09/04/2026
Please be advised that we are scheduled to apply Liquid Road to Jefferson Street, between Fifth Street and North Street, on Wednesday, September 9th, and Thursday, September 10th, from 7:30 AM to 7:00 PM daily.
The work schedule will be as follows:
- Wednesday, September 9th: Northbound lane
- Thursday, September 10th: Southbound lane
Each lane will receive one coat in the morning and a second coat in the afternoon once the first is dry. There will be no access to driveways or the specific traffic lane being treated during this entire process.
Residents of N Jefferson Street: Please plan to park across the street or in another location. Do not block the open traffic lane under any circumstances. In the event of rain, the project schedule will be delayed by one day.
About the Products Being Used:
- Liquid Road: Mixed with specially graded aggregate and applied to the road surface to create a highly durable, slip-resistant finish that extends pavement service life.
- Polymer-Modified Masterseal (PMM): Replenishes the binder lost through weathering and aging, providing a protective barrier against moisture intrusion, ultraviolet rays, chemicals, and salt.
Thank you for your cooperation and patience.