Zoeller Engineered Products

Zoeller Engineered Products Over 90% of our products are made in the USA with a majority of US content. They design and build complete customized pump systems for moving wastewater.

Zoeller Engineered Products has decades of experience in the commercial and municipal water industry. With 97% of their product being made in the USA using a majority of US content, ZEP is proud of their American heritage and US commitment.

The addition of our cap and shell mills in the early 2000s served as another great ergonomic improvement for the Grind d...
05/04/2026

The addition of our cap and shell mills in the early 2000s served as another great ergonomic improvement for the Grind department. Previously, all parts had to be milled in the main grind room where the work of grinding a flat surface is a bit more demanding.

Our mills need to be loaded, unloaded, and have the parts checked for quality. This drastically reduced the physical workload of team members.

Just outside the main grind room, four heavy‑duty mills work nonstop to create smooth, perfectly flat surfaces - ground ...
04/06/2026

Just outside the main grind room, four heavy‑duty mills work nonstop to create smooth, perfectly flat surfaces - ground to within .002 of an inch.

That precision ensures every component fits tight during assembly, helping our pumps stay leak‑free and built to last.

Quality is monitored throughout every stage of our Paint room process. During hanging, parts are inspected for any issue...
03/09/2026

Quality is monitored throughout every stage of our Paint room process. During hanging, parts are inspected for any issues that may have occurred during shipment or at the foundry before they move forward.

After curing in the oven, each batch undergoes a cure test to confirm the powder coat is properly bonded and durable. Parts that need touch-ups are rewashed and repainted to meet Zoeller’s standards.

These layered checks help ensure consistent performance and reliability in every product we make.

Join us TODAY at 11:00 AM EST for a practical walkthrough of Zoeller’s Pump Sizing Program.You’ll see how the software s...
02/25/2026

Join us TODAY at 11:00 AM EST for a practical walkthrough of Zoeller’s Pump Sizing Program.

You’ll see how the software simplifies pump selection, explore its newest features, and watch live examples of it in action. Presented by Michael Kelley, P.E., ZEP National Sales Manager.

Register Now: https://attendee.gotowebinar.com/register/589458530439888987?source=social

Once parts have been hung, acid washed, rinsed, and fully dried, they move on to powder coating. This tough, durable fin...
02/23/2026

Once parts have been hung, acid washed, rinsed, and fully dried, they move on to powder coating. This tough, durable finish helps protect our components from chipping and scratching as they continue through the manufacturing process.

A light texture is intentionally built into the coating so operators can safely grip and maneuver parts during machining, even when they’re wet. Thoughtful details like this keep our process efficient and our team safe.

Shoutout to Troy Barger for 31 years of craftsmanship and attention to detail that help Zoeller deliver reliable products every day.

After parts are carefully hung on custom Zoeller-made fixtures, they move into a critical cleaning stage. Each piece goe...
02/16/2026

After parts are carefully hung on custom Zoeller-made fixtures, they move into a critical cleaning stage. Each piece goes through an acid wash and rinse to remove cast iron dust from the raw castings and create the ideal surface for paint adhesion.

Next comes drying. External blower units shed excess water before parts enter a high-heat dryer, where a 24” fan and temperatures above 212°F remove all remaining moisture. This step ensures a smooth, long-lasting finish that performs in real-world conditions.

One week until we will see you at WWETT!Stop by the Zoeller booth (2217) this February 17-19th to see how we deliver dep...
02/10/2026

One week until we will see you at WWETT!

Stop by the Zoeller booth (2217) this February 17-19th to see how we deliver dependable water and wastewater solutions in real-world conditions. Our team will be onsite with live grinder pump demonstrations and technical experts ready to talk through your toughest applications.

See our grinder lineup here: https://zoellerpumps.com/product-category/pumps/grinder-pump/

Before any Zoeller product gets its signature finish, it starts with precision and care in our paint line.First up is ha...
02/09/2026

Before any Zoeller product gets its signature finish, it starts with precision and care in our paint line.

First up is hanging each part using custom-built hangers made right here by our Zoeller Tool Room team.

These hangers are incredibly durable, cycling through the line about 30 times before being cleaned in our oven to strip accumulated paint and reused again.

We only build new hangers when a new product design requires it, which keeps our process efficient, sustainable, and consistent.

Zoeller Operations made the switch to our trademarked ‘Zoeller Green’ in 1992.Before that, we had been using an olive-gr...
02/02/2026

Zoeller Operations made the switch to our trademarked ‘Zoeller Green’ in 1992.

Before that, we had been using an olive-green color. Today, the epoxy paint on our pumps is ‘Zoeller Green’ when applied to the parts, but when baked in the oven the shade of green that the curing process produces is actually a few shades darker.

The final product was so well-liked, however, that we kept it as is.

Address

3649 Cane Run Road
Louisville, KY
40211

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 4:30pm

Telephone

(800) 928-7867

Alerts

Be the first to know and let us send you an email when Zoeller Engineered Products posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Zoeller Engineered Products:

Share