Natural Resources Informatics Hub

Natural Resources Informatics Hub Senior Tech Specialist in Natural Resources Informatics | GIS & "One Map" Expert | Digital Government Strategist | Content Creator & Media Professional.

Providing professional insights into Digital Government and GIS technology across Australia and China. Responsible for the construction and management of provincial-level natural resource information systems, database systems, office automation network systems for government agencies, and dynamic monitoring information systems for land and mineral resources. Responsible for collecting, summarizing

, analyzing, and researching data on basic information, resource utilization, and dynamic changes in land and mineral resources across the province, as well as providing related policy recommendations. Authorized by the provincial department to release natural resource information to the public. Undertakes the review, technical guidance, acceptance, and computer application technology training for the information systems and network construction plans of municipal (prefectural) and county-level natural resource management departments. Also undertakes the production of electronic reports and provides related technical support.

07/08/2026

Provincial Information Center Holds Information Technology Development Exchange Meeting with Deyang Bureau

On August 6, the Provincial Information Center held an exchange meeting on information technology (IT) development with the Deyang Municipal Bureau of Planning and Natural Resources. The discussion focused on key areas including the construction and application of the "One Map" system, business data backflow, and cybersecurity safeguards, aiming to share major practices and jointly explore measures for improvement.

During the meeting, the Provincial Information Center outlined the overall design of the Ministry’s "One Map" framework and the provincial department's participation in building Sichuan’s digital government. The Center provided a detailed overview of the province's "One Map" achievements and operational experiences, highlighting the connection and migration to the e-government extranet, database sub-clusters, unified platforms, and application scenarios.

With a shared focus on closed-loop business data management, both sides engaged in in-depth discussions on optimizing provincial-municipal data backflow mechanisms, data aggregation and sharing, standardized updates, and the practical implementation of outcomes.

Addressing key cybersecurity tasks in the natural resources sector, the Provincial Information Center drew on the operational realities of the province’s natural resources IT maintenance. They shared measures concerning the establishment of cybersecurity regulations, core data security protection, and daily platform maintenance. Both parties jointly explored ways to improve mechanisms for secure data exchange, declassification, and desensitization, striving to build a robust safety line for provincial natural resources IT development.

This exchange meeting further streamlined communication channels between provincial and municipal levels, effectively building synergy and addressing operational bottlenecks. Moving forward, the Provincial Information Center will maintain regular communication and collaboration with municipal (and prefectural) natural resources authorities, summarize and promote best practices in construction and management, and leverage IT to drive quality and efficiency in natural resources management.

One map system
07/08/2026

One map system

31/07/2026

MNRC and Provincial Information Centers Hold Joint Video Conference on Technical Integration for E-Government Extranet Access

To advance the digital transformation of natural resources management and spatial governance, and to fulfill the unified deployment by the Ministry of Natural Resources and the Provincial Government regarding E-Government Extranet integration, the Provincial Information Center of Natural Resources is systematically migrating non-classified business systems from the industry-dedicated network to the E-Government Extranet. On July 30, the Information Center of the Ministry of Natural Resources (MNRC) and the Provincial Information Center jointly held a video conference focused on technical exchanges for E-Government Extranet access and system migration.

Leading experts and officials from the Office of the National E-Government Extranet Management Center and the MNRC Information Center were invited to provide guidance. During the meeting, the Provincial Information Center delivered a comprehensive report on the overall work plan, current progress, as well as the key bottlenecks and challenges encountered during the implementation process.

Aligning with national E-Government Extranet construction standards, attending parties conducted in-depth technical discussions and formulated targeted solutions across four core areas:

Overall Network Architecture Design: Optimizing extranet access topology and network hosting capabilities.
Security Protection Framework: Strengthening network and data security defenses within a cross-network integrated environment.
System Migration and Deployment Models: Clarifying clear, stable migration pathways and centralized deployment modes for non-classified business systems.
Secure Data Exchange Mechanisms: Standardizing cross-network data aggregation workflows and boundary security exchange protocols.

This conference provided actionable technical guidance for upcoming network construction, system migration, and cross-network data exchange. Moving forward, the Provincial Information Center will ensure the ex*****on of these key outcomes, steadily driving business system migration to empower natural resources management with enhanced efficiency through digital upgrades.

At 10:54 AM on July 22, "Chuanzi-1"—Sichuan Province's dedicated provincial natural resources satellite—was successfully...
22/07/2026

At 10:54 AM on July 22, "Chuanzi-1"—Sichuan Province's dedicated provincial natural resources satellite—was successfully launched into its predetermined orbit aboard a Gravity-1 rocket from the sea near Shanghai.

The satellite was jointly named through a collaboration between the Sichuan Institute of Land Science and Technology (Sichuan Satellite Application Technology Center) and Huan Tian Wisdom Technology Co., Ltd. It is a high-resolution optical remote sensing satellite deployed in a sun-synchronous orbit at an altitude of 535 kilometers. Featuring a ground spatial resolution of 0.5 meters, stereo imaging capabilities, high pointing accuracy, superior stability, and agile maneuverability, the satellite will be widely used in spatial planning, geological disaster prevention, arable land protection, and natural resource law enforcement, providing robust remote sensing data support for natural resource management.

Following its successful launch, "Chuanzi-1" will join the Huan Tian Wisdom constellation in networked operations. This expands the channels for acquiring remote sensing imagery and creates a collaborative "optical + radar" observation system. The system enables all-weather, round-the-clock, high-precision monitoring, delivering a stable and high-quality remote sensing imagery foundation for the construction of Sichuan's digital government.

Moving forward, the Sichuan Satellite Center will continue to strengthen technological innovation and satellite application capabilities, refine province-wide imagery coordination and data-sharing mechanisms, and actively build an integrated "air-space-ground" monitoring network to support the refined and intelligent governance of Sichuan's natural resources.

06/07/2026

A Comprehensive Guide to the "Pre-examination report on Land Use and Opinion on Site Selection for Construction Projects"
Introduction

The Pre-examination report on Land Use and Opinion on Site Selection for Construction Projects (hereinafter referred to as the "Certificate") is positioned at a relatively early stage of the entire project development lifecycle. It primarily targets projects utilizing allocated land (non-commercial/public land) and is a unique requirement for public infrastructure and public service projects. Although it may seem like a niche area, it remains a critical and unavoidable core legal document.

Based on practical experience over the past two years managing sewage treatment plants, primary/secondary schools, and municipal road projects, this guide provides a structured review for shared learning and reference.

I. Definitions

1. Pre-examination of Land Use (Focus: Land Control)

An administrative licensing matter whereby the competent department of natural resources reviews a construction project during its pre-approval/pre-filing stage. Based on territorial spatial planning, annual land utilization plans, industrial policies, and intensive land-use standards, the department conducts a preliminary review of the project's land-use scale, location, land classification, and the rationality of land occupation.

In short: It verifies whether the project is eligible for land, how much land it can use, and whether the land use complies with regulations. It ensures compliance right from the source to prevent illegal land occupation and blind project establishment.

2. Opinion on Site Selection (Focus: Spatial Control)

A statutory planning document issued by the competent department of natural resources in accordance with the master territorial spatial planning and regulatory detailed planning. It specifies the exact construction location, land boundary redlines, planning conditions, and surrounding spatial control requirements for the construction project.

Core Function: It finalizes where the project will be built, the exact boundary lines, and the mandatory planning constraints, serving as the statutory basis for project planning implementation.

3. Policy Background: "Two-in-One" Integration

Previously, the Pre-examination of Land Use and the Opinion on Site Selection were two independent certificates requiring separate approval processes, which led to redundant paperwork, long approval cycles, and multiple bureaucratic hurdles for enterprises.

To optimize the business environment, streamline approval procedures, and reduce processing times, the state introduced a combined approval mechanism. The two administrative licenses are now integrated into one unified certificate, requiring a single application, a joint review, and simultaneous issuance. The integrated document is officially named the Pre-examination report on Land Use and Opinion on Site Selection for Construction Projects.

Currently, except for special classified projects or independently selected sites, most newly built engineering projects follow this "Two-in-One" process, making it one of the most critical statutory certificates in the early stages of project development.

II. Functions and Benefits (Five Core Roles)

Compliance and Market Access: It determines the legal feasibility of a project from the perspectives of territorial spatial planning, land use zonation, and industrial access. Without this Certificate, subsequent procedures such as project approval, land acquisition, planning, and construction permits cannot be processed.

Site Selection and Boundary Definition: It explicitly defines core planning conditions such as the project's specific location, land redline boundaries, plot ratio (FAR), building height limits, setback distances, and ancillary facility requirements. This serves as the statutory basis for subsequent master plan layout, scheme designs, and construction drawing designs.

Land Administration and Control: It strictly reviews the scale of land use and checks for any encroachment on cultivated land, permanent basic farmland, or ecological protection redlines. It enforces intensive and economical land-use requirements and protects the baseline of territorial spatial control.

Prerequisite for Subsequent Approvals: It acts as a mandatory prerequisite for project filing/approval/核准, construction land planning permits, land expropriation, land allocation/granting, and engineering planning permits, running through the entire early-stage chain of the project.

Ownership and Risk Management: It clarifies the planning attributes of the project land, mitigating future engineering risks such as site selection conflicts, land violations, planning adjustments, and land expropriation disputes.

III. Project Lifecycle Stage

Within the full life cycle of an engineering construction project, this Certificate belongs to the pre-approval stage and represents the very first step in planning implementation.

Standard Approval Sequence:

Project Investment Intent Assessment → 【Application for Pre-examination of Land Use & Site Selection Opinion】 → Project Establishment (Filing / Approval / Verification) → Construction Land Planning Permit → Land Expropriation / Allocation / Grant → Construction Engineering Planning Permit → Construction Drawing Review → Construction Permit → Commencement of Construction → Project Completion Acceptance.

Note: This is the very first statutory certificate to be processed before the project is officially established and before formal design work begins. It is the premier gateway for project realization.

IV. Who Handles It and How?

Applicant (Proponent): The construction entity (project owner, development enterprise, government platform company, project management agency, or other project investors). They may entrust a third-party consulting agency to handle the application.
(Note: It is highly difficult for owners to handle this independently because gathering complete territorial spatial planning data is technically challenging. Usually, third-party planning and surveying agencies are retained. Fees typically range from 20,000 to 50,000 RMB, as they possess the necessary base maps, planning data, and professional expertise to expedite the process.)

Approving Authority: The competent departments of natural resources and planning at various levels (provincial, municipal, or district/county levels, depending on the project's investment scale, land area, and whether it encroaches on ecological redlines or basic farmland).

Processing Principles: Territorial (local) acceptance, tiered approval, and parallel online/offline submission.

(Note: This process is mandatory for projects utilizing allocated land, public welfare infrastructure, municipal roads, public supporting facilities, schools, hospitals, and newly built industrial parks. For commercial land acquired through bidding, auction, or listing, the procedures may be simplified based on local policies, but the pre-examination and site selection review process must still be fulfilled.)

V. Standard Processing Workflow

Pre-planning Stage: The construction unit initially determines the intended site, checks it against the territorial spatial planning and land-use attributes, evaluates surrounding planning facilities, and conducts a preliminary feasibility assessment.

Dossier Preparation Stage: Compile a complete set of documents according to the checklist, including the project application, site selection scheme, topographic maps, ownership data, and industrial certificates.

Online & Offline Submission: Input project information into the Engineering Construction Project Approval and Management System (or the Natural Resources Government Services Platform), upload electronic documents, and submit physical hard copies to the windows of the Government Service Hall.

Internal Departmental Review: The Department of Natural Resources simultaneously reviews land-use pre-examination and planning site selection. They cross-check planning redlines, land-use scale, cultivated land balance, ecological redlines, and industrial policies. If sectors like culture & tourism, forestry, water conservancy, or environmental protection are involved, opinions from those departments are sought concurrently.

Field Inspection & Verification: Planning officials conduct on-site field inspections to verify the current status of the selected site, surrounding controls, current land utilization, and any potential land acquisition or demolition issues.

Public Notice & Compliance Verification: Publish the site selection notice for public review according to regulations. If no objections are raised, proceed with internal joint review and sign-off procedures.

Certificate Issuance: Upon approval, the Pre-examination report on Land Use and Opinion on Site Selection for Construction Projects is officially issued (including both physical and electronic certificates, along with the attached planning redline maps). The construction unit receives and archives the document.

VI. Required Document Checklist

Application Form for the Pre-examination report on Land Use and Opinion on Site Selection for Construction Projects (Official standard form, stamped with the applicant’s official seal).

Project Application Report / Project Initiation Request (Explaining the project background, construction details, scale, investment volume, and reasons for site selection).

Corporate Legal Documents: Business license, legal representative’s ID, power of attorney, and the agent's ID card (required if a third party is entrusted).

Preliminary Site Selection Scheme & Site Redline Map (Plotted on a 1:500 / 1:1000 / 1:2000 topographic map, indicating the land scope and four boundaries/bounds).

Compliance Statement regarding Territorial Spatial Planning and a Detailed Statement of Land-Use Scale Calculations.

Industrial Market Access Documents / Opinions from Industry Competent Authorities (Required for industrial projects, municipal public welfare projects, or specialized projects like education and healthcare).

Preliminary Sectoral Opinions: If the project involves the occupation of cultivated land, forestry land, ecological protection redlines, river courses, or cultural relic protection zones, preliminary review opinions from the respective competent authorities must be provided.

On-site Status Photos and documents proving land ownership or rights.

Supplementary Materials required by local laws, regulations, and local natural resources departments.

Conclusion

The Pre-examination report on Land Use and Opinion on Site Selection serves as the very first statutory "green card" for an engineering project. Following the "Two-in-One" reform, the process has been streamlined significantly, yet the technical and regulatory rigor remains high. For industry professionals, mastering its definition, function, project stage, handling entities, workflow, and documentation checklist is a surefire way to boost project development efficiency and significantly shorten the pre-construction cycle.

Send a message to learn more

03/07/2026
Natural Resources System Across the Province Organizes Viewing of the Celebration of the 105th Anniversary of the Foundi...
03/07/2026

Natural Resources System Across the Province Organizes Viewing of the Celebration of the 105th Anniversary of the Founding of the CPC

At 10:00 a.m. on the morning of July 1, a grand ceremony celebrating the 105th anniversary of the founding of the Communist Party of China (CPC) was held at the Great Hall of the People. General Secretary of the CPC Central Committee, President of the State, and Chairman of the Central Military Commission Xi presented the "July 1 Medal" to the recipients and delivered an important speech.

With excitement and reverence, the vast number of Party members and cadres in the provincial natural resources system watched the live broadcast of the celebration, listened carefully to General Secretary Xi‘s important speech, and witnessed this solemn moment together.

All attendees agreed that General Secretary XI’s important speech comprehensively reviewed and summarized the glorious journey and great achievements of the CPC in uniting and leading the people of all ethnic groups across the country over the past 105 years. It profoundly revealed the excellent qualities and key codes that have enabled the CPC to continuously create brilliance, and set out clear requirements for all Chinese Communists to strengthen their confidence and continue their struggle on the new journey. The speech holds significant political, theoretical, and practical importance, further pointing out the direction and providing guidelines for achieving the Party’s central tasks in the new era and on the new journey. We must earnestly study and comprehend the spirit of General Secretary Xi’s important speech and effectively transform the results of our study into concrete actions for forging ahead on the new journey and making contributions to the new era.

The consensus expressed by all was that for 105 years, the torch has been passed down, and the responsibility rests on our shoulders. The provincial natural resources system must rally more closely around the Party Central Committee with Comrade Xi at its core, adhere to the guidance of Xi Thought on Socialism with Chinese Characteristics for a New Era, conscientiously study and implement Xi‘s thinking on Party building, profoundly grasp the decisive significance of the "Two Affirmations," resolutely achieve the "Two Maintenances," carry forward the great founding spirit of the Party, fulfill our original aspirations and missions, and establish and practice a correct view of political achievements. We will perform our duties with dedication and commitment in areas such as farmland protection, factor support, strategic mineral exploration, territorial space planning, geological disaster prevention and control, ecological restoration, and real estate registration, contributing more natural resources strength to write a new chapter of Chinese-style modernization in Sichuan.

Image caption: Watching the celebration ceremony collectively.

National Land DayChinaJune 25, 2026
25/06/2026

National Land Day
China
June 25, 2026

National Land Day of China
22/06/2026

National Land Day of China

Address

Chengdu

Alerts

Be the first to know and let us send you an email when Natural Resources Informatics Hub posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Natural Resources Informatics Hub:

Shortcuts

Share