27/08/2026
August 24-26, 2026
The OCGSO-GSM Carpentry Section proceeded with the construction of container van (roof framing), the installation of new roof gutter at Inventory Office, and installation/erection of GI Pipe for rafter.
Meanwhile, the OCGSO-GSM Physical Arrangement team conducted the collection and dispatch of 250 chairs and 15 tables at Brgy. Mabacong, 100 chairs and 10 tables at Brgy. Sto. Niño, 150 chairs at Camp Malvar, 200 chairs @ Brgy. Bolbok, 150 chairs at Xentro Mall, 30 chairs and 2 tables at CDRRMO, 6 tables at Batangas City Hall Quadrangle, 150 chairs at Batangas City Convention Center.