08/26/2026
Update 8/26/26: In the last 24 hours, the lake has gone down less than half a foot. The U.S. Army Corps of Engineers was able to increase the release from 1000 to 2000 cubic feet per second today, so the next 24 hours will lower more quickly. It will still take several days to release 17 feet of extra water. Pirates Cove Marina is open and renting non-motorized watercraft, but no powered boats due to debris in the lake. DNR staff are visiting boat ramps twice a day. Breeze direction determines which ramps fill with floating debris at any given time, but Lost Bridge West and Lost Bridge East Ramps are open as of 2 p.m. All campground reservations on sites 222 through 246 are being automatically cancelled and fully refunded through the night of August 31st, but all other campsites are open. The horse trails and parts of some other trails remain underwater. https://on.IN.gov/salamonielake