Project Facilities
The Concessionaire shall construct the Project Facilities in accordance with the provisions of this Agreement. Such Project Facilities shall include for both project corridors
Pedestrian facilities;
Street Lighting;
Passenger shelters;
Traffic Aid Posts;
Medical Aid Posts;
Vehicle Rescue Posts;
Telecom System;
Operation and Maintenance Centre;
Roadside furniture;
Landscaping and tree plantation;
Project Facilities for Six-Laning with service roads and Four Lanning
(a) Cambridge School to Nagarnaka including flyover at. chikhalthana,Akashwani Chowk,Ameerpeet chowk &Nagarnaka in Aurangabad city
(b) Zalta Phata (km 292.400) to Mahanubhav chowk (km 305.400) in Beed
Bypass & Connecting links for the Aurangabad city to Propose Aurangabad bypass with ROBs at Mukundwadi and Devlai chowk
1Lighting:
(a) Cambridge School to Nagarnaka including flyover at. chikhalthana,Akashwani chowk,Ameerpeet chowk &Nagarnaka in Aurangabad city
a. High mast lighting :Provide High mast lighting at all major junctions as mention in schedules B.
b) Street lighting: Provide Street lighting with solar pannel for service road/Slip Road and main carriageway
Bus Shelters
(a) Cambridge School to Nagarnaka including flyover at. chikhalthana,Akashwani Chowk,Ameerpeet chowk &Nagarnaka in Aurangabad city
Proposed Location
1 Nagar Naka 0+050
2 Holy Cross School 1+300
3 Baba Petrol Pump 1+750
4 Old High Court 2+700
5 Kranti Chowk 3+100
6 Dudh Dairy/Amarpreet Chowk 3+700
7 CADA Irrigation Office 4+300
8 SFS School 5+150
9 Seven Hill Junction 6+200
10 High Court Aurangabad 6+700
11 CIDCO Bust Stand 7+200
12 Mukundawadi Junction 8+250
13 Dhoot Hospital 9+450
14 Mini Ghati Government Hospital 10+350
15 Chikaltana 11+450
16 Cambridge School 14+250
Total no of bus shelters= 2 x 16 = 32 nos.
Roadside furniture
Traffic Signs: Traffic signs include roadside signs, overhead signs, glare cut offs and curb mounted signs along the entire Project Highway.
Overhead signs: Minimum 22 Nos gantry and 22 no cantilever gantry
Pavement Markings: Pavement markings shall cover road marking for the entire Project Highway.
LED Traffic Beacons: shall be provided for the entire Project Highway at all junctions.
Crash barrier:
Provide the w metal beam crash barrier along the project highway at the location specified below:
1. 150m both sides of all major bridges.
2. 50m both sides of all minor bridges.
3. Embankment of height >3.0m sections
4. Sharp curves