06/23/2026
At 11:19am Station 53 with Tower 53 were dispatched with other mutual aid units to assist Station 46 with a reported Commercial Structure Fire.
Numerous calls were received reporting black smoke coming from the building. Chief 46 could see a large column of smoke coming from the area and called immediately for the 2nd alarm.
Deputy 53 arrived just behind the first arriving apparatus and completed a 360 survey of the structure to assist the incident commander. He noted significant fire from the rear (“C” side) of the building with significant fire spread along with fire from multiple 53’ trailers. He was assigned as the “C” side supervisor by incident command.
Tower 53 arrived shortly after as the 1st due truck company and were assigned to the “B” “C” corner and to setup for master stream operations. Shortly after a 3rd alarm was struck.
Crews operated for multiple hours in what would eventually become a 4 alarm response. Additionally, Pipeline 53 was dispatched as part of the LDH task force and pumped water into the scene from Trooper Road and Clarkhill Drive in Lower Providence.
Lower Providence units were released shortly after 5pm and replaced with additional units for overnight operations.
Thankfully, there were no injuries reported at this large incident.
Photo Credit: Engineer Evans and FF Salamone, and Chopper 10.