08/18/2026
Earlier this year, it was brought to my attention a situation in Old Orchard Village, which was alarming to say the least.
We had the opportunity to meet with some residents where I saw first hand a horrible water leak.
I returned several times later to monitor this situation, as residents had been assured that this would be addressed and that MacDonald Excavation would be coming to work on this issue.
In mid June, I again returned to the location, this time along with OOB Code Enforcement, where we saw that this issue indeed had not been resolved and in fact might have gotten worse.
Code Enforcement planned to followup with the Property Management.
In late July, I learned that this situation remained unresolved.
I have been working with ME Dept of Environmental Protection as well as with the ME CDC Drinking Water Program Director.
This was not on Maine Water Company’s radar, however after contacting the ME CDC, Maine Water did send out an inspector to investigate this situation, where it was discovered that the erosion was so significant that electrical lines were at risk for being exposed.
This information was also forward to the Manufactured Housing Unit at MOCA so that they can follow up on on-site conditions at the park.
As of Friday, August 14, the property manager informed Maine Water that MacDonald Excavation would be coming to work on this issue this week.
Maine Water will continue to monitor this situation, as will I.
I am encouraged that our involvement with various State Departments have helped to facilitate a resolve to this horrible situation where residents homes are literally sinking into the ground.
I will continue to keep folks informed as we move forward.