08/25/2026
Road Construction Reminder
π§ Road Construction continues along Hwy 6 from Broadway / Spur 15A east through town. π§
β οΈHighway 6 is currently designated one-lane and traffic is being directed by a pilot car and a temporary traffic light stationed at either end of construction. Expect wait times.
πPlease follow all signage on the side roads and business parking lots entering Highway 6, which advise to "Wait for Pilot Car". DO NOT PROCEED until the pilot car passes in the direction you need to go, as you may be driving directly towards the oncoming traffic.
Thank you for your caution and patience when navigating construction zones.
IPD