South Fork Kings GSA South Fork Kings Groundwater Sustainability Agency was created in reponse to SGMA enacted in 2014

Answer: No, meters capable of remote data collection and transmission are not currently required, but they are strongly ...
09/04/2026

Answer: No, meters capable of remote data collection and transmission are not currently required, but they are strongly recommended. The policy notes that remote monitoring capability may be required in the future.

Answer: The meter requirements apply to owners of non-domestic groundwater production wells that pump more than 2 acre-f...
09/01/2026

Answer: The meter requirements apply to owners of non-domestic groundwater production wells that pump more than 2 acre-feet per year.

Have questions? Visit our website!
08/28/2026

Have questions? Visit our website!

Answer: The well owner is responsible for all costs associated with purchasing, installing, operating, maintaining, test...
08/25/2026

Answer: The well owner is responsible for all costs associated with purchasing, installing, operating, maintaining, testing, calibrating, and replacing the meters. The owner is also responsible for
recordkeeping and providing access to the SFK GSA. These obligations remain unless the SFK GSA establishes a funding, rebate, or cost-sharing program in the future.

Answer: Your pumping zone (A, B, or C) is determined by the depth of your well's screened interval (or perforations) com...
08/21/2026

Answer: Your pumping zone (A, B, or C) is determined by the depth of your well's screened interval (or perforations) compared to the depth of the Corcoran Clay layer beneath your property. To find your well's screened interval, you will need to review your Well Completion Report (WCR), which is sometimes referred to as a driller's log.

Answer: Meters must be registered in the SFK GSA data management system (DMS), currently known as Watermark. Beginning O...
08/18/2026

Answer: Meters must be registered in the SFK GSA data management system (DMS), currently known as Watermark. Beginning October 1, 2026, well owners must submit meter totalizer
volumes monthly, no later than the fifteenth day of the following month, using the Watermark system.

08/14/2026
Have questions? Join us!
08/13/2026

Have questions? Join us!

These are credits generated through water banking, recharge projects, or other approved projects that mitigate undesirab...
07/31/2026

These are credits generated through water banking, recharge projects, or other approved projects that mitigate undesirable results in the SFK GSA. To protect the Subbasin, a designated percentage of the recharged water is "left behind" and will not be credited to your account.

If your parcel receives a sustainable yield allocation but you do not irrigate that acreage, you can transfer that alloc...
07/28/2026

If your parcel receives a sustainable yield allocation but you do not irrigate that acreage, you can transfer that allocation to other actively irrigated parcels within the SFK GSA. Furthermore, if you present appropriate documentation to the GSA that a property is fallow, the evapotranspiration values for that parcel will be set to zero.

Address

321 C Street
Lemoore, CA
93245

Alerts

Be the first to know and let us send you an email when South Fork Kings GSA posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to South Fork Kings GSA:

Shortcuts

Share