Today our Highway crew had the pleasure of working with a top notch tree service to remove two dead and dangerous trees ...
08/18/2026

Today our Highway crew had the pleasure of working with a top notch tree service to remove two dead and dangerous trees from two of our Town Roads. Thank you VanEtten and Sons tree and crane service for your help.

Good evening everyone, please be informed that Church Street is now back open, it is not paved at this point, is safe an...
08/05/2026

Good evening everyone, please be informed that Church Street is now back open, it is not paved at this point, is safe and usable. Again thank you to our Highway crew for going above and beyond to get these repairs made, and the Street back open as soon as possible,

08/04/2026

Good evening to our Kreitmeir Road residents, here is what I received from the paving contractor as of today. There will be a crew there tomorrow to prep the road for paving, and paving will take place on Thursday. This of course depends on whether we get more rain.

Thanks
Alan

08/04/2026

Good afternoon all, Main Street is back open for the night, we will need to close it again tomorrow morning to install one more run of culvert pipe, then the drainage portion of the project will be complete, and we can start putting the road surface on Church Street back together.

08/03/2026

Good afternoon all, as work continues on Church Street in NewBaltimore, there will be a necessary closure on Main Street between the north and south ends of Mill Street to allow for the connection of the new Church Street drainage system into the storm drain on the east side of Main Street. We anticipate this to take at least a few hours beginning at around 7am. Main Street will immediately be reopened once these connections are made. We appreciate your patience and understanding during this process.

AlanVanWormer
Highway Superintendent
Town of New Baltimore
518-567-4961

08/02/2026

Good evening all, our plan for tomorrow is for our Highway crew to be back working on Church Street, installing more new plastic culvert pipe. Thank everyone for your patience during this unexpected reconstruction project. This is of course barring any heavy rain.

We will also be checking on a potential culvert issue on South Ridge Road.

Thanks
Alan

07/29/2026

Church Street Closed from Rt. 144 to Main Street. PLEASE FO NOT DRIVE AROUND CLOSURE!

07/29/2026

Good morning, we are very aware of the current situation, the following Town Roads are closed due to flooding at the present time. Lime kiln Road between Haas Hill Road and Scheller Park Road, there is a tree partially down on Roberts Hill Road just south of Reservoir Road, with power wires in it, we will address that once the wires have been removed. Main Street is Closed between church street and Washington Ave, due to major flooding, and there is a huge amount of water running down Rt. 144 from Gill Road to Church Street, use extreme caution in that area. Be very careful of standing water on all roadways.

Alan

07/28/2026

Good morning to our Kreitmeir Road folks, after speaking with the paving contractor yesterday, the paving has been moved to mid to late next week, as they are running about a week behind schedule do to the recent rain. I will keep you all posted as new information reaches me.

Thanks
AlanVanWormer
Highway Superintendent
Town of NewBaltimore
518-567-4961

Address

182 West Deans Mill Road
New Baltimore, NY
12192

Telephone

+15185674961

Website

Alerts

Be the first to know and let us send you an email when Alan’s Road Report posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Alan’s Road Report:

Shortcuts

Share

Category