Stoke-on-Trent Highways

Stoke-on-Trent Highways To raise highways issues please visit www.stoke.gov.uk/highways

Stoke-on-Trent City Council highways department

Providing updates on maintenance works and minor scheme improvements

β€’ Please note replies to posts and messages are not monitored.

02/09/2026

🚧 Highway Maintenance Update – Surface Dressing Programme 🚧

Due to the poor weather conditions this week, our contractor has been delayed on projects outside of the city and is unable to undertake some planned surface dressing works this week. As a result, the first phase of the programme has been revised and the following dates have been updated:

Road---Surface Dressing (Original Date)---Surface Dressing (New Date)
Birches Head Road---3 September---4 September
Weldon Avenue---3 September---4 September
Main Street--- 3 September---4 September
Moorland Road--- 2 September---6 September
Lysander Road--- 2 September---6 September
Grange Road---2 September---6 September
Shaldon Avenue--- 4 September---7 September
Blencarn Grove---4 September---7 September
Nursery Avenue---4 September---7 September
Brentwood Grove---4 September---7 September
Leighton Grove---4 September---7 September
Dorlan Grove---4 September---7 September
Percival Drive---4 September---7 September
Nursery Lane---4 September---7 September
Handley Drive---4 September---7 September
Lally Place---4 September---7 September
Finch Place 4 September 7 September
Hugh Bourne Place 4 September 7 September
Patrick Place 4 September 7 September

An additional update will be shared on Friday 4th September.

Surface dressing is a weather-dependent treatment and can only be undertaken when conditions are suitable. These changes are necessary to ensure the treatment is applied safely and achieves the best possible long-term performance.

Please allow extra time for your journey and consider alternative routes where possible.

While our crews will do their best to provide access to and from properties whenever it is safe to do so, there may be times when residents and visitors are asked to wait briefly while the treatment is being applied. We appreciate your patience and co-operation whilst these works are carried out.

For the latest updates, please check on-site signage or follow Stoke-on-Trent Highways on Facebook. 🚧

🚧 Highway Maintenance Update – Surface Dressing Programme πŸš§β— Moorland Road / Lysander Road / Grange Road β—β›ˆ  Due to the ...
28/08/2026

🚧 Highway Maintenance Update – Surface Dressing Programme 🚧

❗ Moorland Road / Lysander Road / Grange Road ❗

β›ˆ Due to the poor weather conditions experienced this week, our contractor has been unable to safely undertake some planned surface dressing works.
As a result, the programme has been revised and the following dates have been updated:

πŸ“… Original Dates - 2nd, 11th & 14th September.
πŸ“… New Dates - 6th, 11th & 15th September.

🌑Surface dressing is a weather-dependent treatment and can only be undertaken when conditions are suitable. These changes are necessary to ensure the treatment is applied safely and achieves the best possible long-term performance.
Please allow extra time for your journey and consider alternative routes where possible.

πŸ‘·β€β™‚οΈ While our crews will do their best to provide access to and from properties whenever it is safe to do so, there may be times when residents and visitors are asked to wait briefly while the treatment is being applied. We appreciate your patience and co-operation whilst these works are carried out.

For the latest updates, please check on-site signage or follow Stoke-on-Trent Highways on Facebook.

🚧 Upcoming Highway Works – Week Starting 31st August 2026 🚧Please take note of the scheduled works across the city and p...
27/08/2026

🚧 Upcoming Highway Works – Week Starting 31st August 2026 🚧

Please take note of the scheduled works across the city and plan your journeys accordingly:

πŸ”§ Pothole Pro Works

The Pothole Pro will be carrying out small patch repairs to the carriageway.

These include:

β€’ 01/09-02/09- Unwin Street (dig down)- The footway runs along the side of 103 Unwin Street to join the other footway from end of Graying Grove and Sherrat Street & Merrion Drive- Burslem Park Ward.
β€’ 04/09- Victoria Road- Halfords entrance- Hanley Park, Joiners Square and Shelton ward.
β€’ 05/09- Radford Road- Basford and Hartshill Ward.

🚦 Traffic Signal Works

Times Square Traffic Signal Upgrade - work commences Monday 22nd June until Spring 2027

🚌 Non-Highway Projects

Schemes include:

β€’ Longton Public Realm- works continue for several weeks
β€’ South Wolfe Street- works continue for several weeks
β€’ Burslem Public Realm (Queen Street)- works continue for several months.

⚠️ Road Safety Improvements

β€’ Ashwood- Road Safety Scheme- Works continue 10/08
β€’ Watergate Street- Road Safety Scheme- Works commence 10/08

Traffic management will be in place whilst the road safety improvement schemes are carried out.

🚢 Footway Resurfacing

Works to improve footways in the city continue this week. Schemes include:

β€’ Bream Way footway reconstruction- works commence 17/08.
β€’ Dace Grove footway reconstruction- works commence 01/09.

πŸ›£οΈ Carriageway Resurfacing

Works to improve carriageways in the city continue this week. Schemes include:

β€’ Marsh Street/York Street

πŸ›£οΈ Carriageway Surface Treatment
Spray and chip:

β€’ Moorland Road
β€’ Lysander Road
β€’ Grange Road
β€’ Birches Head Road

πŸ› Playground Projects

Work commencing Monday 31/08/2026.

β€’ Barret Drive playground, continued painting.
β€’ Breakspere Street cleansing and repaint.

We appreciate your patience and cooperation as we continue to improve local roads and infrastructure. πŸ‘·β€β™‚οΈπŸš—

🚧 Upcoming Highway Works – Week Starting 24th August 2026 🚧Please take note of the scheduled works across the city and p...
21/08/2026

🚧 Upcoming Highway Works – Week Starting 24th August 2026 🚧

Please take note of the scheduled works across the city and plan your journeys accordingly:

🚦 Traffic Signal Works

Times Square Traffic Signal Upgrade - work commences Monday 22nd June until Spring 2027

🚌 Non-Highway Projects

Schemes include:

β€’ Longton Public Realm- works continue for several weeks
β€’ South Wolfe Street- works continue for several weeks
β€’ Burslem Public Realm (Queen Street)- works continue for several months.

⚠️ Road Safety Improvements

β€’ Ashwood- Road Safety Scheme- Works continue 10/08
β€’ Watergate Street- Road Safety Scheme- Works commence 10/08

Traffic management will be in place whilst the road safety improvement schemes are carried out.

🚢 Footway Resurfacing

Works to improve footways in the city continue this week. Schemes include:

β€’ Bream Way footway reconstruction- works commence 17/08.

πŸ›£οΈ Carriageway Resurfacing

Works to improve carriageways in the city continue this week.
Schemes include:

β€’ Lichfield Street
β€’ Ephraim Street

πŸ› Playground Projects

Work commencing Monday 24/08/2026.

β€’ Grange Park repainting bow top fence, final sections
β€’ Barret Drive playground, painting.
β€’ Breakspere Street cleansing and repaint.

We appreciate your patience and cooperation as we continue to improve local roads and infrastructure. πŸ‘·β€β™‚οΈπŸš—

🚧 Berwick Road – Proposed Traffic Calming Scheme 🚧Following requests from local residents and ward councillors, a road s...
17/08/2026

🚧 Berwick Road – Proposed Traffic Calming Scheme 🚧

Following requests from local residents and ward councillors, a road safety assessment has been undertaken on Berwick Road. As a result, Stoke-on-Trent City Council has developed a series of proposed measures to improve road safety and accessibility along Berwick Road.

πŸ“‹ The consultation plans are now available to view below.

Key Proposed Improvements:
βœ… Installation of traffic calming features, including speed cushions along Berwick Road, to reduce vehicle speeds.
βœ… Upgrading the existing zebra crossing to a raised table zebra crossing to improve pedestrian safety and reduce vehicle speed.
βœ… Installation of a pedestrian refuge / traffic island at Milton Rd / Berwick Road junction to prevent motorists cutting the corner.
βœ… Reinstatement of shared footway - cycleway markings to encourage active travel.
βœ… Refresh road markings and associated traffic signs to improve clarity and driver awareness.

Benefits of the Scheme:
πŸ”Έ Reduces vehicle speeds along Berwick Road.
πŸ”Έ Improves crossing safety for pedestrians/school children.
πŸ”Έ Cyclists provided with a safer alternative cyclepath to use instead of the carriageway.

Next Steps:
Following the consultation:
πŸ”Ή All comments received will be carefully considered.
πŸ”Ή Amendments will be made where appropriate before the final design is completed.
πŸ”Ή Subject to the outcome of the consultation and funding approval, a construction programme will be developed and start dates will be communicated in due course.

πŸ’¬ We want to hear your views.
If you have any comments on the proposed scheme, please email [email protected]. It would be helpful if you could also include your property number within your response.

πŸ“… The consultation closes on 7th September 2026.

🚧 Upcoming Highway Works – Week Starting 17th August 2026 🚧Please take note of the scheduled works across the city and p...
14/08/2026

🚧 Upcoming Highway Works – Week Starting 17th August 2026 🚧

Please take note of the scheduled works across the city and plan your journeys accordingly:

πŸ”§ Pothole Pro Works

The Pothole Pro will be carrying out small patch repairs to the carriageway.

These include:

β€’ 17/08- Ashlands Avenue- Basford and Hartshill
β€’ 18/08- New Inn Lane jct Pacific Road- Hanford, Newstead and Trentham
β€’ 19/08- Cocknage Road by L/C 5A- Dresden and Florence
β€’ 21/08- New Inn Lane jct Pacific Road and large patch next to Werburgh Drive- Hanford, Newstead and Trentham
β€’
🚦 Traffic Signal Works

Times Square Traffic Signal Upgrade - work commences Monday 22nd June until Spring 2027

🚌 Non-Highway Projects

Schemes include:

β€’ Longton Public Realm- works continue for several weeks
β€’ South Wolfe Street- works continue for several weeks
β€’ Burslem Public Realm (Queen Street)- works continue for several months.

⚠️ Road Safety Improvements

β€’ Ashwood- Road Safety Scheme- Works continue 10/08
β€’ Watergate Street- Road Safety Scheme- Works commence 10/08

Traffic management will be in place whilst the road safety improvement schemes are carried out.

🚢 Footway Resurfacing

Works to improve footways in the city continue this week. Schemes include:

β€’ Bream Way footway reconstruction- works commence 17/08.

πŸ›£οΈ Carriageway Resurfacing

Works to improve carriageways in the city continue this week. Schemes include:

β€’ Longley Road
β€’ Speedwall Street
β€’ Albany Road

πŸ› Playground Projects

Work commencing Monday 17/08/2026.

β€’ Grange Park repainting bow top fence, second half...
β€’ Barret Drive playground, cleansing, painting and minor repairs.

We appreciate your patience and cooperation as we continue to improve local roads and infrastructure. πŸ‘·β€β™‚οΈπŸš—

🚧 Upcoming Highway Works – Week Starting  10th August 2026 🚧Please take note of the scheduled works across the city and ...
07/08/2026

🚧 Upcoming Highway Works – Week Starting 10th August 2026 🚧

Please take note of the scheduled works across the city and plan your journeys accordingly:

πŸ”§ Pothole Pro Works

The Pothole Pro will be carrying out small patch repairs to the carriageway.

These include:

β€’ 10/08-12/08- Pitt Street West- Dig Down- Moorcroft and Sneyd Green
β€’ 13/08-14/08- Trentham Road by Hem Heath Woods- Hanford, Newstead and Trentham

🚦 Traffic Signal Works

Times Square Traffic Signal Upgrade - work commences Monday 22nd June until Spring 2027

🚌 Non-Highway Projects

Schemes include:

β€’ Longton Public Realm- works continue for several weeks
β€’ South Wolfe Street- works continue for several weeks
β€’ Burslem Public Realm (Queen Street)- works continue for several months.

⚠️ Road Safety Improvements

β€’ Ashwood- Road Safety Scheme- Works continue 10/08
β€’ Watergate Street- Road Safety Scheme- Works commence 10/08

Traffic management will be in place whilst the road safety improvement schemes are carried out.

We appreciate your patience and cooperation as we continue to improve local roads and infrastructure. πŸ‘·β€β™‚οΈπŸš—

The Campbell Road bridge over the A500 will be closed from tomorrow for National Highways works.The A5006 bridge will be...
04/08/2026

The Campbell Road bridge over the A500 will be closed from tomorrow for National Highways works.

The A5006 bridge will be closed to traffic in both directions for around six months while repairs are carried out to the bridge joints and waterproofing, alongside improvements to the central reservation and pavement.
It will remain open to pedestrians.

There are also a series of overnight road closures from 8pm to 6am for traffic management installation and prep work.
Tomorrow (27 July) - A50 to A500 southbound entry slip road closed
28-30 July - A500 exit slip road to A50 Sideway roundabout closed
- Hanford Interchange A500 northbound entry slip road closed
The bridge and this section of road are managed by National Highways. For full details of overnight closures and diversion maps go to: https://orlo.uk/a1NK7

🚧 Upcoming Highway Works – Week Starting  3rd August 2026 🚧Please take note of the scheduled works across the city and p...
31/07/2026

🚧 Upcoming Highway Works – Week Starting 3rd August 2026 🚧

Please take note of the scheduled works across the city and plan your journeys accordingly:

πŸ”§ Pothole Pro Works

The Pothole Pro will be carrying out small patch repairs to the carriageway.

These include:

β€’ 03/08- Sandhurst Place- Meir South
β€’ 04/08- Fenlow Avenue jct Kettering Drive- Bucknall and Eaton Park
β€’ 05/08- Ashlands Road outside 37-45- Basford and Hartshill
β€’ 06/08- Ripon Road outside Bell House Flats- Blurton
β€’ 07/08- Rosewood jct Leek New Road

🚦 Traffic Signal Works

Times Square Traffic Signal Upgrade - work commences Monday 22nd June until Spring 2027

πŸ›£οΈ Carriageway Resurfacing

Works to improve carriageways in the city continue this week.
Schemes include:

β€’ Baddeley Green Lane (1no. section)
β€’ St Aidans Street

Future carriageway resurfacing schemes (dates subject to change depending on completion of other surfacing projects or adverse weather conditions):

β€’ Sandon Road (1no. section)
β€’ Longley Road (1no. section)
β€’ Ludbrook Road

πŸ›£οΈ Carriageway Surface Treatment

β€’ Ongoing road markings following surface dressing

🚌 Non-Highway Projects

Schemes include:

β€’ Longton Public Realm- works continue for several weeks
β€’ South Wolfe Street- works continue for several weeks
β€’ Burslem Public Realm (Queen Street)- works continue for several months.

πŸ› Playground Projects

Work commencing Monday 03/08/2026.

β€’ Grange Park repainting bow top fence and trip rail painting.
β€’ Barret Drive playground, cleansing, painting and minor repairs.

We appreciate your patience and cooperation as we continue to improve local roads and infrastructure. πŸ‘·β€β™‚οΈπŸš—

29/07/2026

If you throw litter from a vehicle, you can receive a Fixed Penalty Notice.

Keep it in the car. Bin it when you stop.

Be a Binner. Not a Tosser.

πŸ“· Taken on the slip road near Bet365.

Address

Glebe Street
Stoke-on-Trent
ST41HH

Alerts

Be the first to know and let us send you an email when Stoke-on-Trent Highways posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share