29/09/2026
PAUNAWA
Ano: PELCO II Scheduled Power Interruption
Kailan: Oktubre 1, 2026 (Huwebes)
Oras: Pagitan ng 7:00 ng umaga hanggang 4:00 ng hapon (mga 9 na oras)
Mga Apektadong Lugar:
ILANG BAHAGI NG PORAC:
Barangays: Babo Pangulo, Sepung Bulaon (Sitio Baidbid), Babo Sacan, Cangatba, Diaz, Hacienda Dolores, Inararo, Jalung, Palat, Pio (Block 7), Poblacion, Sapang Uwak, Villa Maria, Mitla Proper, San Jose Mitla, Pias at Pulung Santol
ILANG BAHAGI NG BACOLOR:
Barangay Maliwalu (Sitio Bancal)
ILANG BAHAGI NG STA. RITA:
Barangays: Dila-Dila (Zone 1, 2, 3, 4, 5 at ilang bahagi ng Zone 6 malapit sa Tonette Residence at Zone 7 Pipitik) at Becuran (mula Razon hanggang sa Dila-Dila)
Dahilan:
• Uprating of existing three phase line to 336.4 MCM Pio Substation to Hacienda Dolores, Porac
• Rehabilitation and Uprating of 4.1 km, 1 – 336.4 MCM ACSR Three Phase Primary Line from Babo Sacan to Pulung Santol
• O&M works/Clearing of lines
Para sa kaalaman ng lahat.