Centralville Sewer Separation Project

Directions Website

Centralville Sewer Separation Project The Centralville Sewer Separation Project will separate stormwater from sewer pipes to reduce flooding and improve Merrimack River water quality.

Work will occur in phases, with updates shared throughout construction.

CENTRALVILLE SEWER SEPARATION PROJECT Detours today include the continued 24/7 road closures on Bunker Hill (West Sixth ...
10/23/2026

CENTRALVILLE SEWER SEPARATION PROJECT
Detours today include the continued 24/7 road closures on Bunker Hill (West Sixth to Hildreth) and Hildreth ( Lilly to Bunker Hill). Ludlam ( Hildreth to Barker).

đźš§ Centralville Construction Update | Week of October 19 Sewer, water, and drainage work continues over the next three we...
10/19/2026

đźš§ Centralville Construction Update | Week of October 19

Sewer, water, and drainage work continues over the next three weeks. Crews expect to continue drainage outlet and chamber work near VFW Highway, resume culvert installation on Bunker Hill Avenue, and continue installing the 60-inch stormwater pipe on Hildreth Street. Rock drilling on Ludlam Street will also continue.

Water main, hydrant, and valve work is planned at several locations. Stormwater pipe installation along the Willard Street–Beacon Street–Twentieth Street route is expected during the weeks of October 26 and November 2.

The 24-hour closures on Bunker Hill Avenue between West Sixth Street and Hildreth Street, and on Hildreth Street, will continue. Please follow posted detours and allow extra travel time. Dates may change.

View the full three-week construction look-ahead: https://lowellwater.com/2026/10/19/upcoming-construction-schedule-week-ofoctober-5-2026/

Detours today include the continued 24/7 road closures on Bunker Hill (West Sixth to Hildreth) and Hildreth ( Lilly to B...
10/19/2026

Detours today include the continued 24/7 road closures on Bunker Hill (West Sixth to Hildreth) and Hildreth ( Lilly to Bunker Hill). Ludlam ( Hildreth to Barker).

Detours today include the continued 24/7 road closures on Bunker Hill (West Sixth to Hildreth) and Hildreth ( Lilly to B...
10/16/2026

Detours today include the continued 24/7 road closures on Bunker Hill (West Sixth to Hildreth) and Hildreth ( Lilly to Bunker Hill). Ludlam ( Hildreth to Barker).

Detours today include the continued 24/7 road closures on Bunker Hill (West Sixth to Hildreth) and Hildreth ( Lilly to B...
10/09/2026

Detours today include the continued 24/7 road closures on Bunker Hill (West Sixth to Hildreth) and Hildreth ( Lilly to Bunker Hill). Ludlam ( Hildreth to Barker) . Paving happening on Willard ( Bridge to Humphrey) Beacon ( 19th to Willard)

Address

451 First Street Boulevard (Route 110)
Lowell, MA
01850

Alerts