514th Engineer Construction "Ang Gumagawa" Battalion

514th Engineer Construction "Ang Gumagawa" Battalion Official page of the 514th Engineer Construction (Ang Gumagawa) Battalion, 51st Engineer Brigade Philippine Army

This page provides important information about the 514 Engineer Construction Battalion and Regional Task Force to End Local Communist Armed Conflict (RTF-ELCAC) member agencies' activities and interventions in ensuring that peace and development in achieved in Region IV-A CALABARZON and MIMARO.

29/12/2023

QUOTE OF THE DAY

“If you want something you have never had, you must be willing to do something you have never done.”

— Thomas Jefferson, Third US President

Photo from the Office of the Army Chief Public Affairs






21/12/2023

Honoring 88 years of unwavering dedication and service: The Armed Forces of the Philippines, guardians of our nation's dreams, rising with courage, honor, and a love that knows no bounds. 🇵🇭🎉

20/12/2023
11/12/2023

The 514th Engineer Construction “Ang Gumagawa” Battalion, 51st Engineer Brigade, Philippine Army conducted a Year-end Fun Shoot together with the Battalion’s Multi-Sector Advisory Board on 09 December 2023 at 514ECB Firing Range, Campo Palico, Brgy Bilaran, Nasugbu, Batangas in connection with the upcoming Christmas Thanksgiving Celebration of the unit.

The event was organized and facilitated by 514ECB personnel and MSAB members. A total of 48 shooters participated; composed by some of unit’s personnel, Batangas West Pistoleros Incorporation and other neighboring MUPs and civilians invited. The competition consisted of five (5) divisions: Optics (carry/production optics, limited/standard optics, open/unlimited/race gun), Production, Single stack, Standard and PCC with four (4) categories: Lawman, Lady, Seniors and Regular shooter.

A combination of speed, power, and accuracy led to the competitors' victory at the end of the competition. Recreational shooting can be a useful tool for improving shooting abilities. The goal is to help someone have fun while honing and testing their shooting skills in a safe atmosphere.

LTC MARLOU P PACLIBAR, Commanding Officer, 514ECB, expressed gratitude to the personnel, MSAB Members, and other civilian stakeholders who made the event possible and successful.





The 514th Engineer Construction ang Gumagawa” Battalion, 51st Engineer Brigade, Philippine Army joins the nation in the ...
06/12/2023

The 514th Engineer Construction ang Gumagawa” Battalion, 51st Engineer Brigade, Philippine Army joins the nation in the celebration of National Human Rights Consciousness Week 2023 with the theme: “Dignidad, Kalayaan, at Katarungan para sa Lahat from 04 – 10 December 2023.

Men and Women of the unit participated in Simultaneous Flag Raising Ceremony and mass recitation of Panata sa Karapatang Pantao and reading of the CSAFP’s Message led by LTC JONATHAN B ESNARA, Battalion Executive and HR Officer.

Subsequent to the commemorated activity is the introduction of newly assigned officer, 1LT JHUNE M BUNAO (CE) PA and pinning of rank to the newly promoted enlisted personnel of the unit namely TSg Stephen C Lira (CE) PA, Sgt Ronaldo D Razal (OS) PA, Sgt Michael Rey R Morano (QMS) PA, Sgt Nikki Joy L Fortajada (Inf) PA, and Cpl Genesis D Vargas (Inf) PA.

LTC ESNARA welcomed and congratulated the newly assigned officer and newly promoted enlisted personnel alongside his guidance to keep on doing our job in the best way we can, for as our ranks go high the responsibilities go along with it as well.





IN PHOTOS| The 514th Engineer Construction “Ang Gumagawa” Battalion, 51st Engineer Brigade, Philippine Army participated...
04/12/2023

IN PHOTOS| The 514th Engineer Construction “Ang Gumagawa” Battalion, 51st Engineer Brigade, Philippine Army participated the Inauguration of Division Administrative Coordinating Center (DACC) Modular Facilities with LTGEN ROY M GALIDO PA, Commanding General, Philippine Army as Guest of Honor and Speaker.

By all means move mountains, “Ang Gumagawa” Battalion headed by LTC MARLOU P PACLIBAR CE (GSC) PA spearheaded the construction of eleven (11) sets of modular facilities interconnected with 260 meters pathway, solar powered water refilling and laundry station, completed cistern tank for the water supply which was already connected to Manila Waters, emplaced drainage system, and prepared septic tank for the 3 sets of modular comfort rooms. The 51st Engineer Brigade, Philippine Army with 514ECB as its implementing unit was given a tall order to accomplish the said project on 29 August 2023 and was inaugurated at Headquarters Philippine Army, Fort Andres Bonifacio, Taguig City on 01 December 2023.

The unwavering personnel of the unit worked despite the heat and rain during the construction of the inaugurated project. Eleven (11) units of modular facilities were partially hand-over to the end user with committed reassurance to deliver the remaining works with the same determination and urgency. LTC PACLIBAR quoted “sa una mukhang impossible pero kaya pala” which showed exemplary commitment of the unit to accomplish arduous orders regardless of shortness of time provided to deliver the outstanding result to the Armed Forces of the Philippines.





Address

Sitio Palico , Barangay Bilaran, Batangas
Nasugbu
4231

Telephone

+639171425319

Website

Alerts

Be the first to know and let us send you an email when 514th Engineer Construction "Ang Gumagawa" Battalion posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to 514th Engineer Construction "Ang Gumagawa" Battalion:

Share