06/11/2026
The Housing Authority of Murray is upgrading the deadbolt lock system for all units. A contractor will be on site on Monday, June 15th, 2026. Their inspection will begin at approximately 8:30 a.m. and could go through mid-day Tuesday, June 16th.
Each front door lock will be inspected. They will not enter the unit, and you do not have to be home during this inspection. A member of the HAM maintenance staff will accompany the contractor.
Be sure and leave your front screen door unlocked both Monday and Tuesday.
Emails were sent out to residents with an email on file, and phone calls will be made tomorrow for those without a working email address.
Thank you for your cooperation.