23/10/2025
The second batch of school building assessments was conducted to ensure the continued safety and structural stability of school facilities after the recent earthquake. This activity, carried out by DPWH personnel from various provinces, is a vital part of the comprehensive post-earthquake inspection to verify the integrity of all school buildings. The batch assessment is important as it allows a systematic and thorough evaluation of multiple schools, ensuring that no structure is overlooked and that students and personnel remain safe in their learning environment. Findings from this assessment will guide necessary repairs, retrofitting, or reinforcement measures to maintain compliance with DPWH and DepEd safety standards.
Jun Busilaoco