09/01/2026
The City Manager has declared the City of Keene to be in Stage 1 of its Drought Contingency Plan, effective immediately and until further notice. Johnson County Special Utility District (JCSUD) has enacted its Drought Contingency Plan, which requires the City of Keene to enact its own plan in accordance with City Ordinance No. 2025-684.
Under Stage 1 of the plan, non-essential water usage is prohibited, including hosing sidewalks, driveways, patios, buildings, and other paved areas and structures for purposes other than fire prevention or surface preparation prior to painting.
To read the full Stage 1 Drought Contingency Plan and guidelines and view the yard watering schedule, visit our website at: https://www.keenetx.com/m/NewsFlash/home/detail/245