07/15/2026
Starting Wednesday, July 15, at 10 p.m., traffic will shift on the southbound I-35 frontage road just north of Riverside Drive as reconstruction begins on the Riverside Drive bridge over I-35.
During construction, a temporary traffic signal will provide access to eastbound and westbound Riverside Drive, while two lanes in each direction will remain open on the bridge. Drivers continuing south on the frontage road will use the Riverside Drive bypass lane, and pedestrian access will remain available along the south side of Riverside Drive via the signalized crosswalk at Edgecliff Terrace.
These traffic changes are expected to remain in place through 2029, with work on Riverside Drive shifting next year. If you travel through the area regularly, plan ahead and allow for extra travel time.