28/08/2026
We call upon the Government to immediately cease the practice of designating new data centres as "critical infrastructure".
Classifying them along with vital sectors like energy, water and food - means that they are prioritised for access to water and energy - even in droughts like those we’ve seen this summer.
We say new data centres should receive planning permission only when they show they will meet the highest environmental standards and following full community consultation.
The Green Party is calling for a comprehensive national strategy for AI infrastructure prioritising:
✅ Community-led decision making
Local areas should have a say in where data centres are built.
✅ Environmental responsibility
Data centres should be built on brownfield sites close to renewable energy hubs and so that they can be powered, wherever possible, from 100 per cent renewable sources. All data centres should report audited annual figures on water and electricity consumption, and investment must prioritise less water-intensive cooling methods, energy efficiency and technology for capturing and redirecting waste heat for local heating.
✅ Digital sovereignty
The UK is currently dependent on foreign-owned infrastructure for critical services, from healthcare diagnostics to public safety. Furthermore, AI decisions are increasingly made by ‘black-box’ systems that are almost impossible to scrutinise. We need to develop and invest in UK AI infrastructure, with the focus being on more control, regulation and transparency.