04/09/2026
๐ฎ ๐๐๐๐๐๐๐๐, ๐๐๐๐๐๐๐๐๐๐๐, ๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐
๐ ๐๐๐ญ๐ & ๐๐ข๐ฆ๐: 04 September 2026, 11:46AM
๐ง ๐๐ฎ๐ฆ๐๐๐ซ ๐จ๐ ๐๐ฌ๐๐๐ฅ๐๐ญ๐จ๐ซ๐ฌ ๐๐ง๐๐๐ซ ๐๐๐ข๐ง๐ญ๐๐ง๐๐ง๐๐: 11/76
๐๐๐๐๐-๐๐ ๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐
-Concourse Level to Platform 2 (Esc #1: Ongoing Assessment of the Unit, Temporary Shutdown due ton wet Handrail caused by heavy rain)
๐๐๐๐๐๐๐ ๐๐๐๐๐๐-๐๐๐๐๐ ๐๐๐๐๐๐๐
-Platform2 to Concourse Level (Esc. #1 Out of service, ongoing assessment of the unit; TDR: Within the day)
-Concourse Level to Platform 2 (,Esc. #2 Out of service, ongoing assessment of the unit; TDR: Within the day)
-Gateway Transfer Level to Concourse Level (Esc. #13 Out of service, ongoing assessment of the unit; TDR: Within the day)
๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐
Ground Level to Concourse Level (Esc. #3 Ongoing assessment and repair of unit, for checking of electrical wirings. TDR: September 05, 2026)
๐๐๐๐๐๐๐๐-๐๐๐๐๐ ๐๐๐๐๐๐๐ (2)
-Ground Level to Concourse Level (Esc #5: Defective Pressure Roller & Tension Roller; TDR: September 22, 2026)
-Platform 2 to Concourse Level (Esc #3: Defective Handrail; TDR: September 25, 2026)
-Platformn1 to Concourse Level (Esc. #4 Ongoing assessmment and repair of unit. TDR: September 25, 2027)
-Ground Level to Concourse Level (Esc. #6 Ongoing assessment of the unit, temporary shutdown due to wet handrail caused by heavy rain. TDR: Within the day)
๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐
-Second Level to Ground Level (Esc #8: Out of service due to defective handrail; TDR: September 29, 2026)
-Concourse Level to Second Level ( Esc #5: Ongoing assessment and repair of unit. TDR: Within the day
๐ก๐๐ฎ๐ฆ๐๐๐ซ ๐จ๐ ๐๐ฅ๐๐ฏa๐ญ๐จ๐ซ๐ฌ ๐๐ง๐๐๐ซ ๐๐๐ข๐ง๐ญ๐๐ง๐๐ง๐๐: 1/40
๐๐๐๐๐-๐๐ ๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐
-Elev. C, Concourse Level to Platform 2 Westbound (Ongoing assessment of the unit. Temporary shutdown due to water leak)
๐ต๐๐จ๐ง-๐จ๐ฉ๐๐ซ๐๐ญ๐ข๐จ๐ง๐๐ฅ ๐๐ข๐๐ค๐๐ญ ๐๐๐ง๐๐ข๐ง๐ ๐๐๐๐ก๐ข๐ง๐๐ฌ (๐๐๐๐ฌ): 0/100
๐ต๐๐๐๐/๐๐๐ ๐๐จ๐ฆ๐๐จ๐ซ๐ญ ๐๐จ๐จ๐ฆ๐ฌ ๐๐ง๐๐๐ซ ๐๐๐ข๐ง๐ญ๐๐ง๐๐ง๐๐: 0/57
๐ฉ ๐๐๐๐๐ฌ๐ฌ๐ข๐๐ฅ๐ ๐๐๐ฆ๐ฉ๐ฌ ๐๐ง๐๐๐ซ ๐๐๐ฉ๐๐ข๐ซ: 0/17
๐ต๐ญ