HART-NHS  - Hazardous area response team .Vision Ecs have been at HART this week carrying on with the trust wide chargin...
21/05/2026

HART-NHS - Hazardous area response team .
Vision Ecs have been at HART this week carrying on with the trust wide charging works .
Removing the existing 110v transformers and charging leads and installing new mains cabling ,auto safe units and the new hanging lead configuration.

Spectrum 1600 -Big task last week removing the exsiting generator that served the original tenant .The generator was dis...
18/05/2026

Spectrum 1600 -
Big task last week removing the exsiting generator that served the original tenant .
The generator was disconnected from the electrical mains and change over switch .
We also removed the fuel tank and flu through the roof .
The building will now be converted into a bike shelter for the new tenants across 3 floors .

Basingstoke Ambulance Station.A successful couple of weeks completing the asbestos removal around the perimeter of the b...
10/05/2026

Basingstoke Ambulance Station.
A successful couple of weeks completing the asbestos removal around the perimeter of the building. Carrying out works within a live ambulance station is always challenging — even more so when asbestos removal is involved.
The contents of the rooms were cleared in carefully planned stages, allowing the works to progress while still enabling the station and team leaders to continue operating effectively throughout.
This week, the installation of the new windows and doors is underway.

08/05/2026
Skylark golf and country club -Decking refurbishment is taking shape. The new spindles and handrails have been installed...
08/05/2026

Skylark golf and country club -

Decking refurbishment is taking shape.
The new spindles and handrails have been installed removing the rotten exsiting ones .

Repairs to the decking and renewal of any rotten boards

Decorating underway and new artificial grass has been layed today really transforming the area .

Phase 2-Fleet workshop NHS -Phase 2 of the new fleet workshop is now well underway. Construction of the new rooms beneat...
28/04/2026

Phase 2-Fleet workshop NHS -

Phase 2 of the new fleet workshop is now well underway. Construction of the new rooms beneath the mezzanine has begun, alongside the installation of electrical, data, and air conditioning services.
Additionally, line markings for Phase 1 have been completed, clearly defining the designated walkways.

Fresh paint and new flooring being installed at Didcot Resource Centre this week as part of the ongoing refurbishment.  ...
16/04/2026

Fresh paint and new flooring being installed at Didcot Resource Centre this week as part of the ongoing refurbishment.

🤝SCAS - pharmacy urgent upgrade works -After successfully delivering the project in the south ,Vision have now started t...
14/04/2026

🤝
SCAS - pharmacy urgent upgrade works -

After successfully delivering the project in the south ,
Vision have now started to deliver sites in the North
Working alongside ,pharmacy ,estates and IT .

SCAS are implementing a project to meet compliance requirements for the Safe and Secure
Handling of Medicines.
AS part of this project, a trust-wide programme to integrate a new Abloy Digital system is taking place.

This work involves:
• Installing new Controlled Drug Safe/s in suitable locations
• Installing IT Points, where required
• Installing the Abloy Digital System

Sites to be covered -
Didcot
Adderbury
Newbury
Wexham
Milton Keynes
Stoke Mandeville RC
Bracknell
Oxford city
High wycombe
Kidlington .

Vision have been awarded certified carbon neutral business  for another year .Offsetting our carbon usage to create a ne...
11/04/2026

Vision have been awarded certified carbon neutral business for another year .
Offsetting our carbon usage to create a net zero usage for the business .

Quick turnaround at Didcot changing the room into a new quiet room from the temporary kitchen .New slatted blinds Lighti...
27/03/2026

Quick turnaround at Didcot changing the room into a new quiet room from the temporary kitchen .
New slatted blinds
Lighting
Carpet
Decoration
Wall art .
Relaxing space for the staff to take some time out from their shift .

Address

Swallowfield
RG71PQ

Alerts

Be the first to know and let us send you an email when Vision CPS & Vision air conditioning & refrigeration posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share