FINISHED DIRT IS THE PRODUCT.
That explanation actually helps.
Because if finished dirt is the PRODUCT, then what arrives at Balsam is not finished dirt.
The process, in plain English:
Soil is hydro-excavated.
It becomes slurry.
The slurry is transported to Balsam.
It is received and stored.
Water and solids separate.
It dries and/or is dewatered.
The material may be screened or otherwise processed.
Eventually, usable soil or fill leaves the site.
EGLE calls Balsam a Liquid Industrial By-Product Designated Facility and identifies receipt, storage, drying, dewatering, screening/testing, reuse and disposal as parts of that pathway.
Carrollton Township’s M-1 ordinance refers to processing or treatment of products from “previously prepared materials.”
So at what point did the incoming slurry become “previously prepared”?
If the finished dirt doesn’t exist until AFTER the processing at Balsam, that seems like a pretty reasonable zoning question.