SantaCruz - Chembur Link Road (SCLR)

SantaCruz - Chembur Link Road (SCLR) SCLR The Santa Cruz-Chembur Link Road (SCLR) is currently under construction in Mumbai, the capital of Maharashtra in India.

It is expected to be completed in over a year (2008 q4) by Diwali and is currently running over a year behind schedule. It will be a 'double decker' flyover almost 6.5 km long. The current cost of this World Bank project is over Rs. 550 Crore (US$ 125 million) from an initial estimate of Rs. 110 Crore (5x original cost). The SCLR and JVLR (Jogeshwari-Vikhroli Link Road) are some of the projects of

the MMRDA. Santacruz Chembur Link Road is an important arterial road connecting Western Express Highway(WEH) and Eastern Express Highway(EEH). Total length of Santacruz Chembur Link Road is 6.45 km starting from Dr. Hans Bhugra junction on WEH in Santacruz East and running to the East skirting Vidyanagari Campus (Mumbai University at Kalina) on its south and meeting Lal Bahadur Shastri (LBS) Marg after crossing Mithi River Bridge. Thereafter it follows the existing S.G.Barve Marg to a length of about 150 meters and beyond a new road is proposed through slums and crosses the Mumbai Kalyan Central Railway (Main) line. Further passes close to Lokmanya Tilak Terminus and through MHADA colony, running parallel to Harbour Line up to Amar Mahal junction of Eastern Express Highway. The scope of work proposed for ex*****on under MUTP is from the east end of 6 lane Mithi River Bridge up to Amar Mahal Junction of Eastern Express Highway(length 3.4 km, Ch.0+000 to 3+400) which is divided into two sections for ex*****on purpose. Section – 1 Ch. 0+000 to 1+335 and Ch. 2+775 to Ch. 3+400 and surrounding junction improvement 2.00 km Section – 2 ROB and viaduct portion from Ch. 1+335 to Ch. 2+775 including Nehru Nagar Arm 1.40 km Total 3.40 km

Ghar vapsi for 263 Chembur Families.
01/03/2016

Ghar vapsi for 263 Chembur Families.

The families, displaced by SCLR, waited 13 years to get better houses in the same area.

01/03/2016

Commuters can expect relief from traffic snarls on the Eastern Express Highway (EEH) as the Mumbai Metropolitan Region Development Authority...

24/04/2014

mumbaikars did you exercise your vote?

first accident on sclr yesterday :( near Tilak Nagar
23/04/2014

first accident on sclr yesterday :( near Tilak Nagar

23/04/2014
lol :P
22/04/2014

lol :P

22/04/2014
19/04/2014
18/04/2014

anyone enjoyed the ride at the bridge..!!?????

12/04/2014

Atlast india's first double-decker flyover is almost ready....!!! :)

23/12/2011

Did You Know???
Roberto Zagha,World Banks Country Director,had called the SCLR the world's most delayed road project !!!

23/12/2011

According to a survey 10lakh families have been affected due to this massive construction!!!