Chemususu Water Supply and Distribution Project

Chemususu Water Supply and Distribution Project A Water Supply projected to serve both Baringo and Nakuru counties

The appearance of the water treatment works in Chemususu as at 24th February, 2020
24/02/2020

The appearance of the water treatment works in Chemususu as at 24th February, 2020

10/12/2019

Molo River at Kelelwa Bridge after bursting its banks due to the ongoing heavy rains

Sludge drying beds under construction. The matter being collected at the base of the sedimentation basins of the water t...
13/10/2019

Sludge drying beds under construction. The matter being collected at the base of the sedimentation basins of the water treatment plant is delivered to these beds via pipeline, subjected to natural oxidation process, before being discharged to the environment.

The construction of the 450m3 Emining tank is well on course.
13/08/2019

The construction of the 450m3 Emining tank is well on course.

Water from Chemususu finally arrives in Eldama Ravine Town. With the commissioning being done by none other than the Dep...
07/07/2019

Water from Chemususu finally arrives in Eldama Ravine Town. With the commissioning being done by none other than the Deputy President of the Republic of Kenya, the residents of this town had e every reason to smile.

The base slab of the 450m3 Kaptana tank being applied with concrete, after steel reinforcement has been fixed
21/06/2019

The base slab of the 450m3 Kaptana tank being applied with concrete, after steel reinforcement has been fixed

Concrete casting of the roof slab of the 1 million-litre tank at Emgwen, Kampi ya moto junction, in progress as at today...
03/06/2019

Concrete casting of the roof slab of the 1 million-litre tank at Emgwen, Kampi ya moto junction, in progress as at today 3rd June, 2019.

The project client and implementers occasionally hold consultative meetings with beneficiaries to iron out issues arisin...
04/04/2019

The project client and implementers occasionally hold consultative meetings with beneficiaries to iron out issues arising

The permanent office for ERAWASCO in Kamelilo is already taking shape
18/03/2019

The permanent office for ERAWASCO in Kamelilo is already taking shape

The people around Tolmo have not been left out in this project. This 500,000 litre-tank is a testimony.
18/03/2019

The people around Tolmo have not been left out in this project. This 500,000 litre-tank is a testimony.

Works on the 500 cubic-metre Kibias tank is underway.
15/03/2019

Works on the 500 cubic-metre Kibias tank is underway.

Address

Chemususu
Eldama Ravine
25450

Telephone

+254736863888

Website

Alerts

Be the first to know and let us send you an email when Chemususu Water Supply and Distribution Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Chemususu Water Supply and Distribution Project:

Share