Salcef Group

Salcef Group Salcef è il gruppo societario italiano leader nel settore ferroviario.

𝗖𝗼𝘀𝗲𝗻𝘇𝗮-𝗖𝗮𝘁𝗮𝗻𝘇𝗮𝗿𝗼 𝗟𝗶𝗱𝗼: 𝗺𝗮𝗶𝗻𝘁𝗲𝗻𝗮𝗻𝗰𝗲 𝘄𝗼𝗿𝗸𝘀 𝗼𝗻 𝗯𝗿𝗶𝗱𝗴𝗲𝘀 𝗮𝗻𝗱 𝘃𝗶𝗮𝗱𝘂𝗰𝘁𝘀In Calabria, Southern Italy, we are carrying out 𝗲𝘅𝘁𝗿𝗮𝗼...
28/05/2026

𝗖𝗼𝘀𝗲𝗻𝘇𝗮-𝗖𝗮𝘁𝗮𝗻𝘇𝗮𝗿𝗼 𝗟𝗶𝗱𝗼: 𝗺𝗮𝗶𝗻𝘁𝗲𝗻𝗮𝗻𝗰𝗲 𝘄𝗼𝗿𝗸𝘀 𝗼𝗻 𝗯𝗿𝗶𝗱𝗴𝗲𝘀 𝗮𝗻𝗱 𝘃𝗶𝗮𝗱𝘂𝗰𝘁𝘀

In Calabria, Southern Italy, we are carrying out 𝗲𝘅𝘁𝗿𝗮𝗼𝗿𝗱𝗶𝗻𝗮𝗿𝘆 𝗺𝗮𝗶𝗻𝘁𝗲𝗻𝗮𝗻𝗰𝗲 and 𝘀𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗮𝗹 𝗿𝗲𝗵𝗮𝗯𝗶𝗹𝗶𝘁𝗮𝘁𝗶𝗼𝗻 𝗮𝗰𝘁𝗶𝘃𝗶𝘁𝗶𝗲𝘀 on bridges, viaducts and ancillary structures along the Cosenza-Catanzaro Lido railway line.

Among the structures involved, the 𝗙𝗶𝘂𝗺𝗮𝗿𝗲𝗹𝗹𝗮 𝗩𝗶𝗮𝗱𝘂𝗰𝘁 is one of the most technically complex. The single-track viaduct, made up of six arches, extends approximately 125 metres and reaches a maximum 𝗵𝗲𝗶𝗴𝗵𝘁 𝗼𝗳 𝟯𝟳 𝗺𝗲𝘁𝗿𝗲𝘀, with a curved horizontal alignment.

Its height, structural configuration and limited accessibility increase the complexity of our operations, requiring detailed engineering planning, specialised expertise and rigorous ex*****on.

🏃‍♀️ 𝗔𝘁 𝗥𝗮𝗰𝗲 𝗳𝗼𝗿 𝘁𝗵𝗲 𝗖𝘂𝗿𝗲 𝟮𝟬𝟮𝟲Today we took part in Race for the Cure 2026 in Rome.Our team joined the 5 km run and walk...
10/05/2026

🏃‍♀️ 𝗔𝘁 𝗥𝗮𝗰𝗲 𝗳𝗼𝗿 𝘁𝗵𝗲 𝗖𝘂𝗿𝗲 𝟮𝟬𝟮𝟲

Today we took part in Race for the Cure 2026 in Rome.

Our team joined the 5 km run and walk at Circo Massimo, together with colleagues, families and friends, sharing a meaningful day in support of an important cause.

🎗️ 𝗥𝗮𝗰𝗲 𝗳𝗼𝗿 𝘁𝗵𝗲 𝗖𝘂𝗿𝗲 𝟮𝟬𝟮𝟲From 7 to 10 May, Rome will host Race for the Cure 2026, the initiative by Komen Italia dedicat...
07/05/2026

🎗️ 𝗥𝗮𝗰𝗲 𝗳𝗼𝗿 𝘁𝗵𝗲 𝗖𝘂𝗿𝗲 𝟮𝟬𝟮𝟲

From 7 to 10 May, Rome will host Race for the Cure 2026, the initiative by Komen Italia dedicated to the fight against breast cancer.

We are proud to support this important event and to join the 5 km run and walk at Circo Massimo on 10 May.

28/04/2026

𝗪𝗼𝗿𝗹𝗱 𝗗𝗮𝘆 𝗳𝗼𝗿 𝗦𝗮𝗳𝗲𝘁𝘆 𝗮𝗻𝗱 𝗛𝗲𝗮𝗹𝘁𝗵 𝗮𝘁 𝗪𝗼𝗿𝗸 🛡️

Today is World Day for Safety and Health at Work. This year’s focus is on tackling psychosocial risks at work.
At Salcef Group, safety means protecting people in every dimension of their work: on site, in daily operations, and in the way we plan, lead and work together.
As a global Group with more than 2,300 people working across a wide range of projects and geographies, we know that safety is a shared responsibility.

“𝗦𝗮𝗳𝗲𝘁𝘆 𝘀𝘁𝗮𝗿𝘁𝘀 𝘄𝗶𝘁𝗵 𝘂𝘀” is our reminder that safety is built day by day: through awareness, cooperation, communication and leadership — so that rules become culture, and culture becomes everyday behaviour.

Because no result matters without safety.

📹  𝗜𝗻𝘀𝗶𝗱𝗲 𝘁𝗵𝗲 𝗙𝗿𝗮𝗻𝗰𝗶𝗰𝗮 𝗧𝘂𝗻𝗻𝗲𝗹: 𝗙𝗔𝗦𝗧 𝗮𝘁 𝘄𝗼𝗿𝗸!In the Francica Tunnel, on the Battipaglia–Reggio Calabria line, we are carr...
24/04/2026

📹 𝗜𝗻𝘀𝗶𝗱𝗲 𝘁𝗵𝗲 𝗙𝗿𝗮𝗻𝗰𝗶𝗰𝗮 𝗧𝘂𝗻𝗻𝗲𝗹: 𝗙𝗔𝗦𝗧 𝗮𝘁 𝘄𝗼𝗿𝗸!

In the Francica Tunnel, on the Battipaglia–Reggio Calabria line, we are carrying out a strategic track renewal project along one of Italy’s main north–south rail corridors.

The project involves replacing the existing ballasted track with our 𝗙𝗔𝗦𝗧 𝗦𝘆𝘀𝘁𝗲𝗺, a ballastless solution based on precast concrete slabs, installed on both tracks throughout the tunnel for a total length of 𝟭𝟭.𝟱 𝗸𝗺.

Work is progressing rapidly, without interrupting rail traffic, thanks to the FAST System and our specialized work trains.

▶️ Watch the video for a closer look.
https://youtu.be/Pg3jdqfo20k?si=XdweUW06auK4jc1G

24 likes. "Francica Tunnel: Track Renewal with FAST System"

📰 𝗕𝗜𝗠 𝗖𝗼𝗻𝗳𝗲𝗿𝗲𝗻𝗰𝗲 𝗡𝗮𝗽𝗼𝗹𝗶 𝟮𝟬𝟮𝟲Si è svolto oggi a Napoli il BIM Conference Napoli 2026, convegno organizzato da One Team pr...
22/04/2026

📰 𝗕𝗜𝗠 𝗖𝗼𝗻𝗳𝗲𝗿𝗲𝗻𝗰𝗲 𝗡𝗮𝗽𝗼𝗹𝗶 𝟮𝟬𝟮𝟲
Si è svolto oggi a Napoli il BIM Conference Napoli 2026, convegno organizzato da One Team presso l’Aula Magna dell’Università degli Studi di Napoli Federico II, dedicato all’evoluzione del 𝗕𝘂𝗶𝗹𝗱𝗶𝗻𝗴 𝗜𝗻𝗳𝗼𝗿𝗺𝗮𝘁𝗶𝗼𝗻 𝗠𝗼𝗱𝗲𝗹𝗶𝗻𝗴 nel settore delle infrastrutture.

Per 𝗥𝗘𝗖𝗢, società di progettazione del Gruppo Salcef, ha partecipato Antonio De Simone, BIM Manager, intervenendo con un approfondimento tecnico dal tema "𝗥𝗶𝗻𝗻𝗼𝘃𝗼 𝗕𝗶𝗻𝗮𝗿𝗶 𝗜-𝗜𝗜 𝗘𝘀𝘁 – 𝗦𝘁𝗮𝘇𝗶𝗼𝗻𝗲 𝗧𝗲𝗿𝗺𝗶𝗻𝗶 - 𝗥𝗼𝗺𝗮".
La presentazione si è incentrata sulla gestione del cantiere nell’ottica del 𝗕𝗜𝗠 𝟰𝗗 (𝘁𝗲𝗺𝗽𝗶) e 𝟱𝗗 (𝗰𝗼𝘀𝘁𝗶), illustrando l’integrazione tra modelli informativi, pianificazione delle fasi operative e controllo economico dell’intervento.

L’intervento ha dato avvio a un dibattito che ha visto il contributo di importanti realtà attive nel mondo delle infrastrutture.

🎥 𝗙𝗿𝗼𝗺 𝗼𝘂𝗿 𝘄𝗼𝗿𝗸𝘀𝗶𝘁𝗲𝘀 𝘁𝗼 𝗺𝗶𝗻𝗶𝗮𝘁𝘂𝗿𝗲 𝗺𝗼𝗱𝗲𝗹𝘀Some of the large yellow railway maintenance machines built by SRT and used ever...
12/04/2026

🎥 𝗙𝗿𝗼𝗺 𝗼𝘂𝗿 𝘄𝗼𝗿𝗸𝘀𝗶𝘁𝗲𝘀 𝘁𝗼 𝗺𝗶𝗻𝗶𝗮𝘁𝘂𝗿𝗲 𝗺𝗼𝗱𝗲𝗹𝘀

Some of the large yellow railway maintenance machines built by SRT and used every day on our construction sites have been recreated in 5-inch gauge scale by Italian model maker Gabriele Lisetti.

In 𝗣𝗼𝗰𝗸𝗲𝘁 𝗧𝗿𝗮𝗶𝗻𝘀 – 𝗧𝗵𝗲 𝗖𝗿𝗮𝗳𝘁𝘀𝗺𝗮𝗻 𝗼𝗳 𝗠𝗶𝗻𝗶𝗮𝘁𝘂𝗿𝗲 𝗦𝘁𝗲𝗲𝗹, Lisetti shares his passion for railway modelling and the careful research, precision and craftsmanship behind models inspired by real railway work vehicles.

A miniature tribute to the vehicles that support our work on site every day.

Watch the video on SRT’s YouTube channel: https://youtu.be/kwF_7nK94mc?si=Kc9atx3XlWQMAclD
𝑬𝒏𝒈𝒍𝒊𝒔𝒉 𝒔𝒖𝒃𝒕𝒊𝒕𝒍𝒆𝒔 𝒂𝒗𝒂𝒊𝒍𝒂𝒃𝒍𝒆.

Discover how SRT railway maintenance machines become miniature masterpieces.English subtitles available.In Pocket Trains – The Craftsman of Miniature Steel, ...

31/03/2026

📰 𝗧𝗶𝗹𝗲𝗮𝗴𝗱-𝗢𝘀𝗼𝗿𝗵𝗲𝗶 𝘀𝗲𝗰𝘁𝗶𝗼𝗻 𝗿𝗲𝗼𝗽𝗲𝗻𝗲𝗱 𝘁𝗼 𝘁𝗿𝗮𝗳𝗳𝗶𝗰

Today, 31 March 2026, traffic is running again on the Tileagd-Osorhei railway section (Romania).

Our teams worked along the line and at Osorhei station, delivering a full track renewal with more than 9 km of track renewed, new turnouts installed and a new alignment connecting the upgraded section to the existing line.

A great result achieved on site.

📰 𝗩𝗲𝗿𝗼𝗻𝗮-𝗣𝗮𝗱𝘂𝗮 𝗵𝗶𝗴𝗵-𝘀𝗽𝗲𝗲𝗱 𝗹𝗶𝗻𝗲: 𝗮 𝗻𝗲𝘄 𝗺𝗶𝗹𝗲𝘀𝘁𝗼𝗻𝗲In just 𝘀𝗶𝘅 𝗺𝗼𝗻𝘁𝗵𝘀, we completed track construction along the entire Vero...
24/03/2026

📰 𝗩𝗲𝗿𝗼𝗻𝗮-𝗣𝗮𝗱𝘂𝗮 𝗵𝗶𝗴𝗵-𝘀𝗽𝗲𝗲𝗱 𝗹𝗶𝗻𝗲: 𝗮 𝗻𝗲𝘄 𝗺𝗶𝗹𝗲𝘀𝘁𝗼𝗻𝗲

In just 𝘀𝗶𝘅 𝗺𝗼𝗻𝘁𝗵𝘀, we completed track construction along the entire Verona-Bivio Vicenza section — 𝟴𝟴 𝗸𝗺 𝗼𝗳 𝘁𝗿𝗮𝗰𝗸 and 20 turnouts.

A result built day by day by our teams on site, combining expertise, coordination and advanced mechanized construction, including the use of the MCB01 track-laying train.

This is one more step forward in the development of the Milan-Venice corridor, part of the TEN-T network, helping shape faster and more sustainable rail connections.

🎥 Watch the video https://youtu.be/XpuTWKcBDFY

Owner: RFI S.p.A.
General Contractor: IRICAV DUE
Prime Contractor: Salcef S.p.A.

We have completed track construction along the entire Verona-Bivio Vicenza section, delivering 88 km of track and 20 turnouts in just six months.A major mile...

🎓 𝗦𝗮𝗹𝗰𝗲𝗳 𝗚𝗿𝗼𝘂𝗽 𝗮𝗶 𝗦𝗮𝗽𝗶𝗲𝗻𝘇𝗮 𝗖𝗮𝗿𝗲𝗲𝗿 𝗗𝗮𝘆𝘀 𝟮𝟬𝟮𝟲Il 18 marzo saremo ai Sapienza Career Days per incontrare studenti e laureati...
16/03/2026

🎓 𝗦𝗮𝗹𝗰𝗲𝗳 𝗚𝗿𝗼𝘂𝗽 𝗮𝗶 𝗦𝗮𝗽𝗶𝗲𝗻𝘇𝗮 𝗖𝗮𝗿𝗲𝗲𝗿 𝗗𝗮𝘆𝘀 𝟮𝟬𝟮𝟲

Il 18 marzo saremo ai Sapienza Career Days per incontrare studenti e laureati interessati a lavorare nel mondo delle infrastrutture ferroviarie.

Vieni a conoscere il nostro team, scoprire i progetti del Gruppo e consegnare il tuo CV.

📍 Città Universitaria – Piazzale Aldo Moro 5, Roma
📅 18 marzo 2026

🔎 Maggiori informazioni sul sito dell’Università La Sapienza.
https://www.uniroma1.it/it/notizia/sapienza-career-days-2026

Ti aspettiamo!

Indirizzo

Via Salaria, 1027
Rome
00138

Notifiche

Lasciando la tua email puoi essere il primo a sapere quando Salcef Group pubblica notizie e promozioni. Il tuo indirizzo email non verrà utilizzato per nessun altro scopo e potrai annullare l'iscrizione in qualsiasi momento.

Contatta L'organizzazione

Invia un messaggio a Salcef Group:

Condividi