drywall have installed steel studs on the 2nd floor and have installed drywall on one side of some of the walls on the 2nd floor. Avalon has started erecting the interior steel studs in the library and have installed insulation and vapour barrier around the activity center and Library. Simmons Masonry have been continuously laying blocks under the hollow core bleachers and working in the changerooms. Penn-Lite have been installing ductwork in the changerooms and corridors. Penn-Lite Plumbing have been working on rough-ins for the changerooms, rainwater leaders, vent stacks, and have 90% of in-slab plumbing completed. Ambrosie have been working on exterior lighting, library rough-ins and 2nd floor rough ins. ABC Fire and Safety have been installing sprinkler lines in the corridor hallways and in the activity center.