08/12/2026
25 volunteers kept the momentum going on Saturday, making great progress across all three of our homes.
At Cazbi's house, volunteers prepared the front sidewalk for this week's concrete pour, installed kitchen cabinets, light fixtures and fans, tiled the bathroom floor, cleaned the floors in preparation for new flooring, and finished installing and caulking the window sills.
Jessica's house also saw plenty of progress. A huge thank you to Buffalo Roofing for shingling the roof during the week! Volunteers finished installing the blueboard, installed the Tyvek covering, taped the seams, prepared the window openings, installed roof venting, added hurricane clips in the safe room, framed several closets, and reinforced the front porch.
Work began on Nery's future home. Thanks to Cudaback Construction for digging the foundation and installing the plumbing runs, giving us a great start. Volunteers also continued preparing sidewalks in front of the new home.