07/22/2026
Our comment section has been busy this month — and the conversations are as good as the articles. 🛝
📌 A wall still standing after 25 years. One of BOLDR's earliest customers wrote in: the climbing wall they installed in their township park around 2001 is still in use and in good shape — but the signs have faded. We answered with what to do when the original manufacturer is no longer in business: reproducing signage from ASTM guidelines, sourcing compatible handholds and hardware, and getting a CPSI evaluation.
👉 https://bit.ly/4fu9pM3
📌 A reader summed up playground construction better than we did. On Tim McNamara's build guide, a commenter nailed it — the projects that run smoothly are the ones where the budget, the preconstruction meeting, and a realistic timeline are locked down before anyone breaks ground. Equipment lead times, utility locates, and weather delays are where schedules go to die.
👉 https://bit.ly/4vP6cwJ
📌 From the archive: a 10-acre park build in Port Orange, Florida. Impact-fee funded, ADA-accessible, 10 inches of wood chip surfacing. A reader's take: "I love to see local councils make an effort" — agreed.
👉 https://bit.ly/4waqqC2
playgroundprofessionals
Got a question about a playground you own, build, or maintain? Drop it in the comments. We read every one — and we answer.