WHAT MAIN CONTRACTORS SHOULD CHECK BEFORE DESIGN FREEZE/CONSTRUCTION APPROVAL
Before design approval, a main contractor needs confidence that fire protection can be built, tested and maintained.
The project team should confirm the design basis, potential engineering solutions, and intended coverage, then test the proposal against the building. Routes, supports, access, ceiling zones and sequencing need coordination with other trades. Water, power, controls, drainage and plant allowances should also be visible rather than left as later assumptions.
Maintainability belongs in the same review. If equipment, controls or test points cannot be accessed safely after handover, the design may create avoidable operational problems. IFSS can contribute practical installation and maintenance knowledge to the specialist workstream, while the competent design team retains responsibility for the wider strategy and approval route.
The checklist worth sharing is: design basis, buildability, resources and maintainability. A gap in any one of these areas deserves an owner and an action before the design is fixed.
We will save you money if you get us involved early enough in your project, get in touch to find out how we can engineer out future issues!
0844 357 5839
[email protected]
https://zurl.co/rhJAt