29/08/2026
Today: Tinkabell's refurbishment starts, Wickham continues and Hanging Pegs!
Cloud and rain set the tone for the day, with several heavy showers rolling through, yet it still managed to stay warm on site. Being a Mills Public Day, two trains were run, carrying just 13 passengers not a huge number, but with only twenty visitors in total it was a respectable showing given the horrible and in challenging rail conditions.
The morning began with topping up the Baguley’s diesel, followed by the start of the next stage in the refurbishment of Tinkabell the Ruston LBU - stripping all of the old paint from the bonnet panels. Also, oddly, a large pump / water feature was unloaded from the Mills site trailer with the JCB and moved into storage on the PW Yard slab.
Work on the Wickham trolley continued at a good pace. Fresh undercoats — both grey and white — went onto the completed end panel, and a wire‑mesh grille was fitted neatly across the low‑level ventilation opening. The final underseat panel was cut and installed, and four new upright timber corner battens were shaped, sanded, and fixed into position. With all this done, the first end panel is now ready to be fitted on Wednesday, after which topcoating can finally begin.
Elsewhere, the spanner rack in Workshop 83B received renewed hanging pegs, restoring order and making it possible to hang every spanner in its proper place again. A small job, but one that makes a big difference to workshop efficiency.
Despite the wet weather, it turned into a productive undercover day, with steady progress across several projects and momentum maintained where it mattered.