Manila Water

Manila Water The official page of Manila Water Company, Inc. Salamat sa inyong pagsali sa aming page. Let’s keep the discussion positive, walang personalan.

For water service queries, call Customer Service Hotline 1627 or send us a Private Message on Messenger. Dito sa Manila Water, nagsusumikap kaming mabigyan kayo ng serbisyong tapat at maaasahan. Para maganda ang maging usapan natin, basahing mabuti ang mga guidelines bago mag-post. Galangin ang opinyon ng iba kahit hindi ka sang-ayon. Ipinagbabawal namin ang anumang name calling, profanity, foul l

anguage, discrimination, sexual harassment, o bullying. Siguraduhin na ang pag-uusap ay may katuturan at nakatutulong sa overall discussion. Dapat focused tayo sa current subject matter. Maaaring tanggalin ang mga posts na off-topic, out-of-context, spam, o promotional. Magpakatotoo tayong lahat. Kapag natuklasang peke o anonymous ang Facebook profile niyo, maaring tanggalin ang inyong mga pinost. Maaring alisin ang anumang naka-post na lumalabag sa mga guidelines dito.

PUBLIC ADVISORYEast Bay Water Supply System Existing Transmission Lines Flushing & Disinfection ActivitySeptember 01– 05...
02/09/2026

PUBLIC ADVISORY
East Bay Water Supply System Existing Transmission Lines Flushing & Disinfection Activity

September 01– 05, 2026

Manila Water will conduct flushing and disinfection activity from September 01 to 05, 2026 of our existing East Bay Water Supply System Transmission Lines.

Pipeline flushing is a standard procedure that removes sediments and residual materials from newly installed pipelines to help ensure clean, safe, and reliable water service before the facility becomes fully operational.

Discharge Locations and Flushing Schedule:
1. Along National Rd near Bayugo Elem School (Creek), Brgy. Bayugo Jala-Jala – September 1-2, 2026/ 8 pm to 4 am

2. Along National Rd Brgy. Punta near Palay Palay Arko (Creek), Jala-Jala – September 2-3, 2026/ 8 pm to 4 am

3. Along National Rd. near Pagkalinawan Rd. Brgy. Palaypalay (Creek), Jala-Jala – September 3-4, 2026/ 8 pm to 8 pm

4. Along Mabitac Rd. fronting Eastbay Treatment Plant Brgy. Kabulusan, Pakil Laguna – September 4-5, 2026/ 8 pm to 11 pm

The activity supports Manila Water's efforts to strengthen water security and maintain a reliable water supply, especially during periods of increased demand and El Niño conditions. It will be undertaken in compliance with applicable regulatory requirements.

Thank you for your understanding and cooperation.

Hotline: 1627

Manila Water continues to expand its water distribution network to bring 24/7 water service to more customers across the...
02/09/2026

Manila Water continues to expand its water distribution network to bring 24/7 water service to more customers across the East Zone of Metro Manila and Rizal. As of July, the company's network spans 5,738.06 kilometers of pipelines, supporting the delivery of safe and reliable water to millions of customers in its service area.

LINK IN COMMENTS

WATER SECURITY IS OUR PRIORITY   as of September 2, 2026, 6:00 AMAngat Dam: 201.84 mIpo Dam: 100.58 mLa Mesa Dam: 79.31 ...
02/09/2026

WATER SECURITY IS OUR PRIORITY

as of September 2, 2026, 6:00 AM

Angat Dam: 201.84 m
Ipo Dam: 100.58 m
La Mesa Dam: 79.31 m
Upper Wawa Dam: 135.29 m

Ang wasto at responsableng paggamit ng tubig ay hindi lamang kapag kapos na tayo rito, kundi habang sapat pa ang suplay nito.

Sama-sama nating pagtibayin ang kamalayan at pagkilos tungo sa mas matatag na suplay ng tubig para sa lahat.

today for a tomorrow!

Balara Water Treatment Plant 1: A Legacy of Water Security Since 1935For over 90 years, Balara WTP 1 has played a key ro...
02/09/2026

Balara Water Treatment Plant 1: A Legacy of Water Security Since 1935

For over 90 years, Balara WTP 1 has played a key role in delivering safe and reliable water to millions of customers in the East Zone. With a treatment capacity of up to 470 million liters per day, the facility continues to support communities through generations.

Known for its iconic Art Deco architecture and rich history, Balara WTP 1 stands as a testament to the enduring value of investing in water infrastructure that serves both present and future needs.

Together, let's strengthen water resilience today for a future!

SERVICE ADVISORY - CAINTA: EMERGENCY leak repair at Gladiola St., Greenwoods Executive Village, Brgy. San Andres, Cainta...
01/09/2026

SERVICE ADVISORY - CAINTA: EMERGENCY leak repair at Gladiola St., Greenwoods Executive Village, Brgy. San Andres, Cainta, Rizal, from 10:00 PM of September 1, 2026 to 4:00 AM of September 2, 2026, causing temporary water interruption in Greenwoods Executive Village.

Manila Water Foundation (MWF), together with Manila Water Company’s East Zone and Non-East Zone operating units, activat...
01/09/2026

Manila Water Foundation (MWF), together with Manila Water Company’s East Zone and Non-East Zone operating units, activated its Agapay: WASH in Emergencies program to address the urgent water, sanitation, and hygiene (WASH) needs of communities affected by flooding brought about by the southwest monsoon or habagat.

LINK IN COMMENTS

SERVICE ADVISORY: Emergency repair and maintenance activities scheduled on September 2-9, 2026 affecting parts of Taguig...
01/09/2026

SERVICE ADVISORY: Emergency repair and maintenance activities scheduled on September 2-9, 2026 affecting parts of Taguig, Makati, Quezon City, Marikina & Cainta, Rizal.

See full list: bit.ly/MWAdvisory

Manila Water is being regulated and monitored by MWSS Regulatory Office

SERVICE ADVISORY: Emergency repair and maintenance activities scheduled TONIGHT, September 1, 2026 affecting parts of Ta...
01/09/2026

SERVICE ADVISORY: Emergency repair and maintenance activities scheduled TONIGHT, September 1, 2026 affecting parts of Taguig, Manila, Quezon City, Marikina, Taytay & Antipolo, Rizal.

See full list: bit.ly/MWAdvisory

Manila Water is being regulated and monitored by MWSS Regulatory Office

PROJECT ADVISORY: Refilling Line of Maguey Reservoir from Calawis Treatment PlantThe ongoing project is conducted along ...
01/09/2026

PROJECT ADVISORY: Refilling Line of Maguey Reservoir from Calawis Treatment Plant

The ongoing project is conducted along C. Lawis Extension (from Queenstown Heights 1 to Natalia Ave.) and along Kaysipot Road to Marcos Highway and may affect the vehicular traffic until October 29, 2026.

We seek your understanding and support in the implementation of this project.

Information, Education and Communication (IEC) Campaign on Sanitation in Baras, Rizal to further understand the benefits...
01/09/2026

Information, Education and Communication (IEC) Campaign on Sanitation in Baras, Rizal to further understand the benefits of desludging and the importance of wastewater treatment to the environment.

Manila Water believes that clean water and proper sanitation are not just services, they are basic rights and essential needs of every Filipino family.

Address

489 Katipunan Avenue
Quezon City
1105

Alerts

Be the first to know and let us send you an email when Manila Water posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Manila Water:

Shortcuts

Share