Borough of Lewistown

Borough of Lewistown Administrative offices for the Borough of Lewistown. Includes Sewer, Refuse, & Codes.

Located on first floor:
Refuse & Sewer Office: 248-1331
Zoning & Code Enforcement Office: 242-1145
Tax Collection Office: 248-8607
Administrative Office: 248-1361

FOR IMMEDIATE RELEASEAugust 28, 2026MEDIA CONTACTS: Timothy Nebgen, tnebgen@pa.gov or 814-765-0598Steve Harmic, sharmic@...
08/31/2026

FOR IMMEDIATE RELEASE
August 28, 2026

MEDIA CONTACTS: Timothy Nebgen, [email protected] or 814-765-0598
Steve Harmic, [email protected] or 814-496-6189

PennDOT Mifflin County Maintenance Work Schedule for the Week of August 31

Clearfield, PA – The Pennsylvania Department of Transportation (PennDOT) announced the following schedule of maintenance activities in Mifflin County the week of August 31. PennDOT performs year-round maintenance in its mission to provide a safe, efficient transportation system, and the scope of work in Mifflin County for the coming week is as follows:

Bridge Maintenance & Cleaning

• Route 22 between the Route 22 Business exit in Granville Township and the Route 322 interchange in Derry Township. Tuesday, September 1, through Friday, September 4. PennDOT will implement single-lane closures while this work is completed.
• Route 322 at a bridge spanning Laurel Creek in Armagh Township. Monday, August 31. PennDOT will implement single-lane closures while this work is completed.

Pennsylvania has some of the oldest bridges in the country, with an age of more than 50 years on average. Preventive maintenance is vital in extending the life of the structures. As such, PennDOT maintenance crews perform some bridge deck patching and structural repairs.

Shoulder Maintenance

• Route 22 between the Huntingdon-Mifflin County line and Pine Hill Road in Wayne Township. Thursday, September 3, and Friday, September 4. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.
• Route 103 between McVey’s Road in Wayne Township and John Street in Bratton Township. Monday, August 31, through Friday, September 4. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.
• All of Route 3007 (Wakefield Road) in Oliver Township. Friday, September 4. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.

Shoulder cutting removes excess material and debris from unpaved shoulder areas. Shoulder grading involves the shaping and stabilizing of those same areas. Both operations improve drainage, allow water to leave the roadway, and eliminate shoulder drop-offs. These are crucial highway maintenance operations because when drainage systems do not function properly, water collects on the road, weakens pavement, accelerates the formation of potholes, and creates the potential for icing conditions in the winter months.

Side Dozing

• Route 322 between the Milroy and Reedsville-Belleville exits. Monday, August 31, through Friday, September 4. PennDOT will implement single-lane closures while this work is completed.

Side dozing removes excess material from beneath guide rail areas, which improves drainage and allows water to sheet flow off the roadway. Side dozing is a crucial highway maintenance operation because when drainage systems do not function properly, water collects on the road, weakens pavement, accelerates the formation of potholes, and creates the potential for icing conditions in the winter months.

This schedule is subject to change due to weather conditions, emergencies, or other unforeseen interruptions.

For more information on PennDOT’s maintenance activities, visit https://www.pa.gov/agencies/penndot/about-penndot/strategic-planning-and-operations/penndot-maintenance-activities

Drivers can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,200 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.

PennDOT Maintenance Activities

🚧 ALLEY & ROAD CLOSURE NOTICE 🚧Please be advised that the following areas will be closed this week as improvements are m...
08/24/2026

🚧 ALLEY & ROAD CLOSURE NOTICE 🚧

Please be advised that the following areas will be closed this week as improvements are made:

📍 Lehigh Alley — Wilson Avenue to West Charles Street
• Milling: Monday & Tuesday
• Paving: Wednesday–Friday

📍 Susquehanna Avenue — Grand Parkway North to the corner entrance of Mitchell Field (see map)
• Milling: Monday & Tuesday
• Paving: Wednesday–Friday

🚗 Please avoid these areas and plan alternate routes while the work is being completed.

We appreciate your patience and cooperation as we make improvements to these areas. Thank you!

FOR IMMEDIATE RELEASEAugust 10, 2026MEDIA CONTACTS: Timothy Nebgen, tnebgen@pa.gov or 814-765-0598Steve Harmic, sharmic@...
08/10/2026

FOR IMMEDIATE RELEASE
August 10, 2026

MEDIA CONTACTS: Timothy Nebgen, [email protected] or 814-765-0598
Steve Harmic, [email protected] or 814-496-6189

PennDOT Mifflin County Maintenance Work Schedule for the Week of August 10

Clearfield, PA – The Pennsylvania Department of Transportation (PennDOT) announced the following schedule of maintenance activities in Mifflin County the week of August 10. PennDOT performs year-round maintenance in its mission to provide a safe, efficient transportation system, and the scope of work in Mifflin County for the coming week is as follows:

Bridge Maintenance & Cleaning

• Route 22 at a bridge spanning the Lewistown Bypass in Granville Township. Friday, August 14. PennDOT will implement single-lane closures while this work is completed.
• Route 322 between the Centre-Mifflin County line and the Burnham Exit. Monday, August 10, through Thursday, August 13. PennDOT will implement single-lane closures while this work is completed.

Pennsylvania has some of the oldest bridges in the country, with an with an average age of more than 50 years. Preventive maintenance is vital in extending the life of the structures. As such, PennDOT maintenance crews perform some bridge deck patching and structural repairs.

Pipe Replacement & Cleaning

• Route 333 between Risky Road and Hawsbrick Street in Granville Township. Monday, August 10, and Tuesday, August 11. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.

Pipe replacement and cleaning are essential in maintaining water flow around state roadways. Controlling water flow is one of the most important aspects of maintaining pavements. Uncontrolled water flow will damage both the pavement surface and the area under the pavement, which causes deterioration across the length of the pipe.

Shoulder Maintenance

• Route 22 eastbound and westbound at the ramps for the Business 22 exit. Wednesday, August 12, and Thursday, August 13. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.
• Route 22 eastbound and westbound at the ramps for the 322 West-State College exit. Friday, August 14. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.

Shoulder cutting removes excess material and debris from unpaved shoulder areas. Shoulder grading involves the shaping and stabilizing of those same areas. Both operations improve drainage, allow water to leave the roadway, and eliminate shoulder drop-offs. These are crucial highway maintenance operations because when drainage systems do not function properly, water collects on the road, weakens pavement, accelerates the formation of potholes, and creates the potential for icing conditions in the winter months.

Side Dozing

• Route 322 between a runaway truck ramp at the top of Seven Mountains and bridges spanning Laurel Creek in Armagh Township. Monday, August 10, through Thursday, August 13. PennDOT will implement single-lane closures while this work is completed.

Side dozing removes excess material from beneath guide rail areas, which improves drainage and allows water to sheet flow off the roadway. Side dozing is a crucial highway maintenance operation because when drainage systems do not function properly, water collects on the road, weakens pavement, accelerates the formation of potholes, and creates the potential for icing conditions in the winter months.

This schedule is subject to change due to weather conditions, emergencies, or other unforeseen interruptions.

Customers can report road concerns by calling 1-800-FIX-ROAD. If you call after hours, please leave a name and phone number.

For more information on PennDOT’s maintenance activities, visit https://www.pa.gov/agencies/penndot/about-penndot/strategic-planning-and-operations/penndot-maintenance-activities

Drivers can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,200 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.

Find PennDOT’s planned and active construction projects at www.pa.gov/DOTprojects.
Subscribe to PennDOT news and find transportation results in Cameron, Centre, Clearfield, Clinton, Elk, Juniata, McKean, Mifflin, and Potter counties at www.pa.gov/DOTdistrict2.

FOR IMMEDIATE RELEASE FROM PENNSYLVANIA DOT:August 3, 2026MEDIA CONTACTS: Timothy Nebgen, tnebgen@pa.gov or 814-765-0598...
08/04/2026

FOR IMMEDIATE RELEASE FROM PENNSYLVANIA DOT:
August 3, 2026

MEDIA CONTACTS: Timothy Nebgen, [email protected] or 814-765-0598
Steve Harmic, [email protected] or 814-496-6189

PennDOT Mifflin County Maintenance Work Schedule for the Week of August 3

Clearfield, PA – The Pennsylvania Department of Transportation (PennDOT) announced the following schedule of maintenance activities in Mifflin County the week of August 3. PennDOT performs year-round maintenance in its mission to provide a safe, efficient transportation system, and the scope of work in Mifflin County for the coming week is as follows:

Bridge Maintenance & Cleaning

• Route 322 at a bridge spanning Route 4001 (Woodland Road) and Tea Creek approximately one mile north of Reedsville in Brown Township. Monday, August 3, and Tuesday, August 4. PennDOT will implement single-lane closures while this work is completed.
• Route 322 at a bridge spanning Route 655 in Brown Township. Wednesday, August 5, and Thursday, August 6. PennDOT will implement single-lane closures while this work is completed.
• Route 22 at a bridge spanning the Lewistown Bypass in Granville Township. Thursday, August 6, and Friday, August 7. PennDOT will implement single-lane closures while this work is completed.

Pennsylvania has some of the oldest bridges in the country, with an with an average age of more than 50 years. Preventive maintenance is vital in extending the life of the structures. As such, PennDOT maintenance crews perform some bridge deck patching and structural repairs.

Pipe Replacement & Cleaning

• Route 103 between Ten Acre Lane and Route 3014 (John Street) in Bratton Township. Monday, August 3, and Tuesday, August 4. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.
• Route 333 between Risky Road and Hawsbrick Street in Granville Township. Wednesday, August 5, through Friday, August 7. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.

Pipe replacement and cleaning are essential in maintaining water flow around state roadways. Controlling water flow is one of the most important aspects of maintaining pavements. Uncontrolled water flow will damage both the pavement surface and the area under the pavement, which causes deterioration across the length of the pipe.

Side Dozing

• Route 322 between the Reedsville-Belleville exit in Brown Township. Monday, August 3, through Friday, August 7. PennDOT will implement single-lane closures while this work is completed.

Side dozing removes excess material from beneath guide rail areas, which improves drainage and allows water to sheet flow off the roadway. Side dozing is a crucial highway maintenance operation because when drainage systems do not function properly, water collects on the road, weakens pavement, accelerates the formation of potholes, and creates the potential for icing conditions in the winter months.

This schedule is subject to change due to weather conditions, emergencies, or other unforeseen interruptions.

Customers can report road concerns by calling 1-800-FIX-ROAD. If you call after hours, please leave a name and phone number.

For more information on PennDOT’s maintenance activities, visit https://www.pa.gov/agencies/penndot/about-penndot/strategic-planning-and-operations/penndot-maintenance-activities

Drivers can check conditions on major roadways by visiting www.511PA.com. 511PA, which is free and available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,200 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following regional X alerts.

Find PennDOT’s planned and active construction projects at www.pa.gov/DOTprojects.
Subscribe to PennDOT news and find transportation results in Cameron, Centre, Clearfield, Clinton, Elk, Juniata, McKean, Mifflin, and Potter counties at www.pa.gov/DOTdistrict2.

🚧 Road Closure Notice – Fairview Place 🚧The Borough will be completing stormwater repairs on Monday, July 13 on Fairview...
07/10/2026

🚧 Road Closure Notice – Fairview Place 🚧

The Borough will be completing stormwater repairs on Monday, July 13 on Fairview Place.

Fairview Place will be closed in the area of 1 Fairview Place while the work is being completed. Please use an alternate route and allow extra travel time if you normally travel through this area.

We appreciate your patience and cooperation as we complete these necessary repairs to improve our stormwater system.

Please plan accordingly. Thank you!

06/29/2026
06/15/2026

PennDOT Mifflin County Maintenance Work Schedule for the Week of June 15

Clearfield, PA – The Pennsylvania Department of Transportation (PennDOT) announced the following schedule of maintenance activities in Mifflin County the week of June 15. PennDOT performs year-round maintenance in its mission to provide a safe, efficient transportation system, and the scope of work in Mifflin County for the coming week is as follows:

Joint & Crack Sealing (Hot Pour Mastic)

• Route 655 between the Huntington-Mifflin County line in Menno Township and the intersection of Tea Creek Road in Brown Township. Monday, June 15, through Thursday, June 18. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.

Crack sealing and hot pour mastic operations prevent water intrusion from seeping through cracks or joints in an asphalt road, which can lead to potholes and pavement breakup. They are proactive preventive maintenance strategies to prevent water from entering the roadways and accelerating the formation of potholes and other failures.

Patching

• Route 2004 (Green Avenue/Back Maitland Road) between Kishacoquillas Street in Lewistown Borough and MT Spring Lane in Decatur Township. Monday, June 15, through Thursday, June 18. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.

This schedule is subject to change due to weather conditions, emergencies, or other unforeseen interruptions.

Customers can report road concerns by calling 1-800-FIX-ROAD. If you call after hours, please leave a name and phone number.

06/11/2026

🚧 RAILROAD CROSSING UPGRADES – TRAFFIC & PARKING NOTICE 🚧

Beginning Friday, June 12, NO PARKING will be permitted on West Water Street between South Juniata Street and South Wayne Street in preparation for upcoming railroad crossing improvements.

Starting Monday, June 15, North Shore Railroad will begin upgrades to the railroad tracks located on West Water Street between South Juniata Street and South Wayne Street. The project will include the removal of deteriorated concrete crossing panels and their replacement with asphalt base and asphalt wearing course materials.

🗓 Project Schedule

Work begins: Monday, June 15
Expected completion: Wednesday, June 17
All work is weather dependent.

🚧 Road Closure
During construction, West Water Street will be closed to through traffic between South Juniata Street and South Wayne Street.

🚫 Parking Restrictions
To allow for the safe movement of construction equipment and crews, parking will not be permitted along this section of West Water Street. Parking spaces will be clearly marked and blocked off during the project.

Please observe all posted parking restrictions and traffic control measures to help ensure the work can be completed safely and efficiently.

We appreciate your patience and cooperation during these improvements. Thank you! 🚂👷‍♂️🚧

Address

2 East Third Street
Lewistown, PA
17044

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 4pm

Telephone

+17172481361

Alerts

Be the first to know and let us send you an email when Borough of Lewistown posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Borough of Lewistown:

Shortcuts

Share