El Nido Rehabilitation Task Force

El Nido Rehabilitation Task Force Official page of El Nido Rehabilitation Task Force

11/09/2025
20/08/2025

๐’๐“๐€๐“๐„๐Œ๐„๐๐“ ๐Ž๐ ๐’๐„๐–๐€๐†๐„ ๐“๐‘๐„๐€๐“๐Œ๐„๐๐“ ๐๐‹๐€๐๐“ ๐‚๐Ž๐๐๐„๐‚๐“๐ˆ๐Ž๐

-๐Š๐š๐ก๐š๐ฅ๐š๐ ๐š๐ก๐š๐ง ๐ง๐  ๐Š๐จ๐ง๐ž๐ค๐ฌ๐ฒ๐จ๐ง ๐ฌ๐š ๐’๐“๐

Totoo na mahalaga ang pagkonekta ng mga establisimyento sa Sewage Treatment Plant (STP) upang matugunan ang suliranin sa wastewater ng El Nido, subalit kailangang linawin ang kasalukuyang kalagayan ng operasyon ng STP. Ang simpleng pagkonekta ng mga gusali sa STP ay hindi awtomatikong nakalulutas ng lahat ng isyu sa wastewater; kinakailangan ng maayos na operasyon, regular na maintenance, at mahusay na pamamahala sa kapasidad upang ito ay maging epektibo. Madalas ring nagkakaroon ng madalas na pagkasira at pagputok ng linya ng STP, na nagpapakita ng mga teknikal at operasyonal na hamon na dapat tugunan.

-๐๐š๐ ๐ฆ๐š๐ฆ๐š๐ฒ-๐š๐ซ๐ข, ๐๐š๐ฆ๐š๐ฆ๐š๐ก๐š๐ฅ๐š, ๐š๐ญ ๐ฆ๐ ๐š ๐‘๐ž๐ฌ๐ฉ๐จ๐ง๐ฌ๐ข๐›๐ข๐ฅ๐ข๐๐š๐

Bagamaโ€™t kapwa pag-aari ng Pamahalaang Panlalawigan ng Palawan (PGP) at ng LGU ng El Nido ang STP, ang operasyon at pamamahala nito ay eksklusibong nasa ilalim ng PGP.
Ayon sa Artikulo 1 ng Memorandum of Agreement (MOA) sa pagitan ng PGP at LGU ng El Nido, ang PGP ang inatasang mamahala at magsuperbisa sa STP, kabilang ang pagtalaga ng tauhan, paggawa ng mga alituntunin sa operasyon, at pagtitiyak na may sapat na teknikal na kakayahan ang mga tauhan para sa epektibong pamamahala. Bagamaโ€™t pinapahintulutan ng Seksyon 6 ang LGU na magtalaga ng regular na empleyado mula sa El Nido Water and Sanitation System (ENWSS) upang makatulong sa operasyon, limitado ito ng mga regulasyon ng civil service, sapagkat ang ENWSS ay itinuturing na economic enterprise.

-๐Œ๐ ๐š ๐ˆ๐ง๐ข๐ฌ๐ฒ๐š๐ญ๐ข๐›๐จ ๐ง๐  ๐‹๐†๐”

Simula 2023, aktibong nakikipag-ugnayan ang LGU-El Nido sa mga stakeholder sa pamamagitan ng mga technical conference upang maisulong at mapahusay ang koneksyon sa STP. May ilang establisimyento pa ring hindi nakakonekta dahil sa hindi pa natatapos na konstruksiyon ng mga sewer line at dahil na rin sa mga isyu sa mataas na taripa. Patuloy na nakikipag-ugnayan ang LGU sa PGP upang kanilang muling suriin ang mga singil para mas marami pang establisimyento ang makakonekta, habang sinusuportahan o sinasubsidyuhan ng LGU ang kasalukuyang taripa hanggang sa katapusan ng taon. Gayunpaman, matatapos ang subsidyang ito ngayong taon at inaasahang lalo pang tataas ang taripa pagsapit ng susunod na taon.

-๐๐ซ๐ž๐ฏ๐ž๐ง๐ญ๐ข๐ฏ๐ž ๐Œ๐š๐ข๐ง๐ญ๐ž๐ง๐š๐ง๐œ๐ž

Mahalaga ang preventive maintenance sapagkat sa pamamagitan ng regular na inspeksiyon, pagserbisyo, at agarang pagkukumpuni ay naiiwasan ang pagkasira ng planta, napapanatili ang kahusayan ng paggamot ng wastewater, natutugunan ang pagdami ng volume ng tubig, at naiiwasan ang pagbabara mula sa langis at grasa na maaaring makaapekto sa sistema.

-๐”๐ค๐จ๐ฅ ๐ฌ๐š ๐๐š๐ก๐š๐ฒ๐š๐  ๐ง๐š ๐Œ๐š๐ข๐ค๐จ๐ค๐จ๐ง๐ž๐ค๐ญ๐š ๐š๐ง๐  ๐‹๐š๐ก๐š๐ญ ๐ฌ๐š ๐‹๐จ๐จ๐› ๐ง๐  ๐ƒ๐š๐ฅ๐š๐ฐ๐š๐ง๐  ๐๐ฎ๐ฐ๐š๐ง

Tungkol sa mga pahayag na lahat ng establisimyento ay maaaring makonekta sa loob lamang ng dalawang buwan, mahalagang bigyang-diin na ang koneksyon lamang ay hindi sapat upang malutas ang mga hamon sa wastewater. Kinakailangan ng maingat na pagpaplano, pagsunod sa pamantayang teknikal, at maayos na koordinasyon sa kasalukuyang mga linya ng sewer at tubig upang maiwasan ang kontaminasyon o labis na pagkarga sa sistema. Mayroon ding mga koneksyon na hindi pa natatapos dahil sa kakulangan sa sewer line ng ilang gusali at dahil sa mga isyu sa alignmentโ€”tulad ng sa kalsada mula Metrobank hanggang sa pantalan, kung saan humiling ang LGU ng as-built plans mula sa pamunuan ng STP upang ligtas na mailipat ang mga waterline. Ang mabilisang koneksyon nang hindi isinasaalang-alang ang mga teknikal, operasyonal, at pangkaligtasang rekisito ay maaaring makasama sa kahusayan at kaligtasan ng STP.

๐‘ฉ๐’‚๐’ˆ๐’‚๐’Ž๐’‚โ€™๐’• ๐’Ž๐’‚๐’‰๐’‚๐’๐’‚๐’ˆ๐’‚ ๐’‚๐’๐’ˆ ๐’‘๐’‚๐’ˆ๐’Œ๐’๐’๐’†๐’Œ๐’•๐’‚ ๐’๐’ˆ ๐’๐’‚๐’‰๐’‚๐’• ๐’๐’ˆ ๐’†๐’”๐’•๐’‚๐’ƒ๐’๐’Š๐’”๐’Š๐’Ž๐’š๐’†๐’๐’•๐’, ๐’‰๐’Š๐’๐’…๐’Š ๐’Š๐’•๐’ ๐’”๐’‚๐’‘๐’‚๐’• ๐’–๐’‘๐’‚๐’๐’ˆ ๐’•๐’–๐’๐’–๐’š๐’‚๐’๐’ˆ ๐’Ž๐’‚๐’“๐’†๐’”๐’๐’๐’ƒ๐’‚ ๐’‚๐’๐’ˆ ๐’”๐’–๐’๐’Š๐’“๐’‚๐’๐’Š๐’ ๐’”๐’‚ ๐’˜๐’‚๐’”๐’•๐’†๐’˜๐’‚๐’•๐’†๐’“ ๐’๐’ˆ ๐‘ฌ๐’ ๐‘ต๐’Š๐’…๐’. ๐‘จ๐’๐’ˆ ๐’•๐’–๐’๐’‚๐’š ๐’๐’‚ ๐’”๐’๐’๐’–๐’”๐’š๐’๐’ ๐’‚๐’š ๐’๐’‚๐’๐’ˆ๐’‚๐’๐’ˆ๐’‚๐’Š๐’๐’‚๐’๐’ˆ๐’‚๐’ ๐’๐’ˆ ๐’Ž๐’‚๐’‚๐’š๐’๐’” ๐’๐’‚ ๐’Œ๐’๐’๐’“๐’…๐’Š๐’๐’‚๐’”๐’š๐’๐’ ๐’๐’ˆ ๐‘ท๐‘ฎ๐‘ท ๐’‚๐’• ๐‘ณ๐‘ฎ๐‘ผ, ๐’Ž๐’‚๐’•๐’‚๐’•๐’‚๐’ˆ ๐’๐’‚ ๐’‘๐’“๐’†๐’—๐’†๐’๐’•๐’Š๐’—๐’† ๐’Ž๐’‚๐’Š๐’๐’•๐’†๐’๐’‚๐’๐’„๐’†, ๐’Ž๐’‚๐’Š๐’๐’ˆ๐’‚๐’• ๐’๐’‚ ๐’‘๐’‚๐’๐’ˆ๐’‚๐’๐’ˆ๐’‚๐’”๐’Š๐’˜๐’‚, ๐’‚๐’• ๐’‚๐’Œ๐’•๐’Š๐’ƒ๐’๐’๐’ˆ ๐’‘๐’‚๐’Œ๐’Š๐’Œ๐’Š๐’‘๐’‚๐’ˆ-๐’–๐’ˆ๐’๐’‚๐’š๐’‚๐’ ๐’”๐’‚ ๐’Ž๐’ˆ๐’‚ ๐’”๐’•๐’‚๐’Œ๐’†๐’‰๐’๐’๐’…๐’†๐’“, ๐’Œ๐’‚๐’๐’‚๐’Œ๐’Š๐’‘ ๐’‚๐’๐’ˆ ๐’Ž๐’‚๐’Š๐’๐’ˆ๐’‚๐’• ๐’๐’‚ ๐’†๐’”๐’•๐’“๐’‚๐’•๐’†๐’‰๐’Š๐’š๐’‚ ๐’”๐’‚ ๐’Œ๐’๐’๐’†๐’Œ๐’”๐’š๐’๐’ ๐’‚๐’• ๐’•๐’‚๐’“๐’Š๐’‘๐’‚.

===================================================================================================

-๐ˆ๐ฆ๐ฉ๐จ๐ซ๐ญ๐š๐ง๐œ๐ž ๐จf ๐’๐“๐ ๐‚๐จ๐ง๐ง๐ž๐œ๐ญ๐ข๐จ๐ง

While it is true that connecting establishments to the Sewage Treatment Plant (STP) is important in addressing El Nidoโ€™s wastewater problem, the operational situation of the STP must also be clarified. Simply connecting buildings to the STP does not automatically solve all wastewater issues; proper operation, maintenance, and capacity management are necessary to handle wastewater effectively. It is well-known that STP lines have experienced frequent breakages and bursts, highlighting the technical and operational challenges that must be addressed.

-๐Ž๐ฐ๐ง๐ž๐ซ๐ฌ๐ก๐ข๐ฉ, ๐Œ๐š๐ง๐š๐ ๐ž๐ฆ๐ž๐ง๐ญ, ๐š๐ง๐ ๐‘๐ž๐ฌ๐ฉ๐จ๐ง๐ฌ๐ข๐›๐ข๐ฅ๐ข๐ญ๐ข๐ž๐ฌ

Although the STP is co-owned by the Provincial Government of Palawan (PGP) and the LGU of El Nido, its operation and management are solely under the PGP.
Under Article 1 of the Memorandum of Agreement (MOA) between the PGP and the LGU of El Nido, the PGP is tasked with managing and supervising the STP, including staffing, creating operational guidelines, and ensuring personnel possess the technical expertise necessary for effective management. While Section 6 allows the LGU to detail regular El Nido Water and Sanitation System (ENWSS) employees to assist operations, this is limited by civil service regulations, as ENWSS is classified as an economic enterprise.

-๐‹๐†๐” ๐ˆ๐ง๐ข๐ญ๐ข๐š๐ญ๐ข๐ฏ๐ž๐ฌ ๐’๐ข๐ง๐œ๐ž ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ‘

Since 2023, the LGU-El Nido has been actively coordinating with stakeholders through technical conferences to facilitate and improve STP connections. Some establishments remain unconnected due to pending construction of sewer lines and concerns over high tariffs. The LGU has been constantly engaging the PGP to review rates so that more stakeholders will connect, while subsidizing current rates until the end of this year. However, as said this subsidy will expire by the end of the year, and tariffs are expected to further increase starting next year.

-๐๐ซ๐ž๐ฏ๐ž๐ง๐ญ๐ข๐ฏ๐ž ๐Œ๐š๐ข๐ง๐ญ๐ž๐ง๐š๐ง๐œ๐ž

Preventive maintenance is a key factor, as regular inspections, servicing, and timely repairs prevent plant breakdowns, maintain treatment efficiency, handle increased wastewater volumes, and avoid the buildup of oil and grease that can compromise the system.

-๐Ž๐ง ๐‚๐ฅ๐š๐ข๐ฆ๐ฌ ๐จf ๐“๐ฐ๐จ-๐Œ๐จ๐ง๐ญ๐ก F๐ฎ๐ฅ๐ฅ ๐‚๐จ๐ง๐ง๐ž๐œ๐ญ๐ข๐จ๐ง

Regarding claims that all establishments can be connected within two months, it is important to note that connection alone does not resolve wastewater challenges. Proper connection requires careful planning, compliance with technical standards, and coordination with existing sewer and waterlines to avoid contamination or system overload. Some connections are also pending due to incomplete building sewer lines and alignment issues, such as along the street from Metrobank to the port, where the LGU has requested as-built plans from the STP Management to safely relocate waterlines. Rapid connection without addressing these technical, operational, and safety requirements could compromise the efficiency and safety of the STP.

๐‘พ๐’‰๐’Š๐’๐’† ๐’„๐’๐’๐’๐’†๐’„๐’•๐’Š๐’๐’ˆ ๐’‚๐’๐’ ๐’†๐’”๐’•๐’‚๐’ƒ๐’๐’Š๐’”๐’‰๐’Ž๐’†๐’๐’•๐’” ๐’Š๐’” ๐’Š๐’Ž๐’‘๐’๐’“๐’•๐’‚๐’๐’•, ๐’Š๐’• ๐’„๐’‚๐’๐’๐’๐’• ๐’‚๐’๐’๐’๐’† ๐’”๐’๐’๐’—๐’† ๐‘ฌ๐’ ๐‘ต๐’Š๐’…๐’โ€™๐’” ๐’˜๐’‚๐’”๐’•๐’†๐’˜๐’‚๐’•๐’†๐’“ ๐’‘๐’“๐’๐’ƒ๐’๐’†๐’Ž. ๐‘ฌff๐’†๐’„๐’•๐’Š๐’—๐’† ๐’“๐’†๐’”๐’๐’๐’–๐’•๐’Š๐’๐’ ๐’“๐’†๐’’๐’–๐’Š๐’“๐’†๐’” ๐’„๐’๐’๐’“๐’…๐’Š๐’๐’‚๐’•๐’†๐’… ๐’†ff๐’๐’“๐’•๐’” ๐’ƒ๐’†๐’•๐’˜๐’†๐’†๐’ ๐’•๐’‰๐’† ๐‘ท๐‘ฎ๐‘ท ๐’‚๐’๐’… ๐‘ณ๐‘ฎ๐‘ผ, ๐’“๐’๐’ƒ๐’–๐’”๐’• ๐’‘๐’“๐’†๐’—๐’†๐’๐’•๐’Š๐’—๐’† ๐’Ž๐’‚๐’Š๐’๐’•๐’†๐’๐’‚๐’๐’„๐’†, ๐’„๐’‚๐’“๐’†f๐’–๐’ ๐’๐’—๐’†๐’“๐’”๐’Š๐’ˆ๐’‰๐’•, ๐’‚๐’๐’… ๐’‚๐’„๐’•๐’Š๐’—๐’† ๐’”๐’•๐’‚๐’Œ๐’†๐’‰๐’๐’๐’…๐’†๐’“ ๐’†๐’๐’ˆ๐’‚๐’ˆ๐’†๐’Ž๐’†๐’๐’•, ๐’‚๐’๐’๐’๐’ˆ๐’”๐’Š๐’…๐’† ๐’‘๐’“๐’–๐’…๐’†๐’๐’• ๐’„๐’๐’๐’๐’†๐’„๐’•๐’Š๐’๐’ ๐’‚๐’๐’… ๐’•๐’‚๐’“๐’Šff ๐’”๐’•๐’“๐’‚๐’•๐’†๐’ˆ๐’Š๐’†๐’”.

 : Matatag ang Paninindigan ng Pamahalaang Lokal ng El Nido: WALANG EXEMPTION SA REHABILITASYON!Habang nagpapatuloy ang ...
07/08/2025

: Matatag ang Paninindigan ng Pamahalaang Lokal ng El Nido: WALANG EXEMPTION SA REHABILITASYON!

Habang nagpapatuloy ang demolisyon ng mga istrukturang nasa loob ng easement ng mga estero sa Barangay Maligaya at Buena Suerte, nakatakda ring isagawa ang kahalintulad na operasyon sa iba pang mga daluyan ng tubig sa buong bayan ng El Nido.

Nasimulan na rin ng Pamahalaang Lokal ang pagsusuri sa mga nakalap na datos bilang gabay sa susunod na hakbang ng rehabilitasyon, ang pagsasara at pag giba ng mga establisimyentong lumalabag sa mga umiiral na lokal na ordinansa at pambansang batas.

The Local Government of El Nido stands firm: Rehabilitation knows no exemptions!

As the demolition of structures within the easement of the esteros in Barangay Maligaya and Buena Suerte continues, similar operations will soon follow in other waterways throughout the municipality.

The Local Government has also begun analyzing collected data to guide the next phase of the rehabilitation. The next step will be the demolition and closure of establishments found to be non-compliant with local ordinances and national laws.

-Municipal Media Board

06/08/2025
๐’๐ข๐ญ๐ž ๐ˆ๐ง๐ฌ๐ฉ๐ž๐œ๐ญ๐ข๐จ๐ง ๐‚๐จ๐ง๐๐ฎ๐œ๐ญ๐ž๐ ๐€๐ฅ๐จ๐ง๐  ๐„๐ฌ๐ญ๐ž๐ซ๐จ ๐„๐ฅ ๐๐ข๐๐จJuly 31, 2025Yesterday afternoon, the Municipal Mayor, together with the E...
01/08/2025

๐’๐ข๐ญ๐ž ๐ˆ๐ง๐ฌ๐ฉ๐ž๐œ๐ญ๐ข๐จ๐ง ๐‚๐จ๐ง๐๐ฎ๐œ๐ญ๐ž๐ ๐€๐ฅ๐จ๐ง๐  ๐„๐ฌ๐ญ๐ž๐ซ๐จ ๐„๐ฅ ๐๐ข๐๐จ
July 31, 2025

Yesterday afternoon, the Municipal Mayor, together with the El Nido Rehabilitation Task Force, conducted a site inspection along Estero as part of the initial phase of demolition and clearing operations within the designated easement areas.

In addition to the clearing operations, the team also inspected the ongoing construction of the sewage disposal system intended to address wastewater discharge from nearby households. During the inspection, several issues and concerns were noted, which will be formally raised to the contractor for immediate action.

This activity forms part of the local governmentโ€™s continuing efforts to rehabilitate and protect El Nidoโ€™s critical waterways, ensure environmental compliance, and promote sustainable development in the municipality.

๐“๐ž๐œ๐ก๐ง๐ข๐œ๐š๐ฅ ๐‚๐จ๐ง๐Ÿ๐ž๐ซ๐ž๐ง๐œ๐ž ๐จ๐ง ๐„๐ฌ๐ญ๐ž๐ซ๐จ ๐„๐š๐ฌ๐ž๐ฆ๐ž๐ง๐ญ | ๐‰๐ฎ๐ฅ๐ฒ ๐Ÿ‘๐ŸŽ, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“As part of the El Nido Rehabilitation Program, the Rehabilitation...
31/07/2025

๐“๐ž๐œ๐ก๐ง๐ข๐œ๐š๐ฅ ๐‚๐จ๐ง๐Ÿ๐ž๐ซ๐ž๐ง๐œ๐ž ๐จ๐ง ๐„๐ฌ๐ญ๐ž๐ซ๐จ ๐„๐š๐ฌ๐ž๐ฆ๐ž๐ง๐ญ | ๐‰๐ฎ๐ฅ๐ฒ ๐Ÿ‘๐ŸŽ, ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“

As part of the El Nido Rehabilitation Program, the Rehabilitation Task Force, spearheaded by the Office of the Building Official (OBO), convened a technical conference to address the long-standing encroachment along the 1.5-meter easement of Estero El Nido.

The activity was conducted in direct response to the strong call of Senator Erwin Tulfo, who, during a recent meeting with local officials and Rehabilitation Task Force, challenged the LGU to intensify its enforcement against illegal structures built along the Estero.

Easements like Estero El Nido are more than legal boundaries, they are environmentally critical zones that allow for the natural flow of water, provide access for maintenance, reduce flood risks, and support the ecological balance of the surrounding area. However, over time, numerous unauthorized structures have encroached upon this vital space, obstructing flow, contributing to water pollution, and endangering the health and safety of nearby residents.

During the technical conference, affected individuals were invited to assess their respective areas and were briefed on the environmental and legal implications of the encroachment. In a show of civic responsibility and cooperation, many expressed their willingness to voluntarily dismantle the structures that exceeded the easement limits.

The Municipal Government of El Nido will closely monitor the progress of demolition activities through consistent site inspections and will provide necessary assistance to ensure the safe and orderly removal of encroaching structures. Once the easement is fully cleared, the LGU will implement a fencing project along Estero El Nido to protect the easement, prevent future encroachments, and maintain public access.

31/07/2025
"July 24, 2025| Puerto Princesa CityEl Nido Rehabilitation Task Force (ENRTF) Meets with Senator Erwin Tulfo to Address ...
25/07/2025

"July 24, 2025| Puerto Princesa City

El Nido Rehabilitation Task Force (ENRTF) Meets with Senator Erwin Tulfo to Address Environmental and Rehabilitation Issues

Municipal Mayor Edna G Lim together with SB Dang Trinidad, DILG MLGOO Melissa Magbanua, OIC Municipal Administrator Raul Maximo, Acting Municipal Tourism Officer Shirlette Somayo, MEEDO Rene U Acosta, Engr. Ronnie Alcantara, Engr Junie Bacolot, Engr. Eduardo Orquista and Justine Caroline Guzman attended a strategic meeting with Senator Erwin Tulfo to tackle urgent environmental challenges and discuss sustainable rehabilitation efforts for our Municipality.

During the meeting, local officials presented pressing concerns, including:
โœ… Water pollution and sewerage issues
โœ… Solid waste management
โœ… Potable Water System
โœ… Health and Sanitation issues

Senator Tulfo expressed strong support for the protection and rehabilitation of El Nido and assured the LGU of his commitment to help address these concerns through national government assistance and legislative action.

๐Ÿ“ As a concrete next step, Senator Tulfo directed the Municipality of El Nido to submit project proposals focused on environmental protection, infrastructure improvement, and sustainable development. These proposals will be used to identify areas where his office can provide funding support or endorse to relevant national agencies.

Mayor Lim welcomed this opportunity and committed to submitting project proposals aligned with the LGUโ€™s rehabilitation goals."

18/07/2025

๐„๐‹ ๐๐ˆ๐ƒ๐Ž ๐„๐Œ๐„๐‘๐†๐„๐๐‚๐˜ ๐‡๐Ž๐“๐‹๐ˆ๐๐„๐’

MUNICIPAL TOURISM OFFICE- 0919 002 1339
RESCUE 168- 0953 972 6741
MUNICIPAL HEALTH OFFICE-0998 569 4813
PHILIPPINE NATIONAL POLICE-EL NIDO-0998 598 5864
PHILIPPINE COASTGUARD-EL NIDO-0906 449 4802
MUNICIPAL DISASTER RISK REDUCTION MANAGEMENT OFFICE-0975 678 9599
BUREAU OF FIRE PROTECTION-EL NIDO-0919 541 3371
EL NIDO COMMUNITY HOSPITAL-0915 837 4260
PALAWAN RESCUE EL NIDO- 0907 260 9959

17/07/2025

Address

Maligaya
El Nido
5313

Website

Alerts

Be the first to know and let us send you an email when El Nido Rehabilitation Task Force posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share