Municipal Engineering Office - Manay

Municipal Engineering Office - Manay The Official page of the Municipal Engineering Office of the Local Government Unit of Manay, Davao Oriental.

Road clearing operation at Paradahan, Brgy. San Isidro.
20/02/2026

Road clearing operation at Paradahan, Brgy. San Isidro.

20/02/2026
Road clearing operation in Culibao - Butayan, Barangay Central after the heavy rainfall.
20/02/2026

Road clearing operation in Culibao - Butayan, Barangay Central after the heavy rainfall.

UPDATE: Road cleared in Haguimit, Barangay Central
20/02/2026

UPDATE: Road cleared in Haguimit, Barangay Central

20/02/2026

πŸ“’πŸ“’πŸ“’

The Municipal Engineering Office informs all concessionaires of the Manay Waterworks System that due to the recent shear line and continuous heavy rainfall, flooding has caused damage to the water pipelines connected to both Magsuhi Source 1 and Magsuhi Source 2, particularly the sections traversing the Manay River.

Because of this damage, normal water supply distribution has been disrupted.

At present, Engineering personnel are unable to conduct repair works due to ongoing flooding, which pose safety risks and prevent access to the damaged pipeline sections. Repair operations will commence immediately once floodwaters subside and conditions are deemed safe for personnel and equipment.

We ask for your patience and understanding as we work to restore normal water service at the soonest possible time.

πŸ”ˆπŸ”ˆπŸ”ˆErratum: JANUARY 12, 2026
09/01/2026

πŸ”ˆπŸ”ˆπŸ”ˆ
Erratum: JANUARY 12, 2026

05/01/2026

Alang sa kasayuran sa tanan, ang Local Government Unit of Manay magpa-tuman ug Business One-Stop-Shop 2026 para sa mas epektibo ug mas dali ang pagkuha ug Business Permit ug Occupational or Working Permit. Kini nga program magsugod January 5 hangtud January 20, 2026 didto sa Manay Municipal Gymnasium.

πŒπ€ππ€π˜ ππ€π˜π–π€π‹πŠ 𝐔𝐏𝐃𝐀𝐓𝐄:The road along Manay Baywalk is now passable as the fallen posts that were blocking the road earlie...
19/11/2025

πŒπ€ππ€π˜ ππ€π˜π–π€π‹πŠ 𝐔𝐏𝐃𝐀𝐓𝐄:

The road along Manay Baywalk is now passable as the fallen posts that were blocking the road earlier had already been cleared. The public is still urged to pass with caution as clearing of the Baywalk area is still ongoing.

⚠️ ππ”ππ‹πˆπ‚ π€πƒπ•πˆπ’πŽπ‘π˜:The PUBLIC is advised to refrain from going near the Baywalk Stage, which has been damaged due to str...
19/11/2025

⚠️ ππ”ππ‹πˆπ‚ π€πƒπ•πˆπ’πŽπ‘π˜:

The PUBLIC is advised to refrain from going near the Baywalk Stage, which has been damaged due to strong winds today. For everyone’s safety, please keep a safe distance from the affected section. Also, the road along Purok 9 (infront of Manay Baywalk) is temporarily CLOSED for vehicles until the area is cleared.

The Municipal Engineering Office, together with the Provincial Engineering Office, will be assessing the damage and securing the area to prevent any accidents and for the possible repair/rehabilitation. 🚧

Stay safe Manayans!

⚠️ PUBLIC ADVISORY:Please be advised that certain portions of the road along Culibao, Crossing Buawan, and Sitio Butayan...
15/11/2025

⚠️ PUBLIC ADVISORY:

Please be advised that certain portions of the road along Culibao, Crossing Buawan, and Sitio Butayan are DAMAGED, triggered by the effect of the doublet earthquake last October. The public are urged to stay alert, take extra caution, and slow down/reduce speed while passing through the area. 🚧

Address

Manay, Davao Oriental
Manay
8202

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Municipal Engineering Office - Manay posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Municipal Engineering Office - Manay:

Share