Millennium Highway & West Coast Road Reconstruction Project

Millennium Highway & West Coast Road Reconstruction Project Funded by UKCIF, CDB, and the Government of Saint Lucia.

The Millennium Highway & West Coast Road Reconstruction Project is upgrading key roads in Saint Lucia to improve safety, resilience, and socio-economic development.

28/05/2026

๐Ÿ“ข PUBLIC NOTICE TO RESIDENTS AND MOTORISTS

Motorists and residents are advised that works are scheduled to commence on the box culvert at Anse Galet as part of ongoing improvements along the West Coast Road corridor.

During these operations, steel cage units will be transported from Cul-de-Sac to the project site at Anse Galet. This activity will involve the movement of heavy equipment and oversized loads along the Anse La Raye main access road.

These activities are scheduled to take place on:

๐Ÿ“… Thursday 28th May 2026
๐Ÿ•˜ 9:00 a.m. โ€“ 12:00 p.m.

Road users are asked to exercise caution, particularly near corners and areas with restricted visibility, and to follow the instructions of traffic personnel who will be on site to coordinate the safe movement of vehicles and equipment.

Residents and motorists are also kindly asked to avoid parking along sections of the Anse La Raye main access road during this period, where possible, to facilitate the safe and efficient passage of equipment.

We thank the public for its continued patience and cooperation as these essential infrastructure works progress.

14/05/2026

Today, the Millennium Highway and West Coast Road Reconstruction Project opened the corridor to a new generation of engineers, builders and problem-solvers.

Students from Sir Arthur Lewis Community College and TVET institutions stepped beyond the classroom and onto one of Saint Luciaโ€™s most climate-vulnerable transport corridors โ€” exploring firsthand how resilient infrastructure is designed, built and adapted for a changing climate.

From engineered drainage systems and retaining structures to bridge and culvert interventions, the Technical Site Briefing and Guided Project Tour offered students the opportunity to connect theory with practice in a real-world environment shaped by geography, weather and national need.

But perhaps most importantly, the experience offered perspective.

Because the future of climate resilience in Saint Lucia will depend not only on the infrastructure we build today โ€” but on the people who will carry that work forward tomorrow.

๐ŸŽฅ Watch highlights from the tour.

Today students of Engineering and Building Construction from SALCC, Comprehensive and TVET schools are getting a close u...
13/05/2026

Today students of Engineering and Building Construction from SALCC, Comprehensive and TVET schools are getting a close up view of the Climate Resilience design considerations behind the Millennium Highway Reconstruction Project. We start with a technical briefing by engineers Jodie Fontenard and Nicole Magloire from the Engineering Consultant Firm of FDL Consult. Then we go on the road to tour four sites.

Big thanks to the Ministry of Education (TVET Unit) for the willing partnership to help students bridge the classroom learning with the real life context.

You can usually tell when a project is moving forward by the arrival of the utility teams.At En Champagne in Anse La Ray...
06/05/2026

You can usually tell when a project is moving forward by the arrival of the utility teams.

At En Champagne in Anse La Raye, utility-related works are now underway as preparations continue at the designated relocation site for Project Affected Persons (PAPs).

These works are part of the broader effort to ensure the site is equipped and ready to support homeowners being relocated under the Project.

Progress isnโ€™t always loud.
Sometimes it looks like pipes, valves, utility trucks โ€” and the quiet work of preparing a place for people to start again.

๐Ÿ“ En Champagne, Anse La Raye

Taking shape โ€” and opening new opportunities.Construction of the Roseau Food & Souvenir Market is progressing steadily, ...
29/04/2026

Taking shape โ€” and opening new opportunities.

Construction of the Roseau Food & Souvenir Market is progressing steadily, with structures now clearly taking form.

Developed under the Millennium Highway and West Coast Road Reconstruction Projectโ€™s Resettlement Action Plan (RAP), this new space will support vendors with a more secure and organised environment.

Step by step, the future of the Roseau Market is being built.

28/04/2026

Hereโ€™s whatโ€™s happening now at Anse Galet.

Works are currently underway as part of the installation of the box culvert, with heavy equipment and materials being moved into position on site.

As these activities continue, road users can expect traffic management in the area.

Please proceed with caution, especially near corners and areas with limited visibility, and follow directions from traffic controllers on site.

We appreciate your patience as these works progress.

๐Ÿšง Public Notice โ€“ Anse Galet WorksNamalco St. Lucia wishes to advise the public that works on the box culvert at Anse Ga...
28/04/2026

๐Ÿšง Public Notice โ€“ Anse Galet Works

Namalco St. Lucia wishes to advise the public that works on the box culvert at Anse Galet will commence shortly.

As part of these operations, prefabricated culvert units will be transported from Cul-de-Sac to the Anse Galet site. This will involve the movement of heavy equipment and oversized loads along the main road through Anse La Raye.

๐Ÿ—“ Dates: Tuesday 28 โ€“ Thursday 30 April 2026
โฐ Time: 8:00 AM โ€“ 5:30 PM

Road users and residents are urged to exercise caution, particularly near corners and areas with restricted visibility.

Please follow all instructions from traffic controllers on site, who will be present to ensure safe passage.

We thank you for your cooperation as these essential works are carried out.

22/04/2026

This Earth Day, weโ€™re highlighting the systems you donโ€™t always see โ€” but that make all the difference.

Across the Millennium Highway and West Coast Road, drainage and slope protection works are being integrated into the design to manage water, reduce erosion, and protect surrounding communities.

Because resilience is not just about building roads โ€”
itโ€™s about how those roads respond to the environment around them.

๐Ÿšง๐™‹๐™๐˜ฝ๐™‡๐™„๐˜พ ๐™‰๐™Š๐™๐™„๐˜พ๐™€: ๐™๐™ง๐™–๐™›๐™›๐™ž๐™˜ ๐™ˆ๐™–๐™ฃ๐™–๐™œ๐™š๐™ข๐™š๐™ฃ๐™ฉ ๐™–๐™ฉ ๐˜ผ๐™ฃ๐™จ๐™š ๐™‚๐™–๐™ก๐™š๐™ฉ ๐Ÿšง๐–๐ž๐ฌ๐ญ ๐‚๐จ๐š๐ฌ๐ญ ๐‘๐จ๐š๐ ๐‚๐จ๐ฆ๐ฆ๐ฎ๐ญ๐ž๐ซ๐ฌ:Please be advised that Namalco has commenced...
20/04/2026

๐Ÿšง๐™‹๐™๐˜ฝ๐™‡๐™„๐˜พ ๐™‰๐™Š๐™๐™„๐˜พ๐™€: ๐™๐™ง๐™–๐™›๐™›๐™ž๐™˜ ๐™ˆ๐™–๐™ฃ๐™–๐™œ๐™š๐™ข๐™š๐™ฃ๐™ฉ ๐™–๐™ฉ ๐˜ผ๐™ฃ๐™จ๐™š ๐™‚๐™–๐™ก๐™š๐™ฉ ๐Ÿšง

๐–๐ž๐ฌ๐ญ ๐‚๐จ๐š๐ฌ๐ญ ๐‘๐จ๐š๐ ๐‚๐จ๐ฆ๐ฆ๐ฎ๐ญ๐ž๐ซ๐ฌ:

Please be advised that Namalco has commenced construction on the Anse Galet culvert (Lot 3A, Ch 1+771).

To ensure your safety and minimize disruptions, a Divergent Road has been constructed and a traffic management plan is currently in effect.

๐Ÿ“… Duration: April 17th to Thursday, April 30th, 2026 (Approximately 2 weeks)
๐Ÿ“ Location: Anse Galet Culvert

We anticipate these works will be completed within the two-week timeframe. However, should an extension be necessary, we will provide advance notice to the public.

Please proceed with caution and follow all posted traffic signs in the area. Thank you for your patience and cooperation as we work to improve our infrastructure!

13/04/2026

๐‡๐ž๐ซ๐žโ€™๐ฌ ๐ฐ๐ก๐š๐ญโ€™๐ฌ ๐ญ๐š๐ค๐ข๐ง๐  ๐ฉ๐ฅ๐š๐œ๐ž ๐š๐ญ ๐€๐ง๐ฌ๐ž ๐†๐š๐ฅ๐ž๐ญ โ€” ๐š๐ง๐ ๐ฐ๐ก๐ฒ ๐ข๐ญ ๐ฆ๐š๐ญ๐ญ๐ž๐ซ๐ฌ.

This section of road crosses the Anse Galet river, and works are now underway to improve drainage through the installation of a culvert.

This is a critical upgrade to ensure the roadway can better withstand water flow and reduce the risk of flooding and damage over time.

To facilitate these works while maintaining access, a temporary bypass is being put in place, allowing traffic to continue moving through the area.

As works progress, traffic management measures will be introduced, and we ask for your patience and cooperation during this period.

These improvements are essential to delivering a safer, more resilient road.

๐Ÿ“ Anse Galet

Address

Project Management Unit, 1st Floor Kamakie Building
Castries
LC06201

Website

Alerts

Be the first to know and let us send you an email when Millennium Highway & West Coast Road Reconstruction Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share