11/02/2025
Another year, another wall restoration. The front and back walls on this end had to be pinned back to the side walls with rebar drilled and epoxied into the walls. The 3rd floor window needed extensive repair to the top framing and side trim as well as the sill. All sealed up and hope to not revisit this side for a few years!