Centralville Sewer Separation Project

Centralville Sewer Separation Project The Centralville Sewer Separation Project will separate stormwater from sewer pipes to reduce flooding and improve Merrimack River water quality.

Work will occur in phases, with updates shared throughout construction.

Water is back on just flushing it out
06/03/2026

Water is back on just flushing it out

06/02/2026

Detours today : Billings Barker Ludlam (water pipes ) Lakeview Bunker Hill upper (NGrid work ) and lower (Drain)

06/02/2026

Water pipe has broken in the same area Barker and Billings . All those affected areas are waking up to no water. Apologies for the inconvenience

🚧 Centralville Sewer Separation Project Update 🚧Construction will continue the week of June 1, with crews active across ...
06/01/2026

🚧 Centralville Sewer Separation Project Update 🚧

Construction will continue the week of June 1, with crews active across Centralville on water main, sewer, drainage, bypass removal, and manhole rehabilitation work.

• Work is expected near Ludlam, Hildreth, Bunker Hill, Barker, Billings, Bridge, and Ennell Streets.
• Bunker Hill Avenue remains closed between Lakeview Avenue and West Sixth Street during active work.
• Planned water shutdowns are anticipated at select locations, with advance notice provided whenever possible.

View this week’s construction impacts:

Centralville Sewer Separation Project construction will continue the week of June 1, with utility work, planned water shutdowns, and traffic impacts expected in the project area.

Friday detours include Lakeview around Bunker Hill, Bunker Hill lower drain and sewer pipes  and NGrid is starting gas l...
05/29/2026

Friday detours include Lakeview around Bunker Hill, Bunker Hill lower drain and sewer pipes and NGrid is starting gas line replacement on the upper, Willard digging up the sewer bypass, Ludlam new water line install, Barker and Sutherland are part of those .

Willard (Bridge to Beacon ) Billings (Bridge to Barker) Ludlam ( Hildreth to Barker) Bunker Hill ( W 6th to Lakeview) La...
05/28/2026

Willard (Bridge to Beacon ) Billings (Bridge to Barker) Ludlam ( Hildreth to Barker) Bunker Hill ( W 6th to Lakeview) Lakeview ( Ferry to West ) all have construction and detours. Water shut down in the area around Barker and Billings MONDAY.

Happy hump Day detours will include Willard (Beacon to 19th ) Barker after By St , Ludlam at Hildreth, Bunker Hill ( Lak...
05/27/2026

Happy hump Day detours will include Willard (Beacon to 19th ) Barker after By St , Ludlam at Hildreth, Bunker Hill ( Lakeview to W 6th) Lakeview at Bunker Hill.

Back to the work week detours on Bunker Hill Lakeview Boynton and Ludlam.
05/26/2026

Back to the work week detours on Bunker Hill Lakeview Boynton and Ludlam.

05/22/2026

Mostly paving and cleaning up for the long weekend. No work on Monday. New sewer work continues on Bunker Hill between Lakeview and Carolyn. Hildreth and Barker have detours

Photo of the hockey rink in Lake Placid NY where the miracle on ice happened in the 1980 winter  Olympics. We have our o...
05/21/2026

Photo of the hockey rink in Lake Placid NY where the miracle on ice happened in the 1980 winter Olympics. We have our own Miracle happening in Lowell with this large separation project. Detours signs out LPD details helping with traffic, thanks , on Ludlam, Willard, Hildreth (Ennell to Ludlam) and of course Bunker Hill (lakeview to Carolyn)

Address

451 First Street Boulevard (Route 110)
Lowell, MA
01850

Alerts

Be the first to know and let us send you an email when Centralville Sewer Separation Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share